Caledonia
255 Lone Oak Rd., Steens, MS 39766Plant Summary Information
Caledonia is ranked #7 out of 58 power plants in Mississippi in terms of total annual net electricity generation.
Caledonia is comprised of 6 generators and generated 1.5 TWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Caledonia |
|---|---|
| Utility Name | Tennessee Valley Authority |
| Location | Lowndes County, MS |
| Initial Operation Date | June 2003 |
| Last Update | Aug 2026 |
| Annual Generation | 4.8 TWh |
| Annual Consumption | 36.8 M MMBtu |
| Ranked #236 out of 13,301 Power Plants Nationwide | |
| Ranked #116 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #7 out of 58 Mississippi Power Plants | |
| Ranked #6 out of 29 Mississippi Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Caledonia
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caledonia.
Monthly Net Generation for Caledonia
Monthly Plant Fuel Consumption for Caledonia
Caledonia Details
| Summary Information | |
|---|---|
| Plant Name | Caledonia (55197) |
| Plant Address | 255 Lone Oak Rd., Steens, MS 39766 |
| Utility | Tennessee Valley Authority (18642) |
| Latitude, Longitude | 33.6464, -88.2717 |
| Generation Dates on File | Mar 2003 to Aug 2026 |
| Initial Operation Date | June 2003 |
| Annual Generation | 4.8 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 01-137-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator CTG1 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCC1 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 161 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 131.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CTG2 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCC2 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 161 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 131.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CTG3 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCC3 |
| Ownership | Wholly Owned by Other Entity |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 161 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 157 MW |
| Winter Capacity | 187 MW |
| Minimum Load | 131.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG1 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CCC1 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| Nameplate Capacity | 106 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 98 MW |
| Winter Capacity | 105 MW |
| Minimum Load | 73.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG2 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CCC2 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| Nameplate Capacity | 106 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 98 MW |
| Winter Capacity | 105 MW |
| Minimum Load | 73.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG3 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CCC3 |
| Ownership | Wholly Owned by Other Entity |
| Duct Burners | Yes |
| Nameplate Capacity | 106 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 98 MW |
| Winter Capacity | 105 MW |
| Minimum Load | 73.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Caledonia Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG1 | 100.00% |
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG2 | 100.00% |
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator CTG3 | 100.00% |
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG1 | 100.00% |
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG2 | 100.00% |
| GE Energy Financial Services | 800 Long Ridge Road, Stamford, CT 6927 | Generator STG3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #106 | Choctaw County | French Camp, MS | 5.1 TWh |
| #107 | Cane Run | Louisville, KY | 5.0 TWh |
| #108 | Port Everglades | Ft. Lauderdale, FL | 5.1 TWh |
| #109 | Morgan Energy Center | Decatur, AL | 5.0 TWh |
| #110 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.0 TWh |
| #111 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #112 | Brandy Branch | Baldwin, FL | 4.8 TWh |
| #113 | Jasper | Hardeeville, SC | 4.8 TWh |
| #114 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh |
| #115 | Tenaska Frontier Generation Station | Shiro, TX | 4.8 TWh |
| #117 | St. Charles Power Station (LA) | La Place, LA | 4.7 TWh |
| #118 | Potomac Energy Center, LLC | Leesburg, VA | 4.7 TWh |
| #119 | CPV Valley Energy Center | Wawayanda, NY | 4.6 TWh |
| #120 | Rio Nogales Power Project | Seguin, TX | 4.6 TWh |
| #121 | CPV Fairview Energy Center | Johnstown, PA | 4.6 TWh |
| #122 | Lowman Energy Center | Leroy, AL | 4.6 TWh |
| #123 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #124 | Buck | Salisbury, NC | 4.5 TWh |
| #125 | Intermountain Power Project | Delta, UT | 5.5 TWh |
| #126 | Key | Brandywine, MD | 4.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Caledonia.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bankhead Dam | Northport, AL | 150.8 GWh | 54.3 mi |
| Choctaw County | French Camp, MS | 5.1 TWh | 70.7 mi |
| Colbert | Tuscumbia, AL | 731.9 GWh | 79.6 mi |
| GCF US Holdings LLC Columbus Mill | Columbus, MS | 536.5 GWh | 22.6 mi |
| Golden Triangle | Lowndes, MS | 409.8 GWh | 25.4 mi |
| Golden Triangle II | St.Artesia, MS | 304.3 GWh | 25.7 mi |
| Greene County | Demopolis, AL | 859.4 GWh | 77.6 mi |
| Holt Dam | Tuscaloosa, AL | 156.6 GWh | 54.6 mi |
| James H Miller Jr | Quinton, AL | 19.0 TWh | 69.7 mi |
| Kemper County | De Kalb, MS | 101.5 GWh | 61.7 mi |
| Lewis Smith Dam | Jasper, AL | 274.6 GWh | 69.9 mi |
| Meridian II | Meridian, MS | 6.8 GWh | 77.6 mi |
| Meridian III | Meridian, MS | 120.0 GWh | 83.9 mi |
| Muscle Shoals | Cherokee, AL | 428.3 GWh | 80.4 mi |
| Optimist | West Point, MS | 300.6 GWh | 18.5 mi |
| Prairie Bluff | Houston, MS | 5.0 GWh | 46.5 mi |
| Quantum Choctaw Power LLC | Ackerman, MS | 3.8 TWh | 57.1 mi |
| Ratcliffe | De Kalb, MS | 3.7 TWh | 74.2 mi |
| Red Hills Generating Facility | Ackerman, MS | 1.9 TWh | 57.6 mi |
| SR Houston | Houston, MS | 2.6 GWh | 46 mi |