2W Permian Solar Project Hybrid
8038 SW 1501, Andrews, TX 79714Plant Summary Information
2W Permian Solar Project Hybrid is ranked #3 out of 5,173 solar farms nationwide in terms of total annual net electricity generation.
2W Permian Solar Project Hybrid generated 205.2 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | 2W Permian Solar Project Hybrid |
---|---|
Utility Name | 2W Permian Solar, LLC |
Location | Andrews County, TX |
Initial Operation Date | August 2021 |
Last Update | Feb 2024 |
Annual Generation | 972.4 GWh |
Annual Consumption | 3.3 M MMBtu |
Ranked #787 out of 11,455 Power Plants Nationwide | |
Ranked #3 out of 5,173 Solar Power Plants Nationwide | |
Ranked #125 out of 726 Texas Power Plants | |
Ranked #2 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of 2W Permian Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2W Permian Solar Project Hybrid.
Monthly Net Generation for 2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid Details
Summary Information | |
---|---|
Plant Name | 2W Permian Solar Project Hybrid (63255) |
Plant Address | 8038 SW 1501 Andrews, TX 79714 |
Utility | 2W Permian Solar, LLC (63012) |
Latitude, Longitude | 32.11639, -102.52833 |
Generation Dates on File | Apr 2021 to Feb 2024 |
Initial Operation Date | August 2021 |
Annual Generation | 972.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator 2WPBA Details Operating October 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 40 |
---|---|
Maximum Charge Rate | 40 MW |
Maximum Discharge Rate | 40 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 13.1 |
Storage Enclosure Type | BL |
Arbitrage | Yes |
Frequency Regulation | Yes |
Excess Wind And Solar Generation | Yes |
Generator 2WPSO Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 420 MW |
Summer Capacity | 420 MW |
Winter Capacity | 420 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 520 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
2W Permian Solar Project Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#2 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
#4 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 915.0 GWh |
#5 | Solar Star 1 | Rosamond, CA | 897.1 GWh |
#6 | Juno Solar Project | Lamesa, TX | 873.7 GWh |
#7 | Solana Generating Station | Gila Bend, AZ | 819.7 GWh |
#8 | Prospero Solar | Andrews, TX | 777.8 GWh |
#9 | Agua Caliente Solar Project | Dateland, AZ | 739.5 GWh |
#10 | Athos Solar Project | Desert Center, CA | 731.5 GWh |
#11 | Prospero Solar II | Andrews, TX | 721.2 GWh |
#12 | Desert Sunlight 300, LLC | Desert Center, CA | 714.7 GWh |
#13 | Copper Mountain Solar 5, LLC | Boulder City, NV | 707.9 GWh |
#14 | Titan Solar Project | Van Horn, TX | 700.7 GWh |
#15 | McCoy Solar Energy Project Hybrid | Blythe, CA | 669.5 GWh |
#16 | Solar Star 2 | Rosamond, CA | 697.9 GWh |
#17 | Silver State Solar Power South | Primm Valley, NV | 682.3 GWh |
#18 | Mount Signal Solar Farm V | Calexico, CA | 671.5 GWh |
#19 | Arrow Canyon Solar Hybrid | Moapa, NV | 663.1 GWh |
#20 | Stateline Solar | Nipton, CA | 649.1 GWh |
#21 | Copper Mountain Solar 3 | Boulder City, NV | 636.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2W Permian Solar Project Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bakke | Andrews, TX | 491.0 MWh | 12.4 mi |
Ector County Energy Center | Goldsmith, TX | 120.8 GWh | 4.7 mi |
Frankel | Andrews, TX | 287.1 MWh | 23.6 mi |
Goldsmith | Goldsmith, TX | 424.3 MWh | 11.6 mi |
Jumbo Hill Wind Project | Andrews, TX | 635.0 GWh | 30.8 mi |
Lapetus | Andrews, TX | 203.0 GWh | 25.2 mi |
N. Mary Francis | Odessa, TX | 495.0 MWh | 14.6 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 273.1 GWh | 19.5 mi |
Oberon IA | Odessa, TX | 345.4 GWh | 30.3 mi |
Oberon IB | Odessa, TX | 68.8 GWh | 30.9 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.6 TWh | 22.4 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 45.5 GWh | 10.1 mi |
Phoebe Solar | Kermit, TX | 559.5 GWh | 27.4 mi |
Prospero Solar | Andrews, TX | 777.8 GWh | 21.8 mi |
Prospero Solar II | Andrews, TX | 721.2 GWh | 21.5 mi |
Quail Run Energy Center | Odessa, TX | 1.4 TWh | 22.7 mi |
SPS1 Dollarhide | Jal, NM | 23.6 GWh | 35.7 mi |
SPS2 Jal | Jal, NM | 23.6 GWh | 38.6 mi |
Tumbleweed | Andrews, TX | 511.0 MWh | 16.3 mi |
Westover | Odessa, TX | 367.0 MWh | 19.9 mi |