Escalante Solar II, LLC
5900 North 350 West, Milford, UT 84751Plant Summary Information
Escalante Solar II, LLC is ranked #22 out of 123 power plants in Utah in terms of total annual net electricity generation.
Escalante Solar II, LLC generated 37.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Escalante Solar II, LLC |
|---|---|
| Utility Name | Clearway Renewable Operation & Maintenance LLC |
| Location | Beaver County, UT |
| Initial Operation Date | August 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 211.6 GWh |
| Annual Consumption | 756.0 k MMBtu |
| Ranked #2,411 out of 12,613 Power Plants Nationwide | |
| Ranked #398 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #22 out of 123 Utah Power Plants | |
| Ranked #9 out of 55 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
First Wind O&M, LLC (2013 to 2014) Dominion Renewable Energy (2015 to 2020) Clearway Renewable Operation & Maintenance LLC (2021 to 2024) |
Map of Escalante Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Escalante Solar II, LLC.
Monthly Net Generation for Escalante Solar II, LLC
Monthly Plant Fuel Consumption for Escalante Solar II, LLC
Escalante Solar II, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Escalante Solar II, LLC (59388) |
| Plant Address | 5900 North 350 West, Milford, UT 84751 |
| Utility | Clearway Renewable Operation & Maintenance LLC (64629) |
| Latitude, Longitude | 38.50083, -113.03 |
| Generation Dates on File | Jun 2016 to Dec 2025 |
| Initial Operation Date | August 2016 |
| Annual Generation | 211.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF14-793 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator ESCS2 Details Operating August 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 105.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Escalante Solar II, LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #388 | Calhoun County Solar Project | Sheridan Township, MI | 217.4 GWh |
| #389 | Chicot Solar | Lake Village, AR | 214.9 GWh |
| #390 | Happy Solar 1 | Searcy, AR | 214.6 GWh |
| #391 | Black Bear Solar 1 | Montgomery, AL | 214.3 GWh |
| #392 | Speedway Solar, LLC | Morrison Town, IN | 214.1 GWh |
| #393 | Iron Springs Solar, LLC | Cedar City, UT | 213.6 GWh |
| #394 | Fern Solar LLC | Battleboro, NC | 213.2 GWh |
| #395 | Delilah Solar Energy II LLC | Bogota, TX | 212.8 GWh |
| #396 | Elektron Solar, LLC | Grantsville, UT | 212.1 GWh |
| #397 | BPL Crown Solar LLC | Chilton, TX | 211.8 GWh |
| #399 | Escalante Solar I, LLC | Milford, UT | 211.5 GWh |
| #400 | Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh |
| #401 | Northern Orchard Solar PV, LLC | Taft, CA | 208.3 GWh |
| #402 | Martin County Solar Project, LLC | Pilgrim, KY | 210.9 GWh |
| #403 | Rocket Solar, LLC | Corinne, UT | 210.5 GWh |
| #404 | Walnut Bend Solar Station PV | Moro, AR | 210.0 GWh |
| #405 | Sauk Solar Park | Union City, MI | 209.4 GWh |
| #406 | Holliday Creek Solar | Fort Dodge, IA | 209.1 GWh |
| #407 | Crossett Solar | Crossett, AR | 208.7 GWh |
| #408 | Escalante Solar III, LLC | Milford, UT | 208.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Escalante Solar II, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Mountain Biogas | Milford, UT | 12.0 MWh | 26.8 mi |
| Blundell | Milford, UT | 272.5 GWh | 9.6 mi |
| Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 36.7 mi |
| Cove Fort | Cove Fort, UT | 120.8 GWh | 24.6 mi |
| Escalante Solar I, LLC | Milford, UT | 211.5 GWh | 1.6 mi |
| Escalante Solar III, LLC | Milford, UT | 208.6 GWh | 2.3 mi |
| Granite Peak Solar Plant | Milford, UT | 6.2 GWh | 7.1 mi |
| Greenville Solar Plant | Milford, UT | 4.4 GWh | 23.2 mi |
| Laho Solar Plant | Milford, UT | 6.2 GWh | 14.5 mi |
| Milford 2 | Milford, UT | 7.0 GWh | 8.1 mi |
| Milford Flat Solar Plant | Milford, UT | 6.2 GWh | 14.5 mi |
| Milford Solar 1 | Milford, UT | 260.7 GWh | 0.9 mi |
| Milford Wind Corridor I LLC | Milford, UT | 401.4 GWh | 5.7 mi |
| Milford Wind Corridor Stage II LLC | Milford, UT | 198.5 GWh | 7.9 mi |
| Smithfield 1 | Milford, UT | 8.5 GWh | 8 mi |
| Smithfield 3 | Milford, UT | 5.5 GWh | 19.5 mi |
| South Milford Solar Plant | Milford, UT | 7.4 GWh | 13.2 mi |
| Thermo No 1 | Milford, UT | 57.7 GWh | 25.1 mi |
| Upper Beaver | Beaver, UT | 10.1 GWh | 33.8 mi |
| Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh | 43.2 mi |