Iowa Lakes Community College Wind Farm
1802 19th Street, Estherville, IA 51334Plant Summary Information
Iowa Lakes Community College Wind Farm is ranked #123 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Iowa Lakes Community College Wind Farm generated 10.0 MWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Iowa Lakes Community College Wind Farm |
|---|---|
| Utility Name | Iowa Lakes Community College |
| Location | Emmet County, IA |
| Initial Operation Date | February 2005 |
| Last Update | Mar 2026 |
| Annual Generation | 677.0 MWh |
| Annual Consumption | 2.8 k MMBtu |
| Ranked #11,412 out of 12,332 Power Plants Nationwide | |
| Ranked #1,345 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #194 out of 274 Iowa Power Plants | |
| Ranked #123 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Iowa Lakes Community College Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iowa Lakes Community College Wind Farm.
Monthly Net Generation for Iowa Lakes Community College Wind Farm
Monthly Plant Fuel Consumption for Iowa Lakes Community College Wind Farm
Iowa Lakes Community College Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Iowa Lakes Community College Wind Farm (57257) |
| Plant Address | 1802 19th Street, Estherville, IA 51334 |
| Utility | Iowa Lakes Community College (56617) |
| Latitude, Longitude | 43.38535, -94.81566 |
| Generation Dates on File | Jan 2010 to Mar 2026 |
| Initial Operation Date | February 2005 |
| Annual Generation | 677.0 MWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Estherville - (IA) (5998) IA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator VMN82 Details Operating February 2005
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.7 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2005 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 229.6 |
Iowa Lakes Community College Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1335 | Foundation Wal-Mart Red Bluff | Red Bluff, CA | 1.5 GWh |
| #1336 | Vestas Towers America, Inc. | Pueblo, CO | 1.5 GWh |
| #1337 | Snake River | Nome, AK | 32.0 GWh |
| #1338 | Henkel U.S. Operations Corporation | Geneva, NY | 1.5 GWh |
| #1339 | ZCO | Tehachapi, CA | 1.4 GWh |
| #1340 | Charlestown Wind Turbine | Charlestown, MA | 1.2 GWh |
| #1341 | Moorhead Wind Turbine | Moorhead, MN | 1.2 GWh |
| #1342 | Deer Island Treatment Plant | Winthrop, MA | 34.0 GWh |
| #1343 | Foundation Superior Farms | Dixon, CA | 939.0 MWh |
| #1344 | Euclid Farm, Stamco N-54 | Euclid, OH | 710.0 MWh |
| #1346 | Madison Windpower LLC | Madison, NY | 543.0 MWh |
| #1347 | Foundation IE | Rancho Cucamonga, CA | 373.0 MWh |
| #1348 | Pike County Wind Power | Pittsfield, IL | 355.0 MWh |
| #1349 | TG Windfarm LLC | Pipestone, MN | 288.0 MWh |
| #1350 | Bisson Windfarm LLC | Pipestone, MN | 288.0 MWh |
| #1351 | Tofteland Windfarm LLC | Pipestone, MN | 288.0 MWh |
| #1352 | Westridge Windfarm LLC | Woodstock, MN | 288.0 MWh |
| #1353 | Minwind | Luverne, MN | 276.0 MWh |
| #1354 | CG Windfarm LLC | Woodstock, MN | 144.0 MWh |
| #1355 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 307.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iowa Lakes Community College Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Crosswind Energy Project | Ruthven, IA | 55.3 GWh | 24 mi |
| Earl F Wisdom | Spencer, IA | 7.1 GWh | 27.1 mi |
| Elm Creek Wind II LLC | Trimont, MN | 205.4 GWh | 20.9 mi |
| Elm Creek Wind LLC | Trimont, MN | 176.1 GWh | 26.4 mi |
| Estherville | Estherville, IA | 199.0 MWh | 1.8 mi |
| Fairmont (MN) | Fairmont, MN | 6.1 GWh | 25.8 mi |
| Fairmont Wind | Fairmont, MN | 14.6 GWh | 22.7 mi |
| Flying Cloud Power Partners LLC | Lake Park, IA | 81.0 GWh | 24.3 mi |
| Graettinger | Graettinger, IA | 59.0 MWh | 10.6 mi |
| Iowa Lakes Superior Wind Farm | Superior, IA | 36.0 GWh | 9.2 mi |
| Lake Park | Lake Park, IA | 46.0 MWh | 25.3 mi |
| Lakefield Utilities | Lakefield, MN | 6.0 MWh | 26.7 mi |
| Lakefield Wind Project LLC | Lakefield, MN | 380.8 GWh | 26.3 mi |
| Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh | 25.6 mi |
| Milford | Milford, IA | 283.0 MWh | 17.2 mi |
| OREG 3 Inc | Trimont, MN | 43.7 GWh | 26.1 mi |
| Palo Alto Wind Farm | Emmetsburg, IA | 1.4 TWh | 18.3 mi |
| Poet Bioprocessing Emmetsburg | Emmetsburg, IA | 18.0 GWh | 22.1 mi |
| Spencer Gas Turbine | Spencer, IA | 651.0 MWh | 23.5 mi |
| Trimont Area Wind Farm | Trimont, MN | 378.9 GWh | 28.3 mi |