2W Permian Solar Project Hybrid
8038 SW 1501, Andrews, TX 79714Plant Summary Information
2W Permian Solar Project Hybrid is ranked #9 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
2W Permian Solar Project Hybrid generated 192.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | 2W Permian Solar Project Hybrid |
|---|---|
| Utility Name | 2W Permian Solar, LLC |
| Location | Andrews County, TX |
| Initial Operation Date | August 2021 |
| Last Update | Feb 2026 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 3.7 M MMBtu |
| Ranked #743 out of 12,637 Power Plants Nationwide | |
| Ranked #9 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #122 out of 820 Texas Power Plants | |
| Ranked #5 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of 2W Permian Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2W Permian Solar Project Hybrid.
Monthly Net Generation for 2W Permian Solar Project Hybrid
Monthly Plant Fuel Consumption for 2W Permian Solar Project Hybrid
2W Permian Solar Project Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | 2W Permian Solar Project Hybrid (63255) |
| Plant Address | 8038 SW 1501, Andrews, TX 79714 |
| Utility | 2W Permian Solar, LLC (63012) |
| Latitude, Longitude | 32.11639, -102.52833 |
| Generation Dates on File | Apr 2021 to Feb 2026 |
| Initial Operation Date | August 2021 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator 2WPBA Details Operating October 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 40 MW |
| Summer Capacity | 40 MW |
| Winter Capacity | 40 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 40 |
|---|---|
| Maximum Charge Rate | 40 MW |
| Maximum Discharge Rate | 40 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 13.1 |
| Storage Enclosure Type | BL |
| Arbitrage | Yes |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 63255 |
| Direct Support Gen Id | 2WPSO |
| Support T D Asset | No |
Generator 2WPSO Details Operating August 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 420 MW |
| Summer Capacity | 420 MW |
| Winter Capacity | 420 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 520 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2W Permian Solar Project Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh |
| #2 | Hornet Solar (TX) | Tulia, TX | 1.4 TWh |
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #7 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #8 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #10 | Aktina Solar | El Campo, TX | 1.0 TWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 943.5 GWh |
| #12 | Old 300 Solar Center, LLC | Needville, TX | 939.4 GWh |
| #13 | Waco Solar | Mt Calm, TX | 915.1 GWh |
| #14 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 893.1 GWh |
| #15 | Solar Star 1 | Rosamond, CA | 888.2 GWh |
| #16 | Double Back Diamond | Virden, IL | 887.5 GWh |
| #17 | Daggett 3 | Daggett, CA | 859.8 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 853.4 GWh |
| #19 | Desert Quartzite | Blythe, CA | 830.4 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 846.1 GWh |
| #21 | Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2W Permian Solar Project Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bakke | Andrews, TX | 221.0 MWh | 12.4 mi |
| Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 4.7 mi |
| Frankel | Andrews, TX | 165.0 MWh | 23.6 mi |
| Goldsmith | Goldsmith, TX | 184.0 MWh | 11.6 mi |
| Jumbo Hill Wind Project | Andrews, TX | 598.9 GWh | 30.8 mi |
| Lapetus | Andrews, TX | 219.3 GWh | 25.2 mi |
| N. Mary Francis | Odessa, TX | 216.0 MWh | 14.6 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 236.5 GWh | 19.5 mi |
| Oberon IA | Odessa, TX | 288.4 GWh | 30.3 mi |
| Odessa-Ector Power Plant | Odessa, TX | 8.3 TWh | 22.4 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 10.1 mi |
| Phoebe Solar | Kermit, TX | 537.3 GWh | 27.4 mi |
| Prospero Solar | Andrews, TX | 739.4 GWh | 21.8 mi |
| Prospero Solar II | Andrews, TX | 659.8 GWh | 21.5 mi |
| Quail Run Energy Center | Odessa, TX | 3.1 TWh | 22.7 mi |
| Swift Air Solar I | Goldsmith, TX | 364.7 GWh | 25.9 mi |
| Swift Air Solar II | Odessa, TX | 81.5 GWh | 27.2 mi |
| Swift Air Solar III | Odessa, TX | 54.6 GWh | 27.2 mi |
| Tumbleweed | Andrews, TX | 200.0 MWh | 16.3 mi |
| Westover | Odessa, TX | 185.0 MWh | 19.9 mi |