Anticline Wind
18500 Twenty Mile Hill Road, Casper, WY 82601Plant Summary Information
Anticline Wind is ranked #25 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
Anticline Wind generated 128.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Anticline Wind |
|---|---|
| Utility Name | Anticline Wind, LLC |
| Location | Natrona County, WY |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 386.9 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,632 out of 12,613 Power Plants Nationwide | |
| Ranked #468 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #25 out of 74 Wyoming Power Plants | |
| Ranked #13 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
Map of Anticline Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Anticline Wind.
Monthly Net Generation for Anticline Wind
Monthly Plant Fuel Consumption for Anticline Wind
Anticline Wind Details
| Summary Information | |
|---|---|
| Plant Name | Anticline Wind (67193) |
| Plant Address | 18500 Twenty Mile Hill Road, Casper, WY 82601 |
| Utility | Anticline Wind, LLC (66072) |
| Latitude, Longitude | 43.14608, -106.34725 |
| Generation Dates on File | Dec 2024 to Dec 2025 |
| Initial Operation Date | December 2024 |
| Annual Generation | 386.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator AC Details Operating December 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 124.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 124.3 MW |
| Winter Capacity | 124.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 38 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 38 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 3.4-140 |
| Design Wind Speed | 13.2 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 322 |
Anticline Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #458 | Keechi Wind | Jacksboro, TX | 394.9 GWh |
| #459 | Timber Road IV | Payne, OH | 394.6 GWh |
| #460 | Crossing Trails Wind Power Project LLC. | Seibert, CO | 394.2 GWh |
| #461 | Osceola Windpower LLC | Harris, IA | 393.8 GWh |
| #462 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 393.1 GWh |
| #463 | Coyote Ridge | White, SD | 393.0 GWh |
| #464 | Skookumchuck Wind Facility | Rainier, WA | 392.8 GWh |
| #465 | Shiloh I Wind Project | Rio Vista, CA | 389.6 GWh |
| #466 | Voyager Wind I | Mojave, CA | 388.9 GWh |
| #467 | Fenton Wind Farm | Chandler, MN | 387.9 GWh |
| #469 | New Frontier Wind | Ruso, ND | 386.8 GWh |
| #470 | Pegasus Wind | Reese, MI | 386.8 GWh |
| #471 | Cimarron Wind Energy LLC | Cimmaron, KS | 382.9 GWh |
| #472 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh |
| #473 | Wildhorse Mountain Wind Facility | Clayton, OK | 381.9 GWh |
| #474 | Baldwin Wind LLC | Wilton, ND | 381.1 GWh |
| #475 | Quilt Block Wind Farm LLC | Darlington, WI | 381.1 GWh |
| #476 | Pine River Wind Park | Shepherd, MI | 380.6 GWh |
| #477 | Grand Meadow | Dexter, MN | 380.3 GWh |
| #478 | Lost Creek Wind Energy Facility | King City, MO | 380.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Anticline Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alcova | Alcova, WY | 119.2 GWh | 45.4 mi |
| Barber Creek | Gillette, WY | 273.0 MWh | 49.2 mi |
| Campbell Hill Windpower | Glenrock, WY | 253.7 GWh | 19.8 mi |
| Casper Wind Farm | Evansville, WY | 5.7 GWh | 19.1 mi |
| Cedar Springs I | Douglas, WY | 699.7 GWh | 45 mi |
| Cedar Springs II | Douglas, WY | 652.4 GWh | 51 mi |
| Cedar Springs III | Douglas, WY | 475.4 GWh | 38.8 mi |
| Cedar Springs Wind IV | Douglas, WY | 1.1 TWh | 32.2 mi |
| Dave Johnston | Glen Rock, WY | 4.3 TWh | 35.8 mi |
| Dunlap | Medicine Bow, WY | 366.5 GWh | 76.8 mi |
| Ekola Flats | Hanna, WY | 736.1 GWh | 83.9 mi |
| Fremont Canyon | Alcova, WY | 227.7 GWh | 51.5 mi |
| Glenrock | Glenrock, WY | 401.0 GWh | 27.3 mi |
| Hartzog | Wright, WY | 178.0 MWh | 62.4 mi |
| Kortes | Sinclair, WY | 155.4 GWh | 72.4 mi |
| Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh | 37.7 mi |
| Rolling Hills | Glenrock, WY | 244.8 GWh | 25.6 mi |
| Seminoe | Sinclair, WY | 137.0 GWh | 74.1 mi |
| TB Flats | Medicine Bow, WY | 1.4 TWh | 67.2 mi |
| Top of the World Windpower Project | Glenrock, WY | 495.8 GWh | 32.1 mi |