Walnut Bend Solar Station PV
5400 Lee Road 925, Moro, AR 72368Plant Summary Information
Walnut Bend Solar Station PV is ranked #35 out of 115 power plants in Arkansas in terms of total annual net electricity generation.
Walnut Bend Solar Station PV generated 57.2 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Walnut Bend Solar Station PV |
|---|---|
| Utility Name | Entergy Arkansas LLC |
| Location | Lee County, AR |
| Initial Operation Date | September 2024 |
| Last Update | May 2026 |
| Annual Generation | 205.5 GWh |
| Annual Consumption | 768.9 k MMBtu |
| Ranked #2,503 out of 13,081 Power Plants Nationwide | |
| Ranked #459 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #35 out of 115 Arkansas Power Plants | |
| Ranked #13 out of 71 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Walnut Bend Solar Station (2023 to 2024) Entergy Arkansas LLC (2025 to 2025) |
Map of Walnut Bend Solar Station PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Bend Solar Station PV.
Monthly Net Generation for Walnut Bend Solar Station PV
Monthly Plant Fuel Consumption for Walnut Bend Solar Station PV
Walnut Bend Solar Station PV Details
| Summary Information | |
|---|---|
| Plant Name | Walnut Bend Solar Station PV (67504) |
| Plant Address | 5400 Lee Road 925, Moro, AR 72368 |
| Utility | Entergy Arkansas LLC (814) |
| Latitude, Longitude | 34.86035, -91.08201 |
| Generation Dates on File | Sep 2024 to May 2026 |
| Initial Operation Date | September 2024 |
| Annual Generation | 205.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator WN1 Details Operating September 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 135.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Walnut Bend Solar Station PV Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #449 | Coniglio Solar | Wolfe City, TX | 211.1 GWh |
| #450 | Sigurd Solar LLC | Sigurd, UT | 210.4 GWh |
| #451 | Yuma Solar + Storage | Fortuna Foothills, AZ | 201.3 GWh |
| #452 | BPL Sol Solar LLC | Chilton, TX | 208.9 GWh |
| #453 | Waverly Solar, LLC | Waverly, VA | 208.4 GWh |
| #454 | Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh |
| #455 | Amite Solar, LLC | Roseland, LA | 207.8 GWh |
| #456 | Crossett Solar | Crossett, AR | 207.0 GWh |
| #457 | Springfield Solar (WI) | Lomira, WI | 206.2 GWh |
| #458 | Edwards Sanborn 1C | Mojave, CA | 205.9 GWh |
| #460 | Holliday Creek Solar | Fort Dodge, IA | 204.8 GWh |
| #461 | Ivanpah 3 | Nipton, CA | 211.3 GWh |
| #462 | Maplewood Solar | Climax, VA | 203.0 GWh |
| #463 | Solverde 1 | Lancaster, CA | 202.9 GWh |
| #464 | Robins Air Force Base Solar | Macon, GA | 200.8 GWh |
| #465 | Appaloosa Solar I | Cedar City, UT | 200.8 GWh |
| #466 | Badger Hollow I | Montfort, WI | 200.7 GWh |
| #467 | Optimist | West Point, MS | 198.2 GWh |
| #468 | Wildflower Solar, LLC (MS) | DeSoto, MS | 199.8 GWh |
| #469 | Wapello Solar LLC | Wapello, IA | 199.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Walnut Bend Solar Station PV.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allen | Memphis, TN | 5.4 TWh | 54.9 mi |
| Cherry Valley PV I | Cherry Valley, AR | 60.9 GWh | 40.9 mi |
| Crossover Wind | Wynne, AR | 401.6 GWh | 32.7 mi |
| Delta Wind Farm (MS) | Dundee, MS | 513.7 GWh | 47.6 mi |
| Farmers Electric Cooperative | Newport, AR | 2.3 GWh | 53.8 mi |
| Flat Fork Solar | Wheatley, AR | 338.9 GWh | 2 mi |
| Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 19.8 mi |
| Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 17.7 mi |
| Happy Solar 1 | Searcy, AR | 214.3 GWh | 39 mi |
| Long Lake Solar, LLC | West Helena, AR | 492.4 GWh | 37.9 mi |
| Quartz Solar, LLC | Wynne, AR | 298.6 GWh | 29.1 mi |
| Searcy Solar Hybrid | Searcy, AR | 178.0 GWh | 43 mi |
| Searcy Water I | Searcy, AR | 834.0 MWh | 45.5 mi |
| Searcy Water II | Searcy, AR | 3.5 GWh | 43.5 mi |
| Stuttgart Solar | Stuttgart, AR | 149.5 GWh | 35.5 mi |
| West Memphis Solar Station | Crawfordsville, AR | 316.2 GWh | 48.2 mi |
| White River Medical Center | Newport, AR | 5.2 GWh | 52.7 mi |
| Wildflower Solar, LLC (MS) | DeSoto, MS | 199.8 GWh | 51.4 mi |
| Woodruff County Solar | Augusta, AR | 176.2 GWh | 31 mi |
| Woodruff Electric Cooperative | Forrest City, AR | 2.1 GWh | 19.1 mi |