Seymour Hills Wind Project, LLC
TBD, Seymour, TX 76380Plant Summary Information
Seymour Hills Wind Project, LLC is ranked #205 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Seymour Hills Wind Project, LLC generated 38.3 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Seymour Hills Wind Project, LLC |
|---|---|
| Utility Name | Engie North America |
| Location | Baylor County, TX |
| Initial Operation Date | May 2019 |
| Last Update | Mar 2026 |
| Annual Generation | 135.3 GWh |
| Annual Consumption | 461.6 k MMBtu |
| Ranked #3,074 out of 12,332 Power Plants Nationwide | |
| Ranked #852 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #486 out of 814 Texas Power Plants | |
| Ranked #205 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Seymour Hills Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seymour Hills Wind Project, LLC.
Monthly Net Generation for Seymour Hills Wind Project, LLC
Monthly Plant Fuel Consumption for Seymour Hills Wind Project, LLC
Seymour Hills Wind Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Seymour Hills Wind Project, LLC (62227) |
| Plant Address | TBD, Seymour, TX 76380 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 33.57824, -99.1921 |
| Generation Dates on File | Jun 2019 to Mar 2026 |
| Initial Operation Date | May 2019 |
| Annual Generation | 135.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator WTGS Details Operating May 2019
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 30.2 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 30.2 MW |
| Winter Capacity | 30.2 MW |
| Minimum Load | 2.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 12 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 12 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.5-120 |
| Design Wind Speed | 18.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 292 |
Seymour Hills Wind Project, LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Seymour Hills Wind Project, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #842 | Providence Heights Wind LLC | Tiskilwa, IL | 141.2 GWh |
| #843 | Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh |
| #844 | Elkhorn Ridge Wind LLC | Bloomfield, NE | 138.2 GWh |
| #845 | Butler Ridge | Mayville, WI | 137.9 GWh |
| #846 | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 137.7 GWh |
| #847 | FPL Energy North Dakota Wind I/II | Edgeley, ND | 136.7 GWh |
| #848 | OU Spirit Wind Farm | Woodward, OK | 136.4 GWh |
| #849 | Prairie Breeze III | Elgin, NE | 136.3 GWh |
| #850 | Passadumkeag Windpark LLC | Greenbush, ME | 136.2 GWh |
| #851 | Rollins Wind Project | Winn Village, ME | 136.1 GWh |
| #853 | Vineyard Wind 1 | Edgartown, MA | 134.2 GWh |
| #854 | Golden Hills North Wind Energy Center | Livermore, CA | 134.1 GWh |
| #855 | Spearville | Ford, KS | 133.6 GWh |
| #856 | Mojave 3/4/5 | Mojave, CA | 132.8 GWh |
| #857 | Community Wind South | Rushmore, MN | 132.3 GWh |
| #858 | Stony Creek Wind Farm LLC | Berlin, PA | 132.0 GWh |
| #859 | Macho Springs Power I | Deming, NM | 130.2 GWh |
| #860 | Northern Iowa Windpower II | Kensett, IA | 130.2 GWh |
| #861 | Sunray Wind I | Sunray, TX | 129.7 GWh |
| #862 | Beech Ridge II Wind Energy Center | Rupert, WV | 129.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seymour Hills Wind Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 28.6 mi |
| Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh | 35.6 mi |
| Diversion Wind Energy LLC | Seymour, TX | 738.1 GWh | 13.8 mi |
| El Campo Wind | Truscott, TX | 842.1 GWh | 32.5 mi |
| Electra Wind Farm | Oklaunion, TX | 828.7 GWh | 36.5 mi |
| Green Pastures Wind I | Seymour, TX | 277.5 GWh | 13.1 mi |
| Green Pastures Wind II | Seymour, TX | 291.1 GWh | 20.2 mi |
| Griffin Trail Wind | E Seymour, TX | 703.2 GWh | 22.6 mi |
| Horse Creek Wind Farm | Weinert, TX | 811.9 GWh | 25.5 mi |
| Inertia Wind Project | Haskell, TX | 1.3 TWh | 35.7 mi |
| King Creek Wind Farm 1, LLC | Throckmorton, TX | 582.2 GWh | 26.7 mi |
| King Creek Wind Farm 2, LLC | Throckmorton, TX | 673.1 GWh | 29.6 mi |
| Lockett Windfarm | Vernon, TX | 686.1 GWh | 34.4 mi |
| Millers Branch Solar | TX | 85.5 GWh | 33.6 mi |
| Montgomery Ranch Wind Farm, LLC | Crowell, TX | 643.9 GWh | 32.4 mi |
| TG East | Truscott, TX | 988.7 GWh | 29.6 mi |
| Trinity Hills | Olney, TX | 788.0 GWh | 30.8 mi |
| Western Trail Wind, LLC | Electra, TX | 1.1 TWh | 20.3 mi |
| Willow Springs Wind Farm | Weinert, TX | 864.3 GWh | 29.7 mi |
| Young Wind | Graham, TX | 1.6 TWh | 37.3 mi |