C D McIntosh Jr
3030 E. Lake Parker Dr, Lakeland, FL 33801Plant Summary Information
C D McIntosh Jr is ranked #28 out of 332 power plants in Florida in terms of total annual net electricity generation.
C D McIntosh Jr is comprised of 12 generators and generated 652.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | C D McIntosh Jr |
|---|---|
| Utility Name | City of Lakeland - (FL) |
| Location | Polk County, FL |
| Initial Operation Date | January 1970 |
| Last Update | May 2026 |
| Annual Generation | 2.4 TWh |
| Annual Consumption | 18.1 M MMBtu |
| Ranked #457 out of 13,081 Power Plants Nationwide | |
| Ranked #277 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #28 out of 332 Florida Power Plants | |
| Ranked #26 out of 82 Florida Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
Map of C D McIntosh Jr
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C D McIntosh Jr.
Monthly Net Generation for C D McIntosh Jr
Monthly Plant Fuel Consumption for C D McIntosh Jr
C D McIntosh Jr Details
| Summary Information | |
|---|---|
| Plant Name | C D McIntosh Jr (676) |
| Plant Address | 3030 E. Lake Parker Dr, Lakeland, FL 33801 |
| Utility | City of Lakeland - (FL) (10623) |
| Latitude, Longitude | 28.0801, -81.9229 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | January 1970 |
| Annual Generation | 2.4 TWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Florida Municipal Power Pool (FMPP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Lakeland - (FL) (10623) FL |
| Grid Voltage | 230.00 kV / 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
| Natural Gas Storage | No |
Generator IC1 Details Operating January 1970
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1970 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator IC2 Details Operating January 1970
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1970 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GT1 Details Operating May 1973
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 26.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1973 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 16 MW |
| Net Winter Capacity With Natural Gas | 19 MW |
| Net Summer Capacity With Oil | 16 MW |
| Net Winter Capacity With Oil | 19 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 5CT Details Operating May 2001
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 5CC |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 249 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 234 MW |
| Winter Capacity | 280 MW |
| Minimum Load | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2001 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5ST Details Operating October 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | 5CC |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 135 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 118 MW |
| Winter Capacity | 118 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating June 2020
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 130 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 119.5 MW |
| Winter Capacity | 124.5 MW |
| Minimum Load | 85 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 117 MW |
| Net Winter Capacity With Natural Gas | 122 MW |
| Net Summer Capacity With Oil | 112 MW |
| Net Winter Capacity With Oil | 115 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator IC6 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator IC7 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator IC8 Details Operating December 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator IC3 Details Operating January 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator IC4 Details Operating January 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator IC5 Details Operating January 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.83 MW |
| Winter Capacity | 19.83 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
C D McIntosh Jr Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| City of Lakeland - (FL) | 501 East Lemon Street, Lakeland, FL 33801 | Generator 3 | 60.00% |
| Orlando Utilities Comm | P O Box 3193, Orlando, FL 32802 | Generator 3 | 40.00% |
| Florida Renewable Partners | 700 Universe Boulevard, Juno Beach, FL 33408 | Generator PV6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #267 | ExxonMobil Baytown Turbine | Baytown, TX | 2.6 TWh |
| #268 | Sabine River Operations | Orange, TX | 2.5 TWh |
| #269 | Possum Point | Dumfries, VA | 2.5 TWh |
| #270 | Chalk Point Power | Aquasco, MD | 2.6 TWh |
| #271 | Gateway Generating Station | Antioch, CA | 2.5 TWh |
| #272 | Mankato Energy Center | Mankato, MN | 2.5 TWh |
| #273 | Jack Watson | Gulfport, MS | 2.5 TWh |
| #274 | James E. Rogers Energy Complex | Cliffside, NC | 5.6 TWh |
| #275 | Stanton Energy Center | Orlando, FL | 5.4 TWh |
| #276 | Gila River Power Block 2 | Gila Bend, AZ | 2.4 TWh |
| #278 | Emery Station | Clear Lake, IA | 2.4 TWh |
| #279 | Gila River Power Block 4 | Gila Bend, AZ | 2.4 TWh |
| #280 | Cedar Bayou 4 | Eldon, TX | 2.3 TWh |
| #281 | Hay Road | Wilmington, DE | 2.4 TWh |
| #282 | Mint Farm Generating Station | Longview, WA | 2.3 TWh |
| #283 | Chehalis Generating Facility | Chehalis, WA | 2.3 TWh |
| #284 | Desert Basin | Casa Grande, AZ | 2.3 TWh |
| #285 | Caithness Long Island Energy Center | Yaphank, NY | 2.3 TWh |
| #286 | O W Sommers | San Antonio, TX | 2.3 TWh |
| #287 | Sweeny Cogen Facility | Old Ocean, TX | 3.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding C D McIntosh Jr.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartow Solar Energy LLC | Bartow, FL | 12.5 GWh | 12.4 mi |
| Bonnie Mine Solar | Bartow, FL | 66.5 GWh | 13.7 mi |
| Cutrale Citrus Juices USA II | Auburndale, FL | 33.3 GWh | 7.8 mi |
| English Creek Solar | Plant City, FL | 53.3 GWh | 12.8 mi |
| Goldfinch | Lakeland, FL | 4.8 GWh | 9.9 mi |
| Juniper Solar (FL) | Zephyrhills, FL | 143.9 GWh | 15.8 mi |
| Lakeland Electric Co. (FL) - Airport II | Lakeland, FL | 2.2 GWh | 9.8 mi |
| Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.3 GWh | 9.9 mi |
| Larsen Memorial | Lakeland, FL | 159.2 GWh | 2.1 mi |
| Laurel Oaks Solar | Plant City, FL | 122.0 GWh | 13.8 mi |
| Legoland Solar | Winter Haven, FL | 2.2 GWh | 15.6 mi |
| LKL BLBD, LLC | Lakeland, FL | 9.8 GWh | 5.8 mi |
| Magnolia Solar | Mulberry, FL | 143.3 GWh | 13.6 mi |
| Mosaic Co Bartow Facility | Bartow, FL | 193.5 GWh | 11.9 mi |
| Mosaic New Wales Operations | Mulberry, FL | 356.3 GWh | 18.8 mi |
| Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh | 16.2 mi |
| Orange Cogeneration Facility | Bartow, FL | 374.6 GWh | 15.6 mi |
| Osprey Energy Center Power Plant | Auburndale, FL | 3.4 TWh | 7.2 mi |
| Peace Creek Solar | Bartow, FL | 95.2 GWh | 13.4 mi |
| Winston | Lakeland, FL | 497.0 MWh | 6.8 mi |