Jicarilla Solar 1 LLC
405 Indian Rt J36, Dulce, NM 87528Plant Summary Information
Jicarilla Solar 1 LLC is ranked #18 out of 88 solar farms in New Mexico in terms of total annual net electricity generation.
Jicarilla Solar 1 LLC generated 22.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Jicarilla Solar 1 LLC |
|---|---|
| Utility Name | Repsol Renewables NA |
| Location | Rio Arriba County, NM |
| Initial Operation Date | July 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 112.5 GWh |
| Annual Consumption | 414.8 k MMBtu |
| Ranked #3,307 out of 12,637 Power Plants Nationwide | |
| Ranked #780 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #54 out of 141 New Mexico Power Plants | |
| Ranked #18 out of 88 New Mexico Solar Power Plants | |
| Fuel Types | Solar |
Map of Jicarilla Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jicarilla Solar 1 LLC.
Monthly Net Generation for Jicarilla Solar 1 LLC
Monthly Plant Fuel Consumption for Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | Jicarilla Solar 1 LLC (66163) |
| Plant Address | 405 Indian Rt J36, Dulce, NM 87528 |
| Utility | Repsol Renewables NA (65265) |
| Latitude, Longitude | 36.31675, -107.27763 |
| Generation Dates on File | Jul 2023 to Feb 2026 |
| Initial Operation Date | July 2023 |
| Annual Generation | 112.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of New Mexico (PNM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator JICB1 Details Operating July 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 80 |
|---|---|
| Maximum Charge Rate | 20 MW |
| Maximum Discharge Rate | 20 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 6.6 |
| Storage Enclosure Type | CS |
| Load Management | P |
| Direct Support Of Another Unit | No |
| Support T D Asset | Yes |
Generator JICS1 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 61.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Jicarilla Solar 1 LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #770 | BT Cooke Solar, LLC | Gainsville, TX | 118.6 GWh |
| #771 | Hooper Solar | Mosca, CO | 118.3 GWh |
| #772 | Meridian III | Meridian, MS | 118.3 GWh |
| #773 | Sunlight Road Solar | Franklinton, LA | 118.2 GWh |
| #774 | Glover Creek Solar, LLC | Summer Shade, KY | 118.2 GWh |
| #775 | Maiden Creek Solar Power Plant | Maiden, NC | 117.4 GWh |
| #776 | Sandstone Solar | Florence, AZ | 117.2 GWh |
| #777 | Iris Solar LLC | Franklinton, LA | 117.2 GWh |
| #778 | Payne Creek Solar | Bowling Green, FL | 117.1 GWh |
| #779 | Lamesa II | Lamesa, TX | 117.1 GWh |
| #781 | Skysol | Merrill, OR | 116.9 GWh |
| #782 | Manatee Solar Energy Center | Parrish, FL | 102.9 GWh |
| #783 | Wimauma Solar and Battery Storage | Wimauma, FL | 113.7 GWh |
| #784 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 115.8 GWh |
| #785 | Hecate Energy Beacon Solar 4 | Cantil, CA | 115.3 GWh |
| #786 | Gransolar Texas One, LLC | Thorndale, TX | 115.3 GWh |
| #787 | Landrace Holdings, LLC | Conway, SC | 114.5 GWh |
| #788 | Pavant Solar, LLC | Fillmore, UT | 113.9 GWh |
| #789 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 113.0 GWh |
| #790 | Kellam Solar | Ben Wheeler, TX | 112.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jicarilla Solar 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abiquiu Dam | Abiquiu, NM | 24.3 GWh | 47.9 mi |
| Alcalde Solar Array | Alcalde, NM | 5.6 GWh | 70.7 mi |
| Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 668.1 GWh | 28.7 mi |
| Bluffview | Farmington, NM | 411.1 GWh | 58.9 mi |
| Cuba 2.5ac, LLC | Cuba, NM | 5.9 GWh | 27.7 mi |
| Encino Solar Energy Center | Rio Rancho Estates, NM | 142.5 GWh | 70.5 mi |
| Four Corners | Fruitland, NM | 9.3 TWh | 71.7 mi |
| Jicarilla Solar 2 | Dulce, NM | 128.8 GWh | 13.5 mi |
| Los Alamos PV Site | Los Alamos, NM | 447.0 MWh | 62 mi |
| LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh | 64.4 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 38.6 mi |
| NMRD Data Center III, LLC | Rio Ranchero, NM | 134.7 GWh | 69.5 mi |
| Red Mesa Wind LLC | Seboyeta, NM | 162.1 GWh | 72.6 mi |
| San Juan Solar I | Kirtland, NM | 487.8 GWh | 69.8 mi |
| Sandoval Solar Energy Center | Rio Rancho, NM | 15.6 GWh | 76 mi |
| Shallow Basket | Dulce, NM | 192.3 GWh | 4.8 mi |
| Syncarpha El Rito | El Rito, NM | 3.5 GWh | 60.5 mi |
| TAG | Rio Rancho, NM | 139.4 GWh | 75.9 mi |
| Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 75.2 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 46.7 GWh | 63.8 mi |