Limon Wind I
22085 County Road 3P, Limon, CO 80828Plant Summary Information
Limon Wind I is ranked #31 out of 286 power plants in Colorado in terms of total annual net electricity generation.
Limon Wind I generated 161.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Limon Wind I |
|---|---|
| Utility Name | Limon |
| Location | Lincoln County, CO |
| Initial Operation Date | November 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 570.4 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,208 out of 12,613 Power Plants Nationwide | |
| Ranked #305 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #31 out of 286 Colorado Power Plants | |
| Ranked #16 out of 34 Colorado Wind Power Plants | |
| Fuel Types | Wind |
Map of Limon Wind I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Limon Wind I.
Monthly Net Generation for Limon Wind I
Monthly Plant Fuel Consumption for Limon Wind I
Limon Wind I Details
| Summary Information | |
|---|---|
| Plant Name | Limon Wind I (58126) |
| Plant Address | 22085 County Road 3P, Limon, CO 80828 |
| Utility | Limon (57503) |
| Latitude, Longitude | 39.38098, -103.57324 |
| Generation Dates on File | Oct 2012 to Dec 2025 |
| Initial Operation Date | November 2012 |
| Annual Generation | 570.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of Colorado (PSCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating November 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Minimum Load | 7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 125 |
| Turbine Details | |
| Number Of Turbines | 125 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.6 SLE |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Limon Wind I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #295 | Rattlesnake Power, LLC | Brady, TX | 581.0 GWh |
| #296 | Echo Wind Park | Elkton, MI | 574.6 GWh |
| #297 | Moraine Sands Wind Power | Mason City, IL | 574.2 GWh |
| #298 | King Mountain Wind Ranch 1 | McCamey, TX | 573.5 GWh |
| #299 | Langford Wind Power | Christoval, TX | 572.9 GWh |
| #300 | Panorama Wind, LLC | Grover, CO | 572.2 GWh |
| #301 | Century | Blairsburg, IA | 572.0 GWh |
| #302 | Grant Wind, LLC | Medford, OK | 571.6 GWh |
| #303 | English Farms | Montezuma, IA | 571.0 GWh |
| #304 | Sherbino II | Ft. Stockton, TX | 570.6 GWh |
| #306 | Boiling Springs Wind Farm | Woodward, OK | 567.7 GWh |
| #307 | Sundance Wind Project, LLC | Alva, OK | 566.2 GWh |
| #308 | South Hurlburt Wind LLC | Arlington, OR | 564.4 GWh |
| #309 | Caney River Wind Project | Howard, KS | 564.3 GWh |
| #310 | Blue Cloud Wind Energy LLC | Sudan, TX | 564.0 GWh |
| #311 | White Creek Wind Farm | Roosevelt, WA | 563.7 GWh |
| #312 | Carroll Wind Farm | Carroll, IA | 562.6 GWh |
| #313 | Buckeye Wind Energy Center | Hays, KS | 561.2 GWh |
| #314 | Desert Wind Farm, LLC | Hertford, NC | 560.7 GWh |
| #315 | King Creek Wind Farm 1, LLC | Throckmorton, TX | 560.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Limon Wind I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bronco Plains Wind II, LLC | Kit Carson, CO | 668.6 GWh | 35 mi |
| Bronco Plains Wind, LLC | Flagler, CO | 1.1 TWh | 35.6 mi |
| Cedar Point Wind | Limon, CO | 692.6 GWh | 6.3 mi |
| Crossing Trails Wind Power Project LLC. | Seibert, CO | 394.2 GWh | 46.4 mi |
| Golden West Power Partners LLC | Calhan, CO | 798.2 GWh | 46.1 mi |
| Grazing Yak Solar | Calhan, CO | 77.3 GWh | 45.8 mi |
| Hunter Solar, LLC (CO) | Bennett, CO | 198.1 GWh | 50.5 mi |
| Limon Generating Station | Limon, CO | 216.3 GWh | 14 mi |
| Limon III Wind LLC | Limon, CO | 649.7 GWh | 5.6 mi |
| Limon Wind II | Limon, CO | 485.4 GWh | 2.8 mi |
| Oak Leaf - CSG Portfolio (OL 36) | Watkins, CO | 3.2 GWh | 54.4 mi |
| Oak Leaf - CSG Portfolio (OL 39) | Watkins, CO | 3.5 GWh | 54.3 mi |
| Oak Leaf Solar XXI (CSG) | Watkins, CO | 3.4 GWh | 57.7 mi |
| Oak Leaf Solar XXIV LLC (CSG) | Watkins, CO | 2.0 GWh | 55.5 mi |
| Oak Leaf Solar XXV LLC (CSG) | Watkins, CO | 3.6 GWh | 53.9 mi |
| Pioneer Solar (CO), LLC | Bennett, CO | 179.8 GWh | 54 mi |
| Quincy Solar (CO) | Watkins, CO | 3.4 GWh | 55.7 mi |
| Rush Creek Wind | Matheson, CO | 2.1 TWh | 20.5 mi |
| Titan Solar | Deer Trail, CO | 97.4 GWh | 31.6 mi |
| Victory Solar LLC | Bennett, CO | 29.2 GWh | 54 mi |