Central Line Solar, LLC
1100 W CORNMAN ROAD, Coolidge, AZ 85131Plant Summary Information
Central Line Solar, LLC is ranked #46 out of 159 power plants in Arizona in terms of total annual net electricity generation.
Central Line Solar, LLC generated 56.0 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Central Line Solar, LLC |
---|---|
Utility Name | AES Distributed Energy |
Location | Pinal County, AZ |
Initial Operation Date | April 2022 |
Last Update | Mar 2025 |
Annual Generation | 279.1 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,958 out of 11,623 Power Plants Nationwide | |
Ranked #209 out of 5,666 Solar Power Plants Nationwide | |
Ranked #46 out of 159 Arizona Power Plants | |
Ranked #15 out of 107 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Central Line Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Line Solar, LLC.
Monthly Net Generation for Central Line Solar, LLC
Central Line Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Central Line Solar, LLC (64566) |
Plant Address | 1100 W CORNMAN ROAD, Coolidge, AZ 85131 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 32.83432, -111.56803 |
Generation Dates on File | Apr 2022 to Mar 2025 |
Initial Operation Date | April 2022 |
Annual Generation | 279.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 21-36-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator CNTRL Details Operating April 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 25 |
DC Net Capacity | 125 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Central Line Solar, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#199 | Valentine Solar, LLC | Rosamond, CA | 292.3 GWh |
#200 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#201 | Rowland Solar II | Richmond, TX | 289.5 GWh |
#202 | Double Back Diamond | Virden, IL | 289.0 GWh |
#203 | Hudson - High Desert Hybrid | Victorville, CA | 280.3 GWh |
#204 | ANSON Solar Center, LLC | Anson, TX | 287.5 GWh |
#205 | Hardin Solar Energy LLC | Alger, OH | 286.6 GWh |
#206 | Orion I Solar Project | Burlington, TX | 284.1 GWh |
#207 | Fighting Jays Solar Project | Needville, TX | 282.9 GWh |
#208 | West Line Solar, LLC | City of Eloy, AZ | 279.6 GWh |
#210 | Colonial Trail West | Spring Grove, VA | 278.8 GWh |
#211 | Boulder Solar Power, LLC | Boulder City, NV | 278.4 GWh |
#212 | Emerald Grove | Crane, TX | 277.8 GWh |
#213 | Saint Solar | Coolidge, AZ | 277.6 GWh |
#214 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
#215 | Wood County | Nekoosa, WI | 276.9 GWh |
#216 | Hunter Solar LLC (UT) | Clawson, UT | 273.5 GWh |
#217 | BPL Files Solar | Itasca, TX | 272.8 GWh |
#218 | Oberon IA | Odessa, TX | 272.5 GWh |
#219 | Ivanpah 2 | Nipton, CA | 283.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Line Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bonnybrooke PV | Florence, AZ | 118.7 GWh | 20.1 mi |
Brittlebush Solar | Coolidge, AZ | 197.7 GWh | 7.8 mi |
Coolidge Generation Station | Coolidge, AZ | 126.8 GWh | 6.9 mi |
Desert Basin | Casa Grande, AZ | 2.0 TWh | 13.7 mi |
East Line Solar | Coolidge, AZ | 250.3 GWh | 0.9 mi |
Eleven Mile Solar Center | Coolidge, AZ | 546.9 GWh | 2.3 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 10.7 GWh | 33.9 mi |
Pinal Central Energy Center Hybrid | Casa Grande, AZ | 53.4 GWh | 3 mi |
Poseidon Solar, LLC | Globe, AZ | 51.4 GWh | 23.1 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh | 30 mi |
Red Rock | Red Rock, AZ | 73.5 GWh | 25.4 mi |
Saguaro | Red Rock, AZ | 175.6 GWh | 25 mi |
Saint Solar | Coolidge, AZ | 277.6 GWh | 4.4 mi |
Sandstone Solar | Florence, AZ | 111.1 GWh | 16 mi |
Storey Solar and Storage | Coolidge, AZ | 297.3 GWh | 5.5 mi |
Sundance | Casa Grande, AZ | 369.2 GWh | 6.6 mi |
Union HS at Casa Grande | Casa Grande, AZ | 2.6 GWh | 12.2 mi |
Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.7 GWh | 9.3 mi |
Walmart Casa Grande | Casa Grande, AZ | 1.8 GWh | 12 mi |
West Line Solar, LLC | City of Eloy, AZ | 279.6 GWh | 5.5 mi |