Echo River Solar
8690 Hogan Rd, Live Oak, FL 32060Plant Summary Information
Echo River Solar is ranked #63 out of 219 solar farms in Florida in terms of total annual net electricity generation.
Echo River Solar generated 32.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Echo River Solar |
|---|---|
| Utility Name | Florida Power & Light Co |
| Location | Suwannee County, FL |
| Initial Operation Date | April 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 161.2 GWh |
| Annual Consumption | 586.2 k MMBtu |
| Ranked #2,810 out of 12,613 Power Plants Nationwide | |
| Ranked #555 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #134 out of 325 Florida Power Plants | |
| Ranked #63 out of 219 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Echo River Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Echo River Solar.
Monthly Net Generation for Echo River Solar
Monthly Plant Fuel Consumption for Echo River Solar
Echo River Solar Details
| Summary Information | |
|---|---|
| Plant Name | Echo River Solar (62490) |
| Plant Address | 8690 Hogan Rd, Live Oak, FL 32060 |
| Utility | Florida Power & Light Co (6452) |
| Latitude, Longitude | 30.29621, -82.86433 |
| Generation Dates on File | Apr 2020 to Dec 2025 |
| Initial Operation Date | April 2020 |
| Annual Generation | 161.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Florida Power & Light Company (FPL) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator 1 Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 108 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 2 Details Operating December 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 30 MW |
| Summer Capacity | 30 MW |
| Winter Capacity | 30 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 75 |
|---|---|
| Maximum Charge Rate | 30 MW |
| Maximum Discharge Rate | 30 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 30 |
| Storage Enclosure Type | CS |
| Transmission And Distribution Deferral | Yes |
| System Peak Shaving | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 62490 |
| Direct Support Gen Id | 1 |
| Support T D Asset | Yes |
Echo River Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #545 | Assembly Solar III | Lennon, MI | 165.0 GWh |
| #546 | High Springs Solar Power Plant | High Springs, FL | 164.9 GWh |
| #547 | LaFayette Solar Farm | LaFayette, AL | 164.9 GWh |
| #548 | Rosamond South 1 | Rosamond, CA | 157.4 GWh |
| #549 | Apex Solar | Dillon, MT | 164.7 GWh |
| #550 | SR Cedar Springs, LLC | Blakely, GA | 164.2 GWh |
| #551 | Bullfrog Creek Solar | Wimauma, FL | 163.6 GWh |
| #552 | Bay Trail Solar Power Plant | Crystal River, FL | 163.5 GWh |
| #553 | Hobnail Solar | Hephzibah, GA | 163.4 GWh |
| #554 | Aspen Road Solar | Spring Run, PA | 163.0 GWh |
| #556 | Water Strider Solar | Nathalie, VA | 162.9 GWh |
| #557 | Cabin Creek Solar, LLC | Biscoe, NC | 162.8 GWh |
| #558 | Terrill Creek | Green Cove Springs, FL | 162.5 GWh |
| #559 | Redlands | TBD, FL | 162.5 GWh |
| #560 | Lily Solar | Martin, SC | 162.0 GWh |
| #561 | Columbia Solar Power Plant | Fort White, FL | 161.3 GWh |
| #562 | Wilkinson Solar LLC | Pantego, NC | 161.2 GWh |
| #563 | Misenheimer Solar LLC | Gold Hill, NC | 161.0 GWh |
| #564 | Pecan Tree | Defuniak Springs, FL | 160.9 GWh |
| #565 | Thomas Creek | Callahan, FL | 160.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Echo River Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Columbia County Solar | Fort White, FL | 194.7 GWh | 29.6 mi |
| Columbia Solar Power Plant | Fort White, FL | 161.3 GWh | 30.3 mi |
| County Line Renewable Energy Center | High Springs, FL | 186.6 GWh | 35.3 mi |
| Falmouth Renewable Energy Center | Live Oak, FL | 181.0 GWh | 17.7 mi |
| Hamilton Solar Power Plant | Jasper, FL | 182.5 GWh | 21.8 mi |
| High Springs Solar Power Plant | High Springs, FL | 164.9 GWh | 36.2 mi |
| Hildreth Solar Power Plant | O'Brien, FL | 184.7 GWh | 23 mi |
| Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh | 32.5 mi |
| Northern Preserve Solar | Glen St. Mary, FL | 119.1 GWh | 38.2 mi |
| Norton Creek | TBD, FL | 187.1 GWh | 29.3 mi |
| PCA-Valdosta Mill | Valdosta, GA | 322.6 GWh | 37.9 mi |
| Price Creek | TBD, FL | 790.0 MWh | 20.5 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 156.0 GWh | 29.8 mi |
| Sundance Renewable Energy Center | Lee, FL | 88.1 GWh | 25.8 mi |
| Sunshine Gateway Solar Energy Center | Lake City, FL | 134.9 GWh | 6.8 mi |
| Suwannee River | Live Oak, FL | 76.0 GWh | 19.7 mi |
| Suwannee Solar Facility | Live Oak, FL | 16.2 GWh | 19.3 mi |
| Swift Creek Chemical Complex | White Springs, FL | 85.2 GWh | 10.8 mi |
| Twin Rivers Solar Power Plant | Jasper, FL | 166.0 GWh | 13.3 mi |
| Winquepin Renewable Energy Center | Lee, FL | 171.5 GWh | 25.9 mi |