Majestic 1 Wind Farm
580 FM 1342, Panhandle, TX 79068Plant Summary Information
Majestic 1 Wind Farm is ranked #162 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Majestic 1 Wind Farm generated 89.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Majestic 1 Wind Farm |
|---|---|
| Utility Name | NextEra Energy Majestic Wind |
| Location | Carson County, TX |
| Initial Operation Date | January 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 349.7 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,827 out of 13,081 Power Plants Nationwide | |
| Ranked #542 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #375 out of 852 Texas Power Plants | |
| Ranked #162 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Majestic 1 Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Majestic 1 Wind Farm.
Monthly Net Generation for Majestic 1 Wind Farm
Monthly Plant Fuel Consumption for Majestic 1 Wind Farm
Majestic 1 Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Majestic 1 Wind Farm (56648) |
| Plant Address | 580 FM 1342, Panhandle, TX 79068 |
| Utility | NextEra Energy Majestic Wind (58353) |
| Latitude, Longitude | 35.3919, -101.53 |
| Generation Dates on File | Dec 2008 to Dec 2025 |
| Initial Operation Date | January 2009 |
| Annual Generation | 349.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southwestern Public Service Co (17718) TX |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 1 Details Operating January 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 79.5 MW |
| Summer Capacity | 79.5 MW |
| Winter Capacity | 79.5 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 53 |
| Turbine Details | |
| Number Of Turbines | 53 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Majestic 1 Wind Farm Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Shaw Creek Solar | 700 Universe Blvd, Juno Beach, FL 33408 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #532 | Wolf Ridge Wind | Muenster, TX | 355.0 GWh |
| #533 | Prairie Winds ND1 | Minot, ND | 353.8 GWh |
| #534 | Hopkins Ridge Wind | Dayton, WA | 352.9 GWh |
| #535 | Sweetwater Wind 2 LLC | Sweetwater, TX | 351.7 GWh |
| #536 | Lorenzo Wind | Lorenzo, TX | 351.1 GWh |
| #537 | Midland Wind | Kewane, IL | 350.9 GWh |
| #538 | Cameron Wind 1 LLC | Rio Hondo, TX | 348.2 GWh |
| #539 | Buffalo Gap 2 Wind Farm | Merkel, TX | 350.4 GWh |
| #540 | Lindahl Wind Project, LLC | Tioga, ND | 350.1 GWh |
| #541 | Trimont Area Wind Farm | Trimont, MN | 349.7 GWh |
| #543 | Palmas Wind, LLC | Rio Hondo, TX | 349.6 GWh |
| #544 | Rugby Wind Power Project | Barton, ND | 348.1 GWh |
| #545 | Spinning Spur Wind LLC | Vegas, TX | 347.0 GWh |
| #546 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 346.2 GWh |
| #547 | Duran Mesa LLC | Duran, NM | 345.3 GWh |
| #548 | Voyager Wind I | Mojave, CA | 343.4 GWh |
| #549 | Northern Wind | Lake Wilson, MN | 343.3 GWh |
| #550 | Tyler Bluff Wind Project, LLC | Muenster, TX | 343.1 GWh |
| #551 | Campbell County Wind Farm | Pollock, SD | 342.9 GWh |
| #552 | Benton County Wind Farm | Earl Park, IN | 342.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Majestic 1 Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Black Hawk Station | Borger, TX | 1.4 TWh | 23.1 mi |
| Colbeck's Corner, LLC | Groom, TX | 840.4 GWh | 21.6 mi |
| Engineered Carbons Borger Cogen | Borger, TX | 31.6 GWh | 19.8 mi |
| Golden Spread Panhandle Wnd Rch | Wilderado, TX | 196.8 GWh | 39.7 mi |
| Goodnight | Claude, TX | 752.6 GWh | 23.6 mi |
| Grandview Wind Farm, LLC | Panhandle, TX | 687.3 GWh | 16.3 mi |
| Harrington | Amarillo, TX | 2.2 TWh | 13.8 mi |
| Llano Estacado Wind Ranch | White Deer, TX | 77.0 GWh | 16.4 mi |
| Majestic II Wind | Panhandle, TX | 175.7 GWh | 2.8 mi |
| Nichols | Amarillo, TX | 1.7 TWh | 14.3 mi |
| Pantex | Amarillo, TX | 34.3 GWh | 4.8 mi |
| Pattern Panhandle Wind 2 LLC | Panhandle, TX | 577.3 GWh | 9.5 mi |
| Pattern Panhandle Wind LLC | Panhandle, TX | 604.2 GWh | 15.8 mi |
| Ribeye Wind (11) LLC | Dumas, TX | 5.9 GWh | 38.4 mi |
| Route 66 Wind Plant | Panhandle, TX | 552.5 GWh | 14 mi |
| Salt Fork Wind Project, LLC | Clarendon, TX | 676.0 GWh | 36.6 mi |
| Spinning Spur Wind LLC | Vegas, TX | 347.0 GWh | 39.4 mi |
| T-Bone Wind (10) LLC | Dumas, TX | 5.3 GWh | 39 mi |
| Tri-Tip Wind (9) LLC | Sunray, TX | 6.3 GWh | 42.2 mi |
| UL Advanced Wind Turbine Test Facility | Canyon, TX | 12.0 GWh | 32.7 mi |