Montague Solar
18727 Bottimiller Lane, Arlington, OR 97812Plant Summary Information
Montague Solar is ranked #27 out of 261 power plants in Oregon in terms of total annual net electricity generation.
Montague Solar generated 39.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Montague Solar |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Gilliam County, OR |
| Initial Operation Date | April 2023 |
| Last Update | Mar 2026 |
| Annual Generation | 365.4 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,732 out of 12,332 Power Plants Nationwide | |
| Ranked #212 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #27 out of 261 Oregon Power Plants | |
| Ranked #1 out of 124 Oregon Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Avangrid Renewables LLC (2019 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Montague Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Montague Solar.
Monthly Net Generation for Montague Solar
Monthly Plant Fuel Consumption for Montague Solar
Montague Solar Details
| Summary Information | |
|---|---|
| Plant Name | Montague Solar (63441) |
| Plant Address | 18727 Bottimiller Lane, Arlington, OR 97812 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 45.54, -120.18 |
| Generation Dates on File | Apr 2023 to Mar 2026 |
| Initial Operation Date | April 2023 |
| Annual Generation | 365.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG21-221-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Avangrid Renewables LLC (AVRN) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator S1 Details Operating April 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 162 MW |
| Summer Capacity | 162 MW |
| Winter Capacity | 162 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Bifacial | Yes |
|---|---|
| DC Net Capacity | 210.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Montague Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #202 | Edwards Sanborn E1B | Mojave, CA | 353.9 GWh |
| #203 | Markum Solar Farm | Valley Mills, TX | 370.8 GWh |
| #204 | Blythe Solar III, LLC Hybrid | Blythe, CA | 357.0 GWh |
| #205 | Maverick Solar, LLC | Desert Center, CA | 369.3 GWh |
| #206 | Corazon Energy LLC | Rachito Las Lomas, TX | 369.2 GWh |
| #207 | Castle Gap Solar Hybrid | McCarney, TX | 368.4 GWh |
| #208 | Zier Solar | Brackettville, TX | 362.2 GWh |
| #209 | Blythe Solar IV, LLC | Blythe, CA | 359.2 GWh |
| #210 | Lund Hill Solar | Bickleton, WA | 366.2 GWh |
| #211 | Rambler | San Angelo, TX | 365.5 GWh |
| #213 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
| #214 | Camilla Solar Energy Project | Camilla, GA | 363.8 GWh |
| #215 | Spanish Peaks Solar | Trinidad, CO | 361.7 GWh |
| #216 | Twiggs Solar | Dry Branch, GA | 360.1 GWh |
| #217 | Hardy Hills Solar Energy LLC | Frankfort, IN | 358.7 GWh |
| #218 | Hillcrest Solar | Mt. Orab, OH | 357.3 GWh |
| #219 | Darien Solar | Darien, WI | 356.7 GWh |
| #220 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
| #221 | Newport Solar Project | Newport, AR | 354.9 GWh |
| #222 | Ganado Solar | Gail, TX | 345.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Montague Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Wind Power Project | Arlington, OR | 201.0 GWh | 12.3 mi |
| Condon Windpower LLC | Condon, OR | 77.0 GWh | 18.8 mi |
| Harvest Wind Project | Roosevelt, WA | 263.7 GWh | 20.5 mi |
| Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh | 19.1 mi |
| Horseshoe Bend Wind LLC | Arlington, OR | 611.6 GWh | 8.9 mi |
| Klondike Wind Power | Wasco, OR | 17.8 GWh | 18 mi |
| Klondike Windpower II | Wasco, OR | 245.8 GWh | 20.1 mi |
| Klondike Windpower III | Wasco, OR | 716.5 GWh | 16 mi |
| Leaning Juniper | Arlington, OR | 275.2 GWh | 7.9 mi |
| Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh | 8.6 mi |
| Montague Wind Power Facility LLC | Arlington, OR | 490.5 GWh | 5.4 mi |
| North Hurlburt Wind LLC | Arlington, OR | 551.8 GWh | 14 mi |
| Pebble Springs Wind LLC | Wasco, OR | 219.0 GWh | 12.2 mi |
| South Hurlburt Wind LLC | Arlington, OR | 584.7 GWh | 12.5 mi |
| Star Point Wind Project LLC | Wasco, OR | 217.8 GWh | 14.7 mi |
| Threemile Canyon | Boardman, OR | 22.4 GWh | 15 mi |
| Threemile Digester | Boardman, OR | 36.4 GWh | 17.9 mi |
| Waste Management Columbia Ridge LFGTE | Arlington, OR | 55.3 GWh | 6.1 mi |
| Wheat Field Wind Power Project | Arlington, OR | 198.0 GWh | 11.5 mi |
| Willow Creek Energy Center | Lone, OR | 168.7 GWh | 12 mi |