405 Indian Rt J36, Dulce, NM 87528Plant Summary Information
Jicarilla Solar 1 LLC is ranked #20 out of 102 solar farms in New Mexico in terms of total annual net electricity generation.
Jicarilla Solar 1 LLC generated 35.6 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Jicarilla Solar 1 LLC |
|---|---|
| Utility Name | Repsol Renewables NA |
| Location | Rio Arriba County, NM |
| Initial Operation Date | July 2023 |
| Last Update | Jul 2026 |
| Annual Generation | 118.2 GWh |
| Annual Consumption | 458.0 k MMBtu |
| Ranked #3,348 out of 13,285 Power Plants Nationwide | |
| Ranked #851 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #56 out of 158 New Mexico Power Plants | |
| Ranked #20 out of 102 New Mexico Solar Power Plants | |
| Fuel Types | Solar |
Map of Jicarilla Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jicarilla Solar 1 LLC.
Monthly Net Generation for Jicarilla Solar 1 LLC
Monthly Plant Fuel Consumption for Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | Jicarilla Solar 1 LLC (66163) |
| Plant Address | 405 Indian Rt J36, Dulce, NM 87528 |
| Utility | Repsol Renewables NA (65265) |
| Latitude, Longitude | 36.31675, -107.27763 |
| Generation Dates on File | Jul 2023 to Jul 2026 |
| Initial Operation Date | July 2023 |
| Annual Generation | 118.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator JICB1 Details Operating July 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 80 |
|---|---|
| Maximum Charge Rate | 20 MW |
| Maximum Discharge Rate | 20 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 6.6 |
| Storage Enclosure Type | CS |
| Load Management | P |
| Direct Support Of Another Unit | No |
| Support T D Asset | Yes |
Generator JICS1 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 61.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Jicarilla Solar 1 LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #841 | Seabrook Solar | Seabrook, SC | 124.8 GWh |
| #842 | Madison Solar (VA) | Locust Grove, VA | 124.7 GWh |
| #843 | Solar Star Oregon II | Prineville, OR | 124.7 GWh |
| #844 | Macho Springs | Deming, NM | 124.2 GWh |
| #845 | East Atmore Solar | Flomaton, AL | 123.4 GWh |
| #846 | RE Gaskell West 2 LLC | Rosamond, CA | 123.2 GWh |
| #847 | Meherrin Solar | Skippers, VA | 122.9 GWh |
| #848 | Grasshopper Solar | Chase City, VA | 122.8 GWh |
| #849 | Alafia Solar | Mulberry, FL | 122.6 GWh |
| #850 | Hecate Energy Beacon Solar 1 | Cantil, CA | 122.5 GWh |
| #852 | Wheatridge Hybrid | Morrow, OR | 656.5 GWh |
| #853 | Bedford Solar (Dominion) | Chesapeake, VA | 122.1 GWh |
| #854 | Granite Mountain Solar West, LLC | Cedar City, UT | 122.1 GWh |
| #855 | Moonshot | Picayune, MS | 121.9 GWh |
| #856 | Little Manatee River Solar | Ruskin, FL | 121.9 GWh |
| #857 | Hooper Solar | Mosca, CO | 121.9 GWh |
| #858 | Payne Creek Solar | Bowling Green, FL | 121.8 GWh |
| #859 | Laurel Oaks Solar | Plant City, FL | 121.1 GWh |
| #860 | RE Camelot LLC | Mojave, CA | 121.0 GWh |
| #861 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 120.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jicarilla Solar 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abiquiu Dam | Abiquiu, NM | 15.7 GWh | 47.9 mi |
| Alcalde Solar Array | Alcalde, NM | 5.9 GWh | 70.7 mi |
| Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 738.7 GWh | 28.7 mi |
| Bluffview | Farmington, NM | 298.2 GWh | 58.9 mi |
| Cuba 2.5ac, LLC | Cuba, NM | 5.8 GWh | 27.7 mi |
| El Vado Dam | Tierra Amarilla, NM | 4.4 GWh | 35.8 mi |
| Encino Solar Energy Center | Rio Rancho Estates, NM | 130.4 GWh | 70.5 mi |
| Four Corners | Fruitland, NM | 9.5 TWh | 71.7 mi |
| Jicarilla Solar 2 | Dulce, NM | 130.1 GWh | 13.5 mi |
| LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.4 GWh | 64.4 mi |
| Navajo Dam | Farmington, NM | 88.3 GWh | 38.6 mi |
| NMRD Data Center III, LLC | Rio Ranchero, NM | 129.3 GWh | 69.5 mi |
| Red Mesa Wind LLC | Seboyeta, NM | 163.2 GWh | 72.6 mi |
| San Juan Solar I | Kirtland, NM | 531.9 GWh | 69.8 mi |
| Sandoval Solar Energy Center | Rio Rancho, NM | 15.7 GWh | 76 mi |
| Shallow Basket | Dulce, NM | 392.7 GWh | 4.8 mi |
| Syncarpha El Rito | El Rito, NM | 3.5 GWh | 60.5 mi |
| TAG | Rio Rancho, NM | 336.0 GWh | 75.9 mi |
| Vallecito Hydroelectric | Bayfield, CO | 17.4 GWh | 75.2 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 47.3 GWh | 63.8 mi |