Cedar Creek Wind, LLC
Sand Creek Road, Shelley, ID 83274Plant Summary Information
Cedar Creek Wind, LLC is ranked #10 out of 140 power plants in Idaho in terms of total annual net electricity generation.
Cedar Creek Wind, LLC generated 123.1 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Cedar Creek Wind, LLC |
---|---|
Utility Name | Cedar Creek Wind, LLC |
Location | Bingham County, ID |
Initial Operation Date | March 2024 |
Last Update | Mar 2025 |
Annual Generation | 470.9 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,357 out of 12,288 Power Plants Nationwide | |
Ranked #382 out of 1,353 Wind Power Plants Nationwide | |
Ranked #10 out of 140 Idaho Power Plants | |
Ranked #1 out of 33 Idaho Wind Power Plants | |
Fuel Types | Wind |
Map of Cedar Creek Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Creek Wind, LLC.
Monthly Net Generation for Cedar Creek Wind, LLC
Cedar Creek Wind, LLC Details
Summary Information | |
---|---|
Plant Name | Cedar Creek Wind, LLC (65311) |
Plant Address | Sand Creek Road, Shelley, ID 83274 |
Utility | Cedar Creek Wind, LLC (64624) |
Latitude, Longitude | 43.32761, -112.05772 |
Generation Dates on File | Mar 2024 to Mar 2025 |
Initial Operation Date | March 2024 |
Annual Generation | 470.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) ID |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator CDCRK Details Operating March 2024
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 160 MW |
Summer Capacity | 160 MW |
Winter Capacity | 160 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 47 |
Turbine Details | |
Number Of Turbines | 47 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 3.4-140 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 98 |
Cedar Creek Wind, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#372 | Bingham Wind | Bingham, ME | 485.4 GWh |
#373 | Heartland Farms | Middleton, MI | 484.6 GWh |
#374 | Big Horn Wind Project | Bickelton, WA | 483.8 GWh |
#375 | Langdon Renewables, LLC | Langdon, ND | 482.4 GWh |
#376 | NedPower Mount Storm | Mount Storm, WV | 481.5 GWh |
#377 | Dakota Range Wind | Marvin, SD | 480.4 GWh |
#378 | Rock Falls Wind Farm LLC | Braman, OK | 479.7 GWh |
#379 | Adams Wind | Lenox, IA | 474.5 GWh |
#380 | Mesquite Creek Wind | Lamesa, TX | 473.2 GWh |
#381 | Buffalo Ridge Wind | Lake Benton, MN | 472.7 GWh |
#383 | Los Vientos Windpower III | Rio Grande City, TX | 470.5 GWh |
#384 | Otter Creek Wind Farm LLC | Ransom, IL | 470.4 GWh |
#385 | Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh |
#386 | Wellsburg Wind Project | Wellsburg, IA | 468.7 GWh |
#387 | Rocksprings | Del Rio, TX | 464.9 GWh |
#388 | Ensign Wind LLC | Montezuma, KS | 464.2 GWh |
#389 | Shannon Wind | Windhorst, TX | 463.5 GWh |
#390 | Laurel Wind Farm | Laurel, IA | 463.1 GWh |
#391 | Bishop Hill III | Cambridge, IL | 462.7 GWh |
#392 | Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Creek Wind, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
American Falls Solar | American Falls, ID | 44.2 GWh | 49.4 mi |
American Falls Solar II | American Falls, ID | 43.9 GWh | 49.4 mi |
Bannock County LFG to Energy | Pocatello, ID | 12.8 GWh | 40.4 mi |
BYUI Central Energy Facility | Rexburg, ID | 39.9 GWh | 36.4 mi |
Chester Diversion Hydroelectric Project | Chester, ID | 7.7 GWh | 53.3 mi |
City Power Plant | Idaho Falls, ID | 40.4 GWh | 11.3 mi |
Gem State | Idaho Falls, ID | 108.5 GWh | 6.8 mi |
Goshen Phase II | Idaho Falls, ID | 369.2 GWh | 14.7 mi |
Horse Butte Wind I, LLC | Iona, ID | 167.4 GWh | 17.1 mi |
Kettle Butte Digester, LLC | Roberts, ID | 9.2 GWh | 23.8 mi |
Last Chance | Grace, ID | 4.5 GWh | 53.1 mi |
Lower No 1 | Idaho Falls, ID | 38.9 GWh | 9.7 mi |
Lower No 2 | Idaho Falls, ID | 5.4 GWh | 9.7 mi |
Marsh Valley Development | McCammon, ID | 6.9 GWh | 48.7 mi |
Meadow Creek Project Company | Idaho Falls, ID | 325.0 GWh | 18.6 mi |
Palisades Dam | Palisades, ID | 744.4 GWh | 42.8 mi |
Simplot Leasing Don Plant | Pocatello, ID | 71.5 GWh | 37.5 mi |
Soda | Soda Springs, ID | 19.1 GWh | 50.6 mi |
Upper Power Plant | Idaho Falls, ID | 44.9 GWh | 15.6 mi |
Wolverine Creek | Idaho Falls, ID | 163.5 GWh | 13.1 mi |