Wapsipinicon Wind Project
228 Industrial Park Drive, Dexter, MN 55926Plant Summary Information
Wapsipinicon Wind Project is ranked #40 out of 781 power plants in Minnesota in terms of total annual net electricity generation.
Wapsipinicon Wind Project generated 75.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wapsipinicon Wind Project |
|---|---|
| Utility Name | EDF Renewable Asset Holdings, Inc. |
| Location | Mower County, MN |
| Initial Operation Date | February 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 268.1 GWh |
| Annual Consumption | 989.3 k MMBtu |
| Ranked #2,173 out of 13,081 Power Plants Nationwide | |
| Ranked #651 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #40 out of 781 Minnesota Power Plants | |
| Ranked #24 out of 124 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2025) |
Map of Wapsipinicon Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wapsipinicon Wind Project.
Monthly Net Generation for Wapsipinicon Wind Project
Monthly Plant Fuel Consumption for Wapsipinicon Wind Project
Wapsipinicon Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Wapsipinicon Wind Project (56876) |
| Plant Address | 228 Industrial Park Drive, Dexter, MN 55926 |
| Utility | EDF Renewable Asset Holdings, Inc. (57170) |
| Latitude, Longitude | 43.8006, -92.6822 |
| Generation Dates on File | Feb 2009 to Dec 2025 |
| Initial Operation Date | February 2009 |
| Annual Generation | 268.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Great River Energy (7570) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator TBD Details Operating February 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 100.5 MW |
| Summer Capacity | 100.5 MW |
| Winter Capacity | 100.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 67 |
| Turbine Details | |
| Number Of Turbines | 67 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Wapsipinicon Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #641 | South Peak Wind | Geyser, MT | 272.5 GWh |
| #642 | South Trent Wind Farm | Sweetwater, TX | 272.3 GWh |
| #643 | Goat Wind LP | Sterling City, TX | 271.4 GWh |
| #644 | Hatchet Ridge Wind Project | Burney, CA | 271.3 GWh |
| #645 | Lost Lakes Wind Farm LLC | Lake Park, IA | 270.1 GWh |
| #646 | Bison 2 Wind Energy Center | New Salem, ND | 269.8 GWh |
| #647 | Leaning Juniper | Arlington, OR | 269.5 GWh |
| #648 | Rail Splitter Wind Farm | Hopedale, IL | 269.2 GWh |
| #649 | Stillwater Wind, LLC | Reed Point, MT | 269.2 GWh |
| #650 | Goodnoe Hills | Goldendale, WA | 268.3 GWh |
| #652 | Bison 3 Wind Energy Center | New Salem, ND | 267.9 GWh |
| #653 | Charles City Wind Farm | Charles City, IA | 267.7 GWh |
| #654 | Prairie Breeze II | Elgin, NE | 267.7 GWh |
| #655 | Mustang Hills LLC | Mojave, CA | 267.1 GWh |
| #656 | Armenia Mountain Wind Farm | Mainesburg, PA | 265.2 GWh |
| #657 | Elk River Wind | Beaumont, KS | 264.8 GWh |
| #658 | New Creek Wind | New Creek, WV | 263.4 GWh |
| #659 | New Harvest Wind Project LLC | Schleswig, IA | 263.0 GWh |
| #660 | Gratiot County Wind LLC | Breckenridge, MI | 262.3 GWh |
| #661 | Campbell Hill Windpower | Glenrock, WY | 261.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wapsipinicon Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Crux Community Solar | Kasson, MN | 1.9 GWh | 16.6 mi |
| Dodge Holdco Solar CSG | Kasson, MN | 7.3 GWh | 15.8 mi |
| DodgeSun CSG | Kasson, MN | 9.5 GWh | 16.6 mi |
| G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 90.7 GWh | 14.9 mi |
| Grand Meadow | Dexter, MN | 378.7 GWh | 5.8 mi |
| Grand Meadow (PV) | Grand Meadow, MN | 425.0 MWh | 11.1 mi |
| Hayfield Solar I LLC CSG | Hayfield, MN | 1.8 GWh | 11.3 mi |
| Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh | 12.1 mi |
| Hwy 14 Holdco Solar CSG | Byron, MN | 6.7 GWh | 15.9 mi |
| Lange Solar | Byron, MN | 1.7 GWh | 15.9 mi |
| Louise Solar | Taopi, MN | 90.6 GWh | 16.5 mi |
| Mower County Wind Energy Center | Grand Meadow, MN | 334.0 GWh | 13.5 mi |
| Novel Byron Solar CSG | Byron, MN | 1.8 GWh | 14.8 mi |
| Novel DeCook Solar CSG | Byron, MN | 1.8 GWh | 14.9 mi |
| Novel Schmoll Farms Solar CSG | Dodge Center, MN | 1.5 GWh | 14.7 mi |
| Pleasant Valley (MN) | Dexter, MN | 156.8 GWh | 0.1 mi |
| Pleasant Valley Wind Farm | Dexter, MN | 463.6 GWh | 4.4 mi |
| Prairie Star Wind Farm | Grand Meadow, MN | 303.3 GWh | 8.4 mi |
| Spring Valley | Spring Valley, MN | 227.4 MWh | 16.6 mi |
| Tweite Community Solar LLC | Byron, MN | 1.7 GWh | 15.5 mi |