Grand Meadow
228 Industrial Park, Dexter, MN 55926Plant Summary Information
Grand Meadow is ranked #27 out of 759 power plants in Minnesota in terms of total annual net electricity generation.
Grand Meadow generated 114.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Grand Meadow |
|---|---|
| Utility Name | Northern States Power Co - Minnesota |
| Location | Mower County, MN |
| Initial Operation Date | December 2008 |
| Last Update | Dec 2024 |
| Annual Generation | 380.3 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,647 out of 12,539 Power Plants Nationwide | |
| Ranked #476 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #27 out of 759 Minnesota Power Plants | |
| Ranked #13 out of 125 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
Map of Grand Meadow
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grand Meadow.
Monthly Net Generation for Grand Meadow
Grand Meadow Details
| Summary Information | |
|---|---|
| Plant Name | Grand Meadow (56994) |
| Plant Address | 228 Industrial Park, Dexter, MN 55926 |
| Utility | Northern States Power Co - Minnesota (13781) |
| Latitude, Longitude | 43.7189, -92.705 |
| Generation Dates on File | Jan 2009 to Dec 2024 |
| Initial Operation Date | December 2008 |
| Annual Generation | 380.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Great River Energy (7570) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator WND67 Details Operating December 2008
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | NSP GDMNSP GDMEADOW_UNIT |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP GDMNSP GDMEADOW_UNIT |
| Nameplate Capacity | 100.5 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2008 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 67 |
| Turbine Details | |
| Number Of Turbines | 67 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262 |
Grand Meadow Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #466 | Lost Creek Wind Energy Facility | King City, MO | 385.8 GWh |
| #467 | Timber Road IV | Payne, OH | 384.3 GWh |
| #468 | Prosperity Wind | Deland, IL | 383.9 GWh |
| #469 | New Frontier Wind | Ruso, ND | 383.7 GWh |
| #470 | Cottonwood Wind Energy Center | Blue Hill, NE | 383.6 GWh |
| #471 | Coyote Ridge | White, SD | 382.5 GWh |
| #472 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh |
| #473 | Black Rock Wind | Elk Garden, WV | 381.4 GWh |
| #474 | Baldwin Wind LLC | Wilton, ND | 381.1 GWh |
| #475 | Oliver Wind III, LLC | Mandan, ND | 380.9 GWh |
| #477 | Alta Wind X | Mojave, CA | 379.0 GWh |
| #478 | Trimont Area Wind Farm | Trimont, MN | 378.9 GWh |
| #479 | Prairie Winds SD1 | Crow Lake, SD | 378.9 GWh |
| #480 | Bluff Point Wind Facility | Portland, IN | 378.9 GWh |
| #481 | Victory Wind Farm | Westside, IA | 378.4 GWh |
| #482 | Elbow Creek Wind Project LLC | Forsan, TX | 376.7 GWh |
| #483 | White Oak Energy LLC | Carlock, IL | 376.2 GWh |
| #484 | Wildhorse Mountain Wind Facility | Clayton, OK | 375.7 GWh |
| #485 | Glacier Hills | Cambria, WI | 374.6 GWh |
| #486 | Wolf Ridge Wind | Muenster, TX | 374.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grand Meadow.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Wind Farm | Adams, MN | 20.2 GWh | 11.4 mi |
| Blooming Prairie | Blooming Prairie, MN | 234.0 MWh | 20 mi |
| Dodge Holdco Solar CSG | Kasson, MN | 7.6 GWh | 21.1 mi |
| Fillmore County Solar Project | Spring Valley, MN | 75.6 GWh | 20.9 mi |
| G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 94.0 GWh | 19.4 mi |
| Hayfield Solar I LLC CSG | Hayfield, MN | 1.5 GWh | 14.6 mi |
| Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh | 15.9 mi |
| Louise Solar | Taopi, MN | 82.6 GWh | 10.9 mi |
| Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh | 9 mi |
| Novel Byron Solar CSG | Byron, MN | 1.9 GWh | 20.6 mi |
| Novel DeCook Solar CSG | Byron, MN | 1.5 GWh | 20.7 mi |
| Novel Schmoll Farms Solar CSG | Dodge Center, MN | 1.9 GWh | 19 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 864.6 GWh | 16.9 mi |
| Pleasant Valley (MN) | Dexter, MN | 85.9 GWh | 5.7 mi |
| Pleasant Valley Wind Farm | Dexter, MN | 770.3 GWh | 6.8 mi |
| Prairie Star Wind Farm | Grand Meadow, MN | 298.2 GWh | 4.5 mi |
| Spring Valley | Spring Valley, MN | 156.8 MWh | 15.9 mi |
| Turtle Creek Wind Farm LLC | St. Ansgar, IA | 725.5 GWh | 21.1 mi |
| Tweite Community Solar LLC | Byron, MN | 1.7 GWh | 21.2 mi |
| Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh | 5.8 mi |