Grant County
6006 Stage Rd, Town of Potosi, WI 53820Plant Summary Information
Grant County is ranked #17 out of 260 power plants in Wisconsin in terms of total annual net electricity generation.
Grant County generated 113.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Grant County |
|---|---|
| Utility Name | Wisconsin Power & Light Co |
| Location | Grant County, WI |
| Initial Operation Date | May 2024 |
| Last Update | May 2026 |
| Annual Generation | 375.2 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,719 out of 13,081 Power Plants Nationwide | |
| Ranked #213 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #17 out of 260 Wisconsin Power Plants | |
| Ranked #1 out of 112 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of Grant County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grant County.
Monthly Net Generation for Grant County
Monthly Plant Fuel Consumption for Grant County
Grant County Details
| Summary Information | |
|---|---|
| Plant Name | Grant County (65007) |
| Plant Address | 6006 Stage Rd, Town of Potosi, WI 53820 |
| Utility | Wisconsin Power & Light Co (20856) |
| Latitude, Longitude | 42.71898, -90.70104 |
| Generation Dates on File | Jun 2024 to May 2026 |
| Initial Operation Date | May 2024 |
| Annual Generation | 375.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | American Transmission Co (659) |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator PV1 Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTE.GRANTCTY |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTE.GRANTCTY |
| Nameplate Capacity | 200 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 256 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BESS1 Details Operating October 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTE.WOOD.ESR |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTE.WOOD.ESR |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 400 |
|---|---|
| Maximum Charge Rate | 100 MW |
| Maximum Discharge Rate | 100 MW |
| Storage Technology | ECC |
| Nameplate Reactive Power Rating | 79.9 |
| Storage Enclosure Type | OT |
| Arbitrage | P |
| Ac Coupled | No |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Grant County Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #203 | Buena Vista Energy Center | Chaparral, NM | 382.8 GWh |
| #204 | Impact Solar 1 | Deport, TX | 384.9 GWh |
| #205 | Stoneridge Solar, LLC | Thorndale, TX | 384.9 GWh |
| #206 | Indiana Crossroads Solar Park | Reynolds, IN | 384.4 GWh |
| #207 | Sequoia 1 | Cisco, TX | 380.9 GWh |
| #208 | Corazon Energy LLC | Rachito Las Lomas, TX | 380.7 GWh |
| #209 | Dry Lake Solar Energy Center | Moapa, NV | 362.7 GWh |
| #210 | Speedway Solar, LLC | Morrison Town, IN | 379.1 GWh |
| #211 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.7 GWh |
| #212 | Prairie Wolf Solar LLC | North Ashmore, IL | 376.0 GWh |
| #214 | Cavalry Solar Hybrid | Monon, IN | 359.9 GWh |
| #215 | Mount Signal Solar Farm II | Calexico, CA | 373.2 GWh |
| #216 | Edwards Sanborn E1B | Mojave, CA | 354.4 GWh |
| #217 | Mustang Two | Lemoore, CA | 372.7 GWh |
| #218 | Twiggs Solar | Dry Branch, GA | 371.9 GWh |
| #219 | Northern Orchard Solar PV, LLC | Taft, CA | 366.4 GWh |
| #220 | Raceway Solar & Storage | Lancaster, CA | 361.7 GWh |
| #221 | RE Roserock | Fort Stockton, TX | 369.0 GWh |
| #222 | Calhoun Solar | Battle Creek, MI | 368.8 GWh |
| #223 | Rambler | San Angelo, TX | 368.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grant County.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant SBD 9205 A Y McDonald | Dubuque, IA | 16.7 MWh | 15.9 mi |
| Alliant SBD 9301 Prairie Farms | Dubuque, IA | 68.6 MWh | 13.1 mi |
| Apple Canyon Lake Solar | Apple River, IL | 3.2 GWh | 32.9 mi |
| Badger Hollow I | Montfort, WI | 200.7 GWh | 23.7 mi |
| Badger Hollow II | Cobb, WI | 212.9 GWh | 23.7 mi |
| Bellevue | Bellevue, IA | 10.0 MWh | 35.5 mi |
| Cascade | Cascade, IA | 31.0 MWh | 33.1 mi |
| Cassville Solar | Cassville, WI | 98.7 GWh | 11.7 mi |
| Earlville | Earlville, IA | 7.0 MWh | 33 mi |
| Elk Wind Farm | Greeley, IA | 172.9 GWh | 35.3 mi |
| Fennimore | Fennimore, WI | 75.0 MWh | 18.4 mi |
| Fennimore Solar | Fennimore, WI | 4.8 GWh | 17.5 mi |
| Hopkinton | Hopkinton, IA | 54.0 MWh | 38 mi |
| John Deere Dubuque Works | Dubuque, IA | 45.0 MWh | 10.1 mi |
| McGregor | McGregor, IA | 11.0 MWh | 31.9 mi |
| Montfort Wind Energy Center | Montfort, WI | 51.3 GWh | 23.2 mi |
| Mt. Hope DPC Solar | Mt. Hope, WI | 2.1 GWh | 18.9 mi |
| Quilt Block Wind Farm LLC | Darlington, WI | 371.4 GWh | 22.4 mi |
| Red Barn Energy | Montfort, WI | 256.7 GWh | 20.8 mi |
| West Dubuque Solar | Dubuque, IA | 6.3 GWh | 16.4 mi |