Lorenzo Wind
608 County Road 125, Lorenzo, TX 79343Plant Summary Information
Lorenzo Wind is ranked #157 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Lorenzo Wind generated 93.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Lorenzo Wind |
|---|---|
| Utility Name | Lorenzo Wind, LLC |
| Location | Crosby County, TX |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 337.7 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,832 out of 12,613 Power Plants Nationwide | |
| Ranked #546 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #357 out of 816 Texas Power Plants | |
| Ranked #157 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Tri Global Energy, LLC (2013 to 2016) Lorenzo Wind, LLC (2017 to 2024) |
Map of Lorenzo Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lorenzo Wind.
Monthly Net Generation for Lorenzo Wind
Monthly Plant Fuel Consumption for Lorenzo Wind
Lorenzo Wind Details
| Summary Information | |
|---|---|
| Plant Name | Lorenzo Wind (59244) |
| Plant Address | 608 County Road 125, Lorenzo, TX 79343 |
| Utility | Lorenzo Wind, LLC (61133) |
| Latitude, Longitude | 33.69917, -101.52472 |
| Generation Dates on File | Sep 2018 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 337.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-480-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southwestern Public Service Co (17718) TX |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator FIBE1 Details Operating December 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 29 |
| Turbine Details | |
| Number Of Turbines | 29 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.3-116 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 200 |
Lorenzo Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #536 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #537 | Gratiot Farms Wind Project | Carson City, MI | 344.5 GWh |
| #538 | Drift Sand Wind Project LLC | Rush Springs, OK | 344.1 GWh |
| #539 | Hart Wind | Hart, TX | 344.0 GWh |
| #540 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #541 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
| #542 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #543 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #544 | Baron Winds Farm | Cohocton, NY | 339.6 GWh |
| #545 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #547 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
| #548 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
| #549 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 335.4 GWh |
| #550 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
| #551 | Spinning Spur Wind LLC | Vegas, TX | 334.2 GWh |
| #552 | Steele Flats Wind Project LLC | Diller, NE | 332.6 GWh |
| #553 | Tyler Bluff Wind Project, LLC | Muenster, TX | 332.1 GWh |
| #554 | NedPower Mount Storm | Mount Storm, WV | 331.6 GWh |
| #555 | Bluestone Wind, LLC | Sanford, NY | 331.4 GWh |
| #556 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 331.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lorenzo Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Station | Abernathy, TX | 267.1 GWh | 21.6 mi |
| BESSP1, LLC. | Shallowater, TX | 9.5 GWh | 25.6 mi |
| Brandon Station | Lubbock, TX | 21.7 GWh | 22.2 mi |
| Cotton Plains Wind Farm | Floydada, TX | 181.9 GWh | 31.6 mi |
| Elk Station | Abernathy, TX | 1.3 TWh | 21.6 mi |
| GE-Lubbock | Lubbock, TX | 1.9 GWh | 31.5 mi |
| Hale Community Wind Farm | Plainview, TX | 1.9 TWh | 20.1 mi |
| Jones | Lubbock, TX | 2.9 TWh | 17.3 mi |
| McAdoo Wind Energy LLC | McAdoo, TX | 363.6 GWh | 32.2 mi |
| Old Settler Wind | Floydada, TX | 544.4 GWh | 31.6 mi |
| Pleasant Hill Wind Energy Project | Lorenzo, TX | 39.9 GWh | 3.6 mi |
| Ralls Wind Farm | Ralls, TX | 10.6 GWh | 8.2 mi |
| Roaring Springs, LLC | Motley, TX | 91.7 GWh | 38.5 mi |
| Sage Draw Wind | Wilson, TX | 1.2 TWh | 28.4 mi |
| South Plains II | Lockney, TX | 1.0 TWh | 35.4 mi |
| South Plains Wind Phase I | Floydada, TX | 677.0 GWh | 28.8 mi |
| Tahoka Wind | Tahoka, TX | 1.2 TWh | 38.9 mi |
| Ty Cooke | Lubbock, TX | 3.7 GWh | 19.6 mi |
| Wake Wind Energy Center | Floydada, TX | 883.8 GWh | 25.9 mi |
| Whirlwind Energy Center | Floydada, TX | 101.5 GWh | 37.2 mi |