Golden Triangle II
TBD, St.Artesia, MS 39736Plant Summary Information
Golden Triangle II is ranked #25 out of 55 power plants in Mississippi in terms of total annual net electricity generation.
Golden Triangle II generated 98.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Golden Triangle II |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Lowndes County, MS |
| Initial Operation Date | May 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 322.3 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,878 out of 12,539 Power Plants Nationwide | |
| Ranked #223 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #25 out of 55 Mississippi Power Plants | |
| Ranked #3 out of 22 Mississippi Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
OE_MS6 (2021 to 2023) Origis Energy USA, Inc (2024 to 2024) |
Map of Golden Triangle II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Golden Triangle II.
Monthly Net Generation for Golden Triangle II
Golden Triangle II Details
| Summary Information | |
|---|---|
| Plant Name | Golden Triangle II (65291) |
| Plant Address | TBD, St.Artesia, MS 39736 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 33.4155, -88.6223 |
| Generation Dates on File | May 2024 to Sep 2025 |
| Initial Operation Date | May 2024 |
| Annual Generation | 322.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 161.00 kV |
| Energy Storage | Yes |
Generator MS6_S Details Operating May 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 200 |
|---|---|
| Maximum Charge Rate | 50 MW |
| Maximum Discharge Rate | 50 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 37.5 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Excess Wind And Solar Generation | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65291 |
| Direct Support Gen Id | MS6_S |
| Support T D Asset | No |
Generator OEMS6 Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 52 |
| DC Net Capacity | 212.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Golden Triangle II Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #213 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
| #214 | Calhoun Solar | Battle Creek, MI | 337.3 GWh |
| #215 | Maverick Solar 7, LLC | Desert Center, CA | 336.8 GWh |
| #216 | American Kings Solar, LLC | Lemoore, CA | 334.0 GWh |
| #217 | Agave | Arlington, AZ | 333.8 GWh |
| #218 | SR Russellville | Olmstead, KY | 332.9 GWh |
| #219 | Golden Triangle | Lowndes, MS | 327.5 GWh |
| #220 | Markum Solar Farm | Valley Mills, TX | 332.8 GWh |
| #221 | Vikings Energy Farm | Holtville, CA | 310.4 GWh |
| #222 | South Cheyenne Solar | South Greeley, WY | 330.1 GWh |
| #224 | Sun Streams 2 | Hassayampa, AZ | 327.6 GWh |
| #225 | Washington County Solar | Sandersville, GA | 322.6 GWh |
| #226 | Big River Solar | Norris City, IL | 322.1 GWh |
| #227 | Edwards Sanborn E4 | Mojave, CA | 316.3 GWh |
| #228 | Umbriel Solar | Livington, TX | 321.1 GWh |
| #229 | Cove Mountain Solar 2 | Beryl, UT | 320.3 GWh |
| #230 | Cavalier Solar | Smithfield, VA | 319.6 GWh |
| #231 | Elora Solar | Elora, TN | 318.4 GWh |
| #232 | Quitman Solar | Quitman, GA | 317.1 GWh |
| #233 | Quitman II Solar | Quitman, GA | 315.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Golden Triangle II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Attala | Sallis, MS | 2.3 TWh | 66.9 mi |
| Bankhead Dam | Northport, AL | 107.8 GWh | 73 mi |
| Caledonia | Steens, MS | 5.5 TWh | 25.7 mi |
| Choctaw County | French Camp, MS | 4.9 TWh | 46.9 mi |
| Columbus MS | Columbus, MS | 465.4 GWh | 10.1 mi |
| Golden Triangle | Lowndes, MS | 327.5 GWh | 0.3 mi |
| Greene County | Demopolis, AL | 1.4 TWh | 74.4 mi |
| Holt Dam | Tuscaloosa, AL | 119.3 GWh | 68.6 mi |
| Kemper County | De Kalb, MS | 16.9 GWh | 42.7 mi |
| Meridian | Meridian, MS | 434.0 MWh | 59.8 mi |
| Meridian II | Meridian, MS | 7.2 GWh | 59.6 mi |
| Meridian III | Meridian, MS | 119.9 GWh | 66.6 mi |
| Prairie Bluff | Houston, MS | 7.2 GWh | 42.9 mi |
| Quantum Choctaw Power LLC | Ackerman, MS | 4.4 TWh | 33.9 mi |
| Ratcliffe | De Kalb, MS | 4.2 TWh | 53.2 mi |
| Red Hills Generating Facility | Ackerman, MS | 2.3 TWh | 34.5 mi |
| SR Houston | Houston, MS | 1.5 GWh | 41.4 mi |
| Sweatt | Meridian, MS | 165.1 MWh | 77.9 mi |
| Walnut Grove Demonstration Plant | Walnut Grove, MS | 3.6 GWh | 75.2 mi |
| WestRock Demopolis Mill | Demopolis, AL | 313.0 GWh | 76.3 mi |