Swift Air Solar III
8995 FM 1601, Odessa, TX 79763Plant Summary Information
Swift Air Solar III is ranked #157 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Swift Air Solar III generated 48.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Swift Air Solar III |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Ector County, TX |
| Initial Operation Date | Not Available |
| Last Update | Feb 2026 |
| Annual Generation | 54.6 GWh |
| Annual Consumption | 186.3 k MMBtu |
| Ranked #4,053 out of 12,637 Power Plants Nationwide | |
| Ranked #1,009 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #541 out of 820 Texas Power Plants | |
| Ranked #157 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Swift Air Solar III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Swift Air Solar III.
Monthly Net Generation for Swift Air Solar III
Monthly Plant Fuel Consumption for Swift Air Solar III
Swift Air Solar III Details
| Summary Information | |
|---|---|
| Plant Name | Swift Air Solar III (68588) |
| Plant Address | 8995 FM 1601, Odessa, TX 79763 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 31.72309, -102.51965 |
| Generation Dates on File | Nov 2025 to Feb 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 54.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Swift Air Solar III Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #999 | Oberon IB | Odessa, TX | 56.7 GWh |
| #1000 | Mechanicsville Solar | Mechanicsville, VA | 56.5 GWh |
| #1001 | Hazlehurst II | Hazlehurst, GA | 56.3 GWh |
| #1002 | Webberville Solar Project | Manor, TX | 56.3 GWh |
| #1003 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
| #1004 | Marine Corps Logistics Base Solar | Albany, GA | 55.7 GWh |
| #1005 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.6 GWh |
| #1006 | Apache Solar I | Cochise, AZ | 55.5 GWh |
| #1007 | SR McNeal | McNeal, AZ | 52.9 GWh |
| #1008 | Caden Energix Endless Caverns, LLC | New Market, VA | 54.7 GWh |
| #1010 | Dolores Canyon Solar | Cahone, CO | 54.5 GWh |
| #1011 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
| #1012 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
| #1013 | Techren Solar IV LLC | Boulder, NV | 54.0 GWh |
| #1014 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
| #1015 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
| #1016 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
| #1017 | Techren Solar III LLC | Boulder, NV | 53.2 GWh |
| #1018 | Innovative Solar 31 | Bladenboro, NC | 53.1 GWh |
| #1019 | Catalina Solar 2, LLC | Rosamond, CA | 52.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Swift Air Solar III.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh | 27.2 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 372.4 GWh | 35.5 mi |
| Crane Solar Project | Crane, TX | 401.1 GWh | 34.6 mi |
| Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 24.2 mi |
| Goldsmith | Goldsmith, TX | 184.0 MWh | 18.7 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 603.4 GWh | 39.1 mi |
| N. Mary Francis | Odessa, TX | 216.0 MWh | 14.7 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 236.5 GWh | 26.1 mi |
| Oberon IA | Odessa, TX | 288.4 GWh | 10.8 mi |
| Oberon IB | Odessa, TX | 56.7 GWh | 10.7 mi |
| Odessa-Ector Power Plant | Odessa, TX | 8.3 TWh | 13.9 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 20.4 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 27.8 mi |
| Phoebe Solar | Kermit, TX | 537.3 GWh | 22.1 mi |
| Pioneer Hutt Wind Energy | Midland, TX | 613.4 GWh | 36.5 mi |
| Quail Run Energy Center | Odessa, TX | 3.1 TWh | 14.5 mi |
| Swift Air Solar I | Goldsmith, TX | 364.7 GWh | 10.8 mi |
| Swift Air Solar II | Odessa, TX | 81.5 GWh | 0 mi |
| Upton County Solar | McCamey, TX | 281.8 GWh | 35.9 mi |
| Westover | Odessa, TX | 185.0 MWh | 8.9 mi |