Swift Air Solar III
8995 FM 1601, Odessa, TX 79763Plant Summary Information
Swift Air Solar III is ranked #189 out of 210 solar farms in Texas in terms of total annual net electricity generation.
Swift Air Solar III generated 5.7 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Swift Air Solar III |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Ector County, TX |
| Initial Operation Date | Not Available |
| Last Update | Nov 2025 |
| Annual Generation | 5.7 GWh |
| Annual Consumption | 19.5 k MMBtu |
| Ranked #7,776 out of 12,574 Power Plants Nationwide | |
| Ranked #3,017 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #622 out of 810 Texas Power Plants | |
| Ranked #189 out of 210 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Swift Air Solar III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Swift Air Solar III.
Monthly Net Generation for Swift Air Solar III
Swift Air Solar III Details
| Summary Information | |
|---|---|
| Plant Name | Swift Air Solar III (68588) |
| Plant Address | 8995 FM 1601, Odessa, TX 79763 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 31.72309, -102.51965 |
| Generation Dates on File | Nov 2025 to Nov 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 5.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Swift Air Solar III Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3007 | Coody Cochran | Cochran, GA | 5.8 GWh |
| #3008 | Partridgeville Hybrid CSG | Athol, MA | 5.7 GWh |
| #3009 | Empire Solar | Farmington, MN | 5.7 GWh |
| #3010 | 1073 Onslow Solar | Hubert, NC | 5.7 GWh |
| #3011 | US Foods Solar | Perth Amboy, NJ | 5.7 GWh |
| #3012 | Porterville Solar | Porterville, CA | 5.7 GWh |
| #3013 | Saratoga Solar III, LLC | Middle Grove, NY | 5.7 GWh |
| #3014 | Montague Site 36-Grosolar | Millers Falls, MA | 5.7 GWh |
| #3015 | GD Johnson Scituate I, LLC | Cranston, RI | 5.7 GWh |
| #3016 | Harwich Landfill | Harwich, MA | 5.7 GWh |
| #3018 | Bright Field Solar LLC(CSG) | Burns, NY | 5.7 GWh |
| #3019 | Kearsarge SKSC2 LLC | South Kingstown, RI | 5.7 GWh |
| #3020 | Marston Mills Solar | Marstons Mills, MA | 5.7 GWh |
| #3021 | SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | 5.7 GWh |
| #3022 | Hatfield Solar PV | Hatfield, MA | 5.7 GWh |
| #3023 | Putnam Erikson 2 | Eatonton, GA | 5.7 GWh |
| #3024 | 299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 5.6 GWh |
| #3025 | Carl Friedrich Gauss Solar | Halifax, NC | 5.7 GWh |
| #3026 | West Brookfield Solar - Gilbertsville Rd | West Brookfield, MA | 5.7 GWh |
| #3027 | Wolf | Brockport, NY | 5.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Swift Air Solar III.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 998.1 GWh | 27.2 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 386.0 GWh | 35.5 mi |
| Crane Solar Project | Crane, TX | 407.1 GWh | 34.6 mi |
| Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 24.2 mi |
| Goldsmith | Goldsmith, TX | 184.0 MWh | 18.7 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 564.3 GWh | 39.1 mi |
| N. Mary Francis | Odessa, TX | 216.0 MWh | 14.7 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 240.1 GWh | 26.1 mi |
| Oberon IA | Odessa, TX | 306.8 GWh | 10.8 mi |
| Oberon IB | Odessa, TX | 62.6 GWh | 10.7 mi |
| Odessa-Ector Power Plant | Odessa, TX | 7.9 TWh | 13.9 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 20.4 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 27.8 mi |
| Phoebe Solar | Kermit, TX | 559.3 GWh | 22.1 mi |
| Pioneer Hutt Wind Energy | Midland, TX | 606.1 GWh | 36.5 mi |
| Quail Run Energy Center | Odessa, TX | 3.1 TWh | 14.5 mi |
| Swift Air Solar I | Goldsmith, TX | 288.9 GWh | 10.8 mi |
| Swift Air Solar II | Odessa, TX | 14.3 GWh | 0 mi |
| Upton County Solar | McCamey, TX | 300.9 GWh | 35.9 mi |
| Westover | Odessa, TX | 185.0 MWh | 8.9 mi |