2W Permian Solar Project Hybrid
8038 SW 1501, Andrews, TX 79714Plant Summary Information
2W Permian Solar Project Hybrid is ranked #10 out of 6,400 solar farms nationwide in terms of total annual net electricity generation.
2W Permian Solar Project Hybrid generated 305.9 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | 2W Permian Solar Project Hybrid |
|---|---|
| Utility Name | 2W Permian Solar, LLC |
| Location | Andrews County, TX |
| Initial Operation Date | August 2021 |
| Last Update | Sep 2025 |
| Annual Generation | 974.1 GWh |
| Annual Consumption | 3.6 M MMBtu |
| Ranked #750 out of 12,539 Power Plants Nationwide | |
| Ranked #10 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #125 out of 799 Texas Power Plants | |
| Ranked #5 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of 2W Permian Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2W Permian Solar Project Hybrid.
Monthly Net Generation for 2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | 2W Permian Solar Project Hybrid (63255) |
| Plant Address | 8038 SW 1501, Andrews, TX 79714 |
| Utility | 2W Permian Solar, LLC (63012) |
| Latitude, Longitude | 32.11639, -102.52833 |
| Generation Dates on File | Apr 2021 to Sep 2025 |
| Initial Operation Date | August 2021 |
| Annual Generation | 974.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator 2WPBA Details Operating October 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 40 MW |
| Summer Capacity | 40 MW |
| Winter Capacity | 40 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 40 |
|---|---|
| Maximum Charge Rate | 40 MW |
| Maximum Discharge Rate | 40 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 13.1 |
| Storage Enclosure Type | BL |
| Arbitrage | Yes |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 63255 |
| Direct Support Gen Id | 2WPSO |
| Support T D Asset | No |
Generator 2WPSO Details Operating August 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 420 MW |
| Summer Capacity | 420 MW |
| Winter Capacity | 420 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 520 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2W Permian Solar Project Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.2 TWh |
| #2 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #3 | Fox Squirrel Solar | Mt Sterling, OH | 1.1 TWh |
| #4 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #5 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.0 TWh |
| #7 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #8 | Double Back Diamond | Virden, IL | 994.9 GWh |
| #9 | Old 300 Solar Center, LLC | Needville, TX | 984.2 GWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 936.0 GWh |
| #12 | Waco Solar | Mt Calm, TX | 920.5 GWh |
| #13 | Aktina Solar | El Campo, TX | 914.3 GWh |
| #14 | Hornet Solar (TX) | Tulia, TX | 911.5 GWh |
| #15 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 905.2 GWh |
| #16 | Solar Star 1 | Rosamond, CA | 897.7 GWh |
| #17 | Daggett 3 | Daggett, CA | 877.7 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 859.3 GWh |
| #19 | Eleven Mile Solar Center | Coolidge, AZ | 800.0 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 797.6 GWh |
| #21 | Desert Quartzite | Blythe, CA | 755.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2W Permian Solar Project Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bakke | Andrews, TX | 221.0 MWh | 12.4 mi |
| Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 4.7 mi |
| Frankel | Andrews, TX | 165.0 MWh | 23.6 mi |
| Goldsmith | Goldsmith, TX | 184.0 MWh | 11.6 mi |
| Jumbo Hill Wind Project | Andrews, TX | 595.9 GWh | 30.8 mi |
| Lapetus | Andrews, TX | 226.2 GWh | 25.2 mi |
| N. Mary Francis | Odessa, TX | 216.0 MWh | 14.6 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 264.5 GWh | 19.5 mi |
| Oberon IA | Odessa, TX | 306.3 GWh | 30.3 mi |
| Oberon IB | Odessa, TX | 61.4 GWh | 30.9 mi |
| Odessa-Ector Power Plant | Odessa, TX | 7.9 TWh | 22.4 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 10.1 mi |
| Phoebe Solar | Kermit, TX | 554.5 GWh | 27.4 mi |
| Prospero Solar | Andrews, TX | 758.9 GWh | 21.8 mi |
| Prospero Solar II | Andrews, TX | 671.4 GWh | 21.5 mi |
| Quail Run Energy Center | Odessa, TX | 3.1 TWh | 22.7 mi |
| SPS1 Dollarhide | Jal, NM | 23.0 GWh | 35.7 mi |
| Swift Air Solar I | Goldsmith, TX | 228.1 GWh | 25.9 mi |
| Tumbleweed | Andrews, TX | 200.0 MWh | 16.3 mi |
| Westover | Odessa, TX | 185.0 MWh | 19.9 mi |