Nobles Wind Project
19469 McCall Ave, Reading, MN 56165Plant Summary Information
Nobles Wind Project is ranked #13 out of 784 power plants in Minnesota in terms of total annual net electricity generation.
Nobles Wind Project generated 128.8 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Nobles Wind Project |
|---|---|
| Utility Name | Northern States Power Co - Minnesota |
| Location | Nobles County, MN |
| Initial Operation Date | December 2010 |
| Last Update | Aug 2026 |
| Annual Generation | 784.7 GWh |
| Annual Consumption | 2.8 M MMBtu |
| Ranked #929 out of 13,301 Power Plants Nationwide | |
| Ranked #167 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #13 out of 784 Minnesota Power Plants | |
| Ranked #4 out of 124 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
Map of Nobles Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nobles Wind Project.
Monthly Net Generation for Nobles Wind Project
Monthly Plant Fuel Consumption for Nobles Wind Project
Nobles Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Nobles Wind Project (57047) |
| Plant Address | 19469 McCall Ave, Reading, MN 56165 |
| Utility | Northern States Power Co - Minnesota (13781) |
| Latitude, Longitude | 43.7036, -95.7131 |
| Generation Dates on File | Dec 2010 to Aug 2026 |
| Initial Operation Date | December 2010 |
| Annual Generation | 784.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2010
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | NSP NOBLES NOBLES_CWS1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP NOBLES NOBLES_CWS1 |
| Nameplate Capacity | 201 MW |
| Summer Capacity | 201 MW |
| Winter Capacity | 201 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 134 |
| Turbine Details | |
| Number Of Turbines | 134 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Nobles Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #157 | Clearwater Wind East | Miles City, MT | 793.5 GWh |
| #158 | Ekola Flats | Medicine Bow, WY | 792.8 GWh |
| #159 | Crocker Wind Farm | Conde, SD | 791.5 GWh |
| #160 | Lower Snake River Wind Energy Project | Pomeroy, WA | 789.4 GWh |
| #161 | Atchison County Wind | Westboro, MO | 789.1 GWh |
| #162 | Willow Creek Wind (OK) | Morrison, OK | 788.4 GWh |
| #163 | Golden Plains | Buffalo Center, IA | 788.0 GWh |
| #164 | Pattern Gulf Wind | Armstrong, TX | 787.9 GWh |
| #165 | Burke Wind, LLC | Bowbells, ND | 787.2 GWh |
| #166 | Las Majadas Wind Farm | Santa Monica, TX | 784.9 GWh |
| #168 | Red Pine Wind Project | Ivanhoe, MN | 783.6 GWh |
| #169 | Niyol Wind, LLC | Fleming, CO | 782.1 GWh |
| #170 | Miami Wind Energy Center | Miami, TX | 780.1 GWh |
| #171 | Walnut Ridge Wind Farm | Sheffield, IL | 776.6 GWh |
| #172 | Bronco Plains Wind II, LLC | Kit Carson, CO | 776.5 GWh |
| #173 | Cedar Bluff Wind, LLC | Brownwell, KS | 776.4 GWh |
| #174 | King Plains Wind Project | Garber, OK | 773.4 GWh |
| #175 | Cimarron Bend Wind Project II, LLC | Minneola, KS | 772.3 GWh |
| #176 | Plum Creek Wind Project (NE) | Winside, NE | 772.0 GWh |
| #177 | Heartland Divide II | Audubon, IA | 769.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nobles Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adrian | Adrian, MN | 12.0 MWh | 11.9 mi |
| Auriga Community Solar | Slayton, MN | 1.8 GWh | 19.1 mi |
| B&K Energy Systems LLC | Brewster, MN | 4.7 GWh | 17.3 mi |
| Cisco | Brewster, MN | 11.9 GWh | 17.9 mi |
| Community Wind South | Rushmore, MN | 87.9 GWh | 4.5 mi |
| DL Windy Acres LLC | Brewster, MN | 4.7 GWh | 17.6 mi |
| Eastridge Wind Project | Porter, MN | 13.8 GWh | 19.1 mi |
| Ewington Energy Systems, LLC | Worthington, MN | 81.4 GWh | 15.9 mi |
| Fenton Wind Farm | Chandler, MN | 381.9 GWh | 18.4 mi |
| G Flow Wind LLC | Rushmore, MN | 2.5 GWh | 8.7 mi |
| Green Acres Breeze LLC | Rushmore, MN | 2.5 GWh | 8.8 mi |
| Minnesota Breeze LLC | Rushmore, MN | 2.5 GWh | 8.9 mi |
| Noble Ridge LLC | Wilmont, MN | 61.0 MWh | 7.8 mi |
| Nobles 2 Wind Project | Wilmont, MN | 958.3 GWh | 9.2 mi |
| S&P Windfarm LLC | Brewster, MN | 4.7 GWh | 16.9 mi |
| Slayton Solar | Slayton, MN | 2.3 GWh | 19.3 mi |
| South Fork Wind Farm | Round Lake, MN | 54.4 GWh | 18.7 mi |
| Sunset Breeze LLC | Rushmore, MN | 2.5 GWh | 9.1 mi |
| Wolf Wind Enterprises LLC | Rushmore, MN | 2.5 GWh | 9 mi |
| Worthington | Worthington, MN | 6.4 GWh | 7.1 mi |