Blue Bird Solar, LLC
E State Hwy 47, Warrenton, MO 63383Plant Summary Information
Blue Bird Solar, LLC is ranked #2 out of 29 solar farms in Missouri in terms of total annual net electricity generation.
Blue Bird Solar, LLC generated 34.9 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Blue Bird Solar, LLC |
---|---|
Utility Name | Blue Bird Solar, LLC |
Location | Warren County, MO |
Initial Operation Date | December 2024 |
Last Update | Mar 2025 |
Annual Generation | 35.3 GWh |
Annual Consumption | 120.4 k MMBtu |
Ranked #4,434 out of 12,288 Power Plants Nationwide | |
Ranked #1,074 out of 6,174 Solar Power Plants Nationwide | |
Ranked #51 out of 119 Missouri Power Plants | |
Ranked #2 out of 29 Missouri Solar Power Plants | |
Fuel Types | Solar |
Map of Blue Bird Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Bird Solar, LLC.
Monthly Net Generation for Blue Bird Solar, LLC
Blue Bird Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Blue Bird Solar, LLC (66747) |
Plant Address | E State Hwy 47, Warrenton, MO 63383 |
Utility | Blue Bird Solar, LLC (65742) |
Latitude, Longitude | 38.89541, -91.13656 |
Generation Dates on File | Dec 2024 to Mar 2025 |
Initial Operation Date | December 2024 |
Annual Generation | 35.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator BBS Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 139 MW |
Summer Capacity | 139 MW |
Winter Capacity | 139 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 188 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blue Bird Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1064 | Ben Moreell Solar Farm | Tinton Falls, NJ | 36.2 GWh |
#1065 | Kimmel Road Solar, LLC | Du Quoin, IL | 36.2 GWh |
#1066 | Fox Trail | Callahan, FL | 36.1 GWh |
#1067 | SR Canadaville, LLC | Collierville, TN | 36.1 GWh |
#1068 | Sauk Solar Park | Union City, MI | 35.9 GWh |
#1069 | Sunlight Road Solar | Franklinton, LA | 35.8 GWh |
#1070 | RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh |
#1071 | RE Old River One, LLC | Bakersfield, CA | 35.6 GWh |
#1072 | Pinson Solar Farm | Woodruff, SC | 35.5 GWh |
#1073 | Holstein Plant | Maxton, NC | 35.4 GWh |
#1075 | Fort Stewart Solar Facility | Fort Stewart, GA | 35.2 GWh |
#1076 | Altona Solar, LLC | Centralia, MO | 35.2 GWh |
#1077 | Alamosa Solar | Mosca, CO | 35.1 GWh |
#1078 | Imperial Valley Solar Company 1 LLC | Niland, CA | 35.1 GWh |
#1079 | Demille Solar Farm | Lapeer, MI | 35.0 GWh |
#1080 | Hyder II Hybrid | Hyder, AZ | 32.5 GWh |
#1081 | Paloma Solar Hybrid | Gila Bend, AZ | 31.9 GWh |
#1082 | Corcoran Solar | Corcoran, CA | 34.6 GWh |
#1083 | Cottontail Solar 8 | West Manchester Towns, PA | 34.5 GWh |
#1084 | SR Platte Solar Farm | Platteville, CO | 34.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Bird Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anheuser-Busch St Louis | St. Louis, MO | 41.9 GWh | 54 mi |
Audrain Generating Station | Vandalia, MO | 146.4 GWh | 35.8 mi |
Callaway | Fulton, MO | 10.6 TWh | 35.8 mi |
Clarence Cannon | Monroe City, MO | 95.1 GWh | 51.3 mi |
Envoy Solar, LLC | Mexico, MO | 10.3 GWh | 42.2 mi |
Fulton (MO) | Fulton, MO | 161.0 MWh | 43.7 mi |
Hickory Solar | Jerseyville, IL | 65.1 GWh | 44.5 mi |
Huck Finn Renewable Energy Center | Vandalia, MO | 65.4 GWh | 36.2 mi |
IKEA St. Louis 410 | St. Louis, MO | 338.0 MWh | 51.3 mi |
Labadie | Labadie, MO | 14.8 TWh | 28.1 mi |
Mexico | Mexico, MO | 767.0 MWh | 41.1 mi |
MJMEUC Generating Station #1 | Laddonia, MO | 86.7 GWh | 36.5 mi |
Montgomery County Community Solar Center | New Florence, MO | 8.8 GWh | 15.4 mi |
O'Fallon Renewable Energy Center | O'Fallon, MO | 2.3 GWh | 25.1 mi |
Panther Creek Wind Project | Pittsfield, IL | 40.1 GWh | 52 mi |
Pearl Station | Pearl, IL | 161.0 MWh | 47.4 mi |
Peno Creek | Bowling Green, MO | 118.5 GWh | 32 mi |
Pike County Wind Power | Pittsfield, IL | 355.0 MWh | 52.3 mi |
Renewable Energy Center at BJH | St Louis, MO | 846.0 MWh | 50.6 mi |
Sioux | West Alton, MO | 3.7 TWh | 45.5 mi |