Cedar Hills Wind Farm
HWY 12, Rhame, ND 58651Plant Summary Information
Cedar Hills Wind Farm is ranked #48 out of 57 power plants in North Dakota in terms of total annual net electricity generation.
Cedar Hills Wind Farm generated 13.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cedar Hills Wind Farm |
---|---|
Utility Name | Montana-Dakota Utilities Co |
Location | Bowman County, ND |
Initial Operation Date | June 2010 |
Last Update | Dec 2024 |
Annual Generation | 55.6 GWh |
Annual Consumption | 204.6 k MMBtu |
Ranked #3,910 out of 12,312 Power Plants Nationwide | |
Ranked #986 out of 1,355 Wind Power Plants Nationwide | |
Ranked #48 out of 57 North Dakota Power Plants | |
Ranked #38 out of 40 North Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of Cedar Hills Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Hills Wind Farm.
Monthly Net Generation for Cedar Hills Wind Farm
Cedar Hills Wind Farm Details
Summary Information | |
---|---|
Plant Name | Cedar Hills Wind Farm (57171) |
Plant Address | HWY 12, Rhame, ND 58651 |
Utility | Montana-Dakota Utilities Co (12199) |
Latitude, Longitude | 46.24556, -103.76722 |
Generation Dates on File | Jun 2010 to Dec 2024 |
Initial Operation Date | June 2010 |
Annual Generation | 55.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Montana-Dakota Utilities Co (12199) ND |
Grid Voltage | 57.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MDU.CEDARHLS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MDU.CEDARHLS |
Nameplate Capacity | 19.5 MW |
Summer Capacity | 19.5 MW |
Winter Capacity | 19.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 13 |
Turbine Details | |
Number Of Turbines | 13 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5-77 |
Design Wind Speed | 12 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Cedar Hills Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#976 | Red Horse 2 | Willcox, AZ | 187.5 GWh |
#977 | Ryegrass Windfarm | Glenns Ferry, ID | 57.9 GWh |
#978 | Montfort Wind Energy Center | Montfort, WI | 57.7 GWh |
#979 | Kahuku Wind Power LLC | Honolulu, HI | 57.4 GWh |
#980 | Oasis Alta | Mojave, CA | 57.0 GWh |
#981 | Wildcat Wind | Lovington, NM | 56.4 GWh |
#982 | Milner Dam Wind Park LLC | Burley, ID | 56.2 GWh |
#983 | Big Spring Wind Power Facility | Big Spring, TX | 56.0 GWh |
#984 | Kaheawa Wind Power II LLC | Wailuku, HI | 55.8 GWh |
#985 | Cold Springs Windfarm | Glenns Ferry, ID | 55.6 GWh |
#987 | Coram Tehachapi | Tehachapi, CA | 55.4 GWh |
#988 | Crosswind Energy Project | Ruthven, IA | 55.3 GWh |
#989 | Steel Winds Wind Farm | Lackawanna, NY | 54.9 GWh |
#990 | Grant County Wind LLC | Woodstock, MN | 54.9 GWh |
#991 | Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh |
#992 | BayWa r.e Mozart LLC | Jayton, TX | 54.1 GWh |
#993 | Carroll Area Wind Farm | Templeton, IA | 53.8 GWh |
#994 | Spruce Mountain WInd | Bryant Pond, ME | 53.8 GWh |
#995 | McKinley Wind Park | Pigeon, MI | 53.7 GWh |
#996 | Power County Wind Park South | American Falls, ID | 53.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Hills Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Valley | Beulah, ND | 5.6 TWh | 119.9 mi |
Brady II Wind Energy Center | Dickinson, ND | 666.8 GWh | 53 mi |
Brady Wind Energy Center | Dickinson, ND | 632.3 GWh | 55.2 mi |
Coyote | Beulah, ND | 1.8 TWh | 114.4 mi |
Culbertson Generation Station | Culbertson, MT | 251.2 GWh | 138.9 mi |
Diamond Willow Wind Facility | Baker, MT | 86.0 GWh | 20 mi |
Dry Fork Station | Gillette, WY | 2.5 TWh | 152.4 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 447.6 GWh | 105.1 mi |
Glendive GT | Glendive, MT | 2.6 GWh | 72.4 mi |
Lewis & Clark | Richland, MT | 3.4 GWh | 100.7 mi |
Lonesome Creek Station | Alexander, ND | 1.1 TWh | 107.5 mi |
OREG 1 Inc | Culbertson, MT | 154.2 GWh | 139.2 mi |
OREG 2 Inc | Culbertson, MT | 111.3 GWh | 139.2 mi |
Pioneer Generation Station | Williston, ND | 1.1 TWh | 137.6 mi |
Spearfish Hydro | Spearfish, SD | 19.9 GWh | 122.2 mi |
Sunflower Wind Project | Mandan, ND | 450.9 GWh | 90.2 mi |
Thunder Spirit Wind, LLC | Hettinger, ND | 522.6 GWh | 58.8 mi |
Willow Creek Wind Power LLC | Newell, SD | 376.5 GWh | 101.8 mi |
Wygen 2 | Gillette, WY | 581.5 GWh | 156.1 mi |
Wygen III | Gillette, WY | 670.7 GWh | 156.1 mi |