Grant County

6006 Stage Rd, Town of Potosi, WI 53820

Plant Summary Information

Grant County is ranked #15 out of 261 power plants in Wisconsin in terms of total annual net electricity generation.

Grant County generated 138.9 GWh during the 3-month period between April 2026 to July 2026.

Plant NameGrant County
Utility NameWisconsin Power & Light Co
LocationGrant County, WI
Initial Operation DateMay 2024
Last Update Jul 2026
Annual Generation 380.4 GWh
Annual Consumption 1.4 M MMBtu
Ranked #1,722 out of 13,285 Power Plants Nationwide
Ranked #223 out of 7,198 Solar Power Plants Nationwide
Ranked #15 out of 261 Wisconsin Power Plants
Ranked #1 out of 113 Wisconsin Solar Power Plants
Fuel Types Solar

Map of Grant County

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grant County.

Create Your Account Today

Monthly Net Generation for Grant County

Monthly Plant Fuel Consumption for Grant County

Grant County Details

Summary Information
Plant NameGrant County (65007)
Plant Address6006 Stage Rd, Town of Potosi, WI 53820
UtilityWisconsin Power & Light Co (20856)
Latitude, Longitude42.71898, -90.70104
Generation Dates on FileJun 2024 to Jul 2026
Initial Operation DateMay 2024
Annual Generation 380.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerAmerican Transmission Co (659)
Grid Voltage 138.00 kV
Energy StorageYes

Generator PV1 Details Operating May 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
RTO ISO LMP Node DesignationALTE.GRANTCTY
RTO ISO Location Designation For Reporting Wholesale Sales DataALTE.GRANTCTY
Nameplate Capacity200 MW
Nameplate Power Factor0.95
Summer Capacity200 MW
Winter Capacity200 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Other Planned ModificationsNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity256 MW
Crystalline SiliconYes
Thin Film CDTEYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator BESS1 Details Operating October 2025

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
RTO ISO LMP Node DesignationALTE.WOOD.ESR
RTO ISO Location Designation For Reporting Wholesale Sales DataALTE.WOOD.ESR
Nameplate Capacity100 MW
Nameplate Power Factor0.95
Summer Capacity100 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceElectricity used for energy storage
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Other Planned ModificationsNo
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo
Energy Storage Details
Nameplate Energy Capacity MWH400
Maximum Charge Rate100 MW
Maximum Discharge Rate100 MW
Storage TechnologyECC
Nameplate Reactive Power Rating79.9
Storage Enclosure TypeOT
ArbitrageP
Direct Support Of Another UnitNo
Support T D AssetNo

Grant County Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#213Scarlet II HybridCantua Creek, CA368.8 GWh
#214Riverstart Solar Park LLCModoc, IN390.7 GWh
#215Yellow Pine IIEnterprise, NV373.5 GWh
#216Speedway Solar, LLCMorrison Town, IN388.3 GWh
#217Crooked Lake Solar, LLCBlytheville, AR388.2 GWh
#218Crane Solar ProjectCrane, TX387.6 GWh
#219Wright Solar ParkLos Banos, CA386.0 GWh
#220Corazon Energy LLCRachito Las Lomas, TX385.6 GWh
#221ChestnutLemoore, CA360.0 GWh
#222Impact Solar 1Deport, TX382.5 GWh
#224Buena Vista Energy CenterChaparral, NM379.0 GWh
#225Shakes SolarCarrizo Springs, TX381.2 GWh
#226Cavalry Solar HybridMonon, IN366.6 GWh
#227Yellow Pine SolarEnterprise, NV368.7 GWh
#228Indiana Crossroads Solar ParkReynolds, IN380.3 GWh
#229Gibson SolarPrinceton, IN379.7 GWh
#230Sherco Solar IIBecker, MN378.4 GWh
#231Prairie Wolf Solar LLCNorth Ashmore, IL377.8 GWh
#232Solar Gen 2 Solar FacilityCalipatria, CA376.7 GWh
#233Swift Air Solar IGoldsmith, TX376.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Grant County.

Plant NamePlant LocationAnnual GenerationDistance
Alliant SBD 9205 A Y McDonaldDubuque, IA16.7 MWh15.9 mi
Alliant SBD 9301 Prairie FarmsDubuque, IA68.6 MWh13.1 mi
Apple Canyon Lake SolarApple River, IL3.2 GWh32.9 mi
Badger Hollow IMontfort, WI200.6 GWh23.7 mi
Badger Hollow IICobb, WI214.3 GWh23.7 mi
BellevueBellevue, IA10.0 MWh35.5 mi
CascadeCascade, IA31.0 MWh33.1 mi
Cassville SolarCassville, WI100.3 GWh11.7 mi
EarlvilleEarlville, IA7.0 MWh33 mi
Elk Wind FarmGreeley, IA172.9 GWh35.3 mi
FennimoreFennimore, WI75.0 MWh18.4 mi
Fennimore SolarFennimore, WI4.8 GWh17.5 mi
HopkintonHopkinton, IA54.0 MWh38 mi
John Deere Dubuque WorksDubuque, IA52.0 MWh10.1 mi
McGregorMcGregor, IA11.0 MWh31.9 mi
Montfort Wind Energy CenterMontfort, WI50.2 GWh23.2 mi
Mt. Hope DPC SolarMt. Hope, WI2.1 GWh18.9 mi
Quilt Block Wind Farm LLCDarlington, WI369.4 GWh22.4 mi
Red Barn EnergyMontfort, WI255.3 GWh20.8 mi
West Dubuque SolarDubuque, IA6.3 GWh16.4 mi