Delta's Edge Solar
685 CR 219, Greenwood, MS 38930Plant Summary Information
Delta's Edge Solar is ranked #27 out of 52 power plants in Mississippi in terms of total annual net electricity generation.
Delta's Edge Solar generated 37.1 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Delta's Edge Solar |
---|---|
Utility Name | Cubico USA, LLC |
Location | Carroll County, MS |
Initial Operation Date | November 2023 |
Last Update | Mar 2025 |
Annual Generation | 201.5 GWh |
Annual Consumption | 748.0 k MMBtu |
Ranked #2,341 out of 11,623 Power Plants Nationwide | |
Ranked #313 out of 5,666 Solar Power Plants Nationwide | |
Ranked #27 out of 52 Mississippi Power Plants | |
Ranked #3 out of 20 Mississippi Solar Power Plants | |
Fuel Types | Solar |
Map of Delta's Edge Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Delta's Edge Solar.
Monthly Net Generation for Delta's Edge Solar
Delta's Edge Solar Details
Summary Information | |
---|---|
Plant Name | Delta's Edge Solar (66759) |
Plant Address | 685 CR 219, Greenwood, MS 38930 |
Utility | Cubico USA, LLC (62161) |
Latitude, Longitude | 33.5, -90.1 |
Generation Dates on File | Nov 2023 to Mar 2025 |
Initial Operation Date | November 2023 |
Annual Generation | 201.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Entergy Mississippi LLC (12685) MS |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator DELTA Details Operating November 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Other Planned Modifications | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 134 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Delta's Edge Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#303 | Porter Solar, LLC (TX) | Krum, TX | 205.0 GWh |
#304 | Rocket Solar, LLC | Corinne, UT | 204.7 GWh |
#305 | Sigurd Solar LLC | Sigurd, UT | 204.7 GWh |
#306 | Techren Solar I LLC | Boulder, NV | 204.4 GWh |
#307 | RE Astoria | Rosamond, CA | 203.9 GWh |
#308 | SR Arlington II | Blakely, GA | 203.7 GWh |
#309 | Southampton Solar, LLC | Newsoms, VA | 203.7 GWh |
#310 | Clover Creek Solar Community Solar | Mona, UT | 202.5 GWh |
#311 | Mammoth North Solar | Knox, IN | 202.5 GWh |
#312 | Two Creeks Solar | Two Rivers, WI | 201.7 GWh |
#314 | Lapetus | Andrews, TX | 201.4 GWh |
#315 | Solverde 1 | Lancaster, CA | 201.4 GWh |
#316 | Cutlass Solar 1 LLC | Richmond, TX | 200.9 GWh |
#317 | Badger Hollow I | Montfort, WI | 200.5 GWh |
#318 | Cereal City Solar, LLC | Battle Creek, MI | 199.9 GWh |
#319 | Badger Hollow II | Cobb, WI | 199.6 GWh |
#320 | Graphite Solar I | Wellington, UT | 198.4 GWh |
#321 | Pioneer Solar (CO), LLC | Bennett, CO | 197.9 GWh |
#322 | Brittlebush Solar | Coolidge, AZ | 197.7 GWh |
#323 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Delta's Edge Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Attala | Sallis, MS | 2.2 TWh | 41.6 mi |
Batesville Generation Facility | Batesville, MS | 4.9 TWh | 58.6 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 142.2 GWh | 44.2 mi |
Chicot Solar | Lake Village, AR | 214.4 GWh | 72 mi |
Choctaw County | French Camp, MS | 5.5 TWh | 41.9 mi |
Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh | 67 mi |
Crossroads Energy Center | Clarksdale, MS | 207.9 GWh | 54.1 mi |
Dam 2 | Dumas, AR | 342.3 GWh | 77.5 mi |
Delta Wind Farm (MS) | Dundee, MS | 525.5 GWh | 69 mi |
Harvest Gold Solar | Indianola, MS | 118.8 GWh | 30.9 mi |
Hinds Energy Facility | Jackson, MS | 3.0 TWh | 77.8 mi |
International Paper Vicksburg Mill | Vicksburg, MS | 203.6 GWh | 77.6 mi |
Pearl River Solar Park LLC | Morton, MS | 259.5 GWh | 69 mi |
Prairie Bluff | Houston, MS | 7.8 GWh | 71 mi |
Quantum Choctaw Power LLC | Ackerman, MS | 4.6 TWh | 52.1 mi |
Ragsdale Solar LLC | Canton, MS | 69.3 GWh | 65.8 mi |
Red Hills Generating Facility | Ackerman, MS | 1.8 TWh | 51.6 mi |
SR Houston | Houston, MS | 1.9 GWh | 69.9 mi |
Sunflower County | Ruleville, MS | 101.0 GWh | 30.8 mi |
Walnut Grove Demonstration Plant | Walnut Grove, MS | 1.3 GWh | 73.8 mi |