Desert Sky
8135 E Hwy 190, Iraan, TX 79744Plant Summary Information
Desert Sky is ranked #114 out of 231 wind farms in Texas in terms of total annual net electricity generation.
Desert Sky generated 128.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Desert Sky |
|---|---|
| Utility Name | Desert Sky Wind Farm LP |
| Location | Pecos County, TX |
| Initial Operation Date | January 2002 |
| Last Update | Dec 2025 |
| Annual Generation | 541.2 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,298 out of 13,301 Power Plants Nationwide | |
| Ranked #356 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #271 out of 861 Texas Power Plants | |
| Ranked #114 out of 231 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Desert Sky
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Desert Sky.
Monthly Net Generation for Desert Sky
Monthly Plant Fuel Consumption for Desert Sky
Desert Sky Details
| Summary Information | |
|---|---|
| Plant Name | Desert Sky (55992) |
| Plant Address | 8135 E Hwy 190, Iraan, TX 79744 |
| Utility | Desert Sky Wind Farm LP (49796) |
| Latitude, Longitude | 30.9178, -102.0867 |
| Generation Dates on File | Jan 2002 to Dec 2025 |
| Initial Operation Date | January 2002 |
| Annual Generation | 541.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating January 2002
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 167.7 MW |
| Summer Capacity | 167.7 MW |
| Winter Capacity | 167.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2002 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 107 |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 107 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 S |
| Design Wind Speed | 16.5 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 212.2 |
Desert Sky Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #346 | New Mexico Wind Energy Center | House, NM | 548.8 GWh |
| #347 | High Trail Wind Farm LLC | Ellsworth, IL | 547.9 GWh |
| #348 | Wheatridge Hybrid | Morrow, OR | 663.0 GWh |
| #349 | Flat Ridge 5 | Harper, KS | 546.5 GWh |
| #350 | Intrepid | Schaller, IA | 546.4 GWh |
| #351 | Grant Plains Wind, LLC | Medford, OK | 545.6 GWh |
| #352 | Desert Wind Farm, LLC | Hertford, NC | 545.0 GWh |
| #353 | Blackjack Creek Wind Farm | Skidmore, TX | 544.7 GWh |
| #354 | Chapman Ranch Wind I | Corpus Christi, TX | 544.3 GWh |
| #355 | Prairie Breeze | Elgin, NE | 543.3 GWh |
| #357 | Top of the World Windpower Project | Glenrock, WY | 541.1 GWh |
| #358 | Rockhaven Wind Project, LLC | Hennepin, OK | 539.9 GWh |
| #359 | Delta Wind Farm (MS) | Dundee, MS | 539.5 GWh |
| #360 | Sherbino II | Ft. Stockton, TX | 538.8 GWh |
| #361 | White Creek Wind Farm | Roosevelt, WA | 536.0 GWh |
| #362 | McCrae Wind Energy II | Garden City, TX | 533.7 GWh |
| #363 | Kossuth | Lu Verne, IA | 533.6 GWh |
| #364 | Northern Colorado Wind LLC | Peetz, CO | 530.8 GWh |
| #365 | Panther Creek Wind Farm I | Big Spring, TX | 529.7 GWh |
| #366 | Canadian Hills Wind | El Rino, OK | 529.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Desert Sky.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 206.6 GWh | 12.1 mi |
| Appaloosa Run Wind | Rankin, TX | 698.3 GWh | 22.4 mi |
| Big Sampson Wind | TBD, TX | 826.9 GWh | 14.7 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 352.0 GWh | 25.7 mi |
| Crane Solar Project | Crane, TX | 387.3 GWh | 26.8 mi |
| East Pecos Solar | McCamey, TX | 238.0 GWh | 12.9 mi |
| Emerald Grove | Crane, TX | 225.6 GWh | 20.2 mi |
| Greasewood Solar | Fort Stockton, TX | 448.2 GWh | 25 mi |
| High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.6 TWh | 21.3 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 638.3 GWh | 22.1 mi |
| Midway Solar - TX | Fort Stockton, TX | 305.2 GWh | 9.7 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 178.5 GWh | 6.9 mi |
| Pearl Solar | Fort Stockton, TX | 86.1 GWh | 11.8 mi |
| RE Maplewood | McCamey, TX | 529.6 GWh | 10.9 mi |
| Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh | 21.8 mi |
| Shamrock Wind | TBD, TX | 859.1 GWh | 28.5 mi |
| Sherbino II | Ft. Stockton, TX | 538.8 GWh | 26.8 mi |
| Upton County Solar | McCamey, TX | 274.0 GWh | 25.4 mi |
| Woodward Mountain I | Girvin, TX | 147.6 GWh | 19.5 mi |
| Woodward Mountain II | Girvin, TX | 132.5 GWh | 19.5 mi |