Cedar Creek Wind, LLC
Sand Creek Road, Shelley, ID 83274Plant Summary Information
Cedar Creek Wind, LLC is ranked #10 out of 142 power plants in Idaho in terms of total annual net electricity generation.
Cedar Creek Wind, LLC generated 101.6 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Cedar Creek Wind, LLC |
|---|---|
| Utility Name | Cedar Creek Wind, LLC |
| Location | Bingham County, ID |
| Initial Operation Date | March 2024 |
| Last Update | Aug 2026 |
| Annual Generation | 519.4 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,346 out of 13,301 Power Plants Nationwide | |
| Ranked #376 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #10 out of 142 Idaho Power Plants | |
| Ranked #1 out of 33 Idaho Wind Power Plants | |
| Fuel Types | Wind |
Map of Cedar Creek Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Creek Wind, LLC.
Monthly Net Generation for Cedar Creek Wind, LLC
Monthly Plant Fuel Consumption for Cedar Creek Wind, LLC
Cedar Creek Wind, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Creek Wind, LLC (65311) |
| Plant Address | Sand Creek Road, Shelley, ID 83274 |
| Utility | Cedar Creek Wind, LLC (64624) |
| Latitude, Longitude | 43.32761, -112.05772 |
| Generation Dates on File | Mar 2024 to Aug 2026 |
| Initial Operation Date | March 2024 |
| Annual Generation | 519.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) ID |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator CDCRK Details Operating March 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 160 MW |
| Summer Capacity | 160 MW |
| Winter Capacity | 160 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 47 |
| Turbine Details | |
| Number Of Turbines | 47 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 3.4-140 |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 98 |
Cedar Creek Wind, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #366 | Canadian Hills Wind | El Rino, OK | 529.4 GWh |
| #367 | Ranchland Wind Project II | Cisco, TX | 528.5 GWh |
| #368 | Frontier Windpower | Newkirk, OK | 527.2 GWh |
| #369 | Trent Wind Farm | Trent, TX | 525.7 GWh |
| #370 | Cardinal Point Wind | Sciota, IL | 524.9 GWh |
| #371 | Lane City Wind | Lane City, TX | 524.7 GWh |
| #372 | South Fork Wind | East Hampton, NY | 521.6 GWh |
| #373 | Babbitt Ranch Energy Center | Flagstaff, AZ | 520.4 GWh |
| #374 | Limon Wind I | Limon, CO | 520.0 GWh |
| #375 | Balko Wind LLC | Balko, OK | 519.5 GWh |
| #377 | Manzana Wind LLC | Rosamond, CA | 519.3 GWh |
| #378 | Top Hat Wind | Beason, IL | 517.8 GWh |
| #379 | Big Horn Wind Project | Bickelton, WA | 516.5 GWh |
| #380 | Prairie Switch Wind LLC | El Campo, TX | 515.8 GWh |
| #381 | Tatanka Ridge | Toronto, SD | 513.3 GWh |
| #382 | Border Winds Wind Farm | Rolla, ND | 513.1 GWh |
| #383 | Bruennings Breeze Wind Farm | Raymondville, TX | 511.0 GWh |
| #384 | Twin Ridges Wind Farm | Meyersdale, PA | 510.6 GWh |
| #385 | Buffalo Ridge II LLC | Elkton, SD | 510.0 GWh |
| #386 | Flat Ridge 3 | Zenda, KS | 506.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Creek Wind, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| American Falls Solar | American Falls, ID | 43.3 GWh | 48.9 mi |
| American Falls Solar II | American Falls, ID | 44.7 GWh | 49.2 mi |
| Bannock County LFG to Energy | Pocatello, ID | 12.5 GWh | 40.4 mi |
| BYUI Central Energy Facility | Rexburg, ID | 39.2 GWh | 36.4 mi |
| Chester Diversion Hydroelectric Project | Chester, ID | 6.7 GWh | 53.3 mi |
| City Power Plant | Idaho Falls, ID | 39.6 GWh | 11.3 mi |
| Gem State | Idaho Falls, ID | 117.2 GWh | 6.8 mi |
| Goshen Phase II | Idaho Falls, ID | 337.1 GWh | 14.7 mi |
| Horse Butte Wind I, LLC | Iona, ID | 158.0 GWh | 17.1 mi |
| Kettle Butte Digester, LLC | Roberts, ID | 6.8 GWh | 23.8 mi |
| Last Chance | Grace, ID | 3.5 GWh | 53.1 mi |
| Lower No 1 | Idaho Falls, ID | 41.6 GWh | 9.7 mi |
| Lower No 2 | Idaho Falls, ID | 3.8 GWh | 9.7 mi |
| Marsh Valley Development | McCammon, ID | 3.5 GWh | 48.7 mi |
| Meadow Creek Project Company | Idaho Falls, ID | 292.3 GWh | 18.6 mi |
| Palisades Dam | Palisades, ID | 657.3 GWh | 42.8 mi |
| Simplot Leasing Don Plant | Pocatello, ID | 77.7 GWh | 37.5 mi |
| Soda | Soda Springs, ID | 16.3 GWh | 50.6 mi |
| Upper Power Plant | Idaho Falls, ID | 44.8 GWh | 15.6 mi |
| Wolverine Creek | Idaho Falls, ID | 143.7 GWh | 13.1 mi |