Brevard
2250 Adamson Road, Cocoa, FL 32926Plant Summary Information
Brevard is ranked #3 out of 13 landfill gas power plants in Florida in terms of total annual net electricity generation.
Brevard is comprised of 4 generators and generated 9.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Brevard |
---|---|
Utility Name | NextEra Renewable Fuels, LLC |
Location | Brevard County, FL |
Initial Operation Date | May 2008 |
Last Update | Dec 2024 |
Annual Generation | 37.2 GWh |
Annual Consumption | 428.4 k MMBtu |
Ranked #4,363 out of 12,288 Power Plants Nationwide | |
Ranked #57 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #242 out of 308 Florida Power Plants | |
Ranked #3 out of 13 Florida Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
Brevard Energy, LLC (2017 to 2020) EPP Renewable Energy (2021 to 2023) NextEra Renewable Fuels, LLC (2024 to 2024) |
Map of Brevard
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brevard.
Monthly Net Generation for Brevard
Brevard Details
Summary Information | |
---|---|
Plant Name | Brevard (61777) |
Plant Address | 2250 Adamson Road, Cocoa, FL 32926 |
Utility | NextEra Renewable Fuels, LLC (57249) |
Latitude, Longitude | 28.39265, -80.82867 |
Generation Dates on File | Jan 2017 to Dec 2024 |
Initial Operation Date | May 2008 |
Annual Generation | 37.2 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF07-390 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator ENG1 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ENG2 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ENG3 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator ENG6 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Brevard Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#47 | Green Knight Energy Center | Pen Argyl, PA | 41.3 GWh |
#48 | Brunswick Landfill Gas | Lawrenceville, VA | 43.4 GWh |
#49 | Colonie LFGTE Facility | Cohoes, NY | 40.9 GWh |
#50 | JED Solid Waste Mgmt Renewable Energy | St. Cloud, FL | 40.6 GWh |
#51 | MM West Covina | West Covina, CA | 39.9 GWh |
#52 | Altamont Gas Recovery | Livermore, CA | 38.9 GWh |
#53 | Waste Management Arden LFGTE | Washington, PA | 38.5 GWh |
#54 | Coffin Butte | Corvallis, OR | 38.4 GWh |
#55 | West Camden | Camden, TN | 38.1 GWh |
#56 | Lakeview Gas Recovery | Erie, PA | 37.7 GWh |
#58 | UNH 7.9 MW Plant | Durham, NH | 49.5 GWh |
#59 | Georgia LFG Pine Ridge Plant | Griffin, GA | 37.1 GWh |
#60 | Deertrack Park Gas Recovery | Watertown, WI | 37.0 GWh |
#61 | Metro Gas Recovery | Franklin, WI | 37.0 GWh |
#62 | Coopersville | Coopersville, MI | 36.9 GWh |
#63 | Trans-Jordan Generating Station | South Jordan, UT | 36.5 GWh |
#64 | Waste Management Bethel LFGTE | Hampton, VA | 36.5 GWh |
#65 | Calabasas Gas to Energy Facility | Agoura, CA | 36.3 GWh |
#66 | Ridgeview | Whitelaw, WI | 35.6 GWh |
#67 | Springhill Gas Recovery Plant | Campbellton, FL | 35.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brevard.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ACE-Stanton A PV | Orlando, FL | 7.8 GWh | 21.9 mi |
ACE-Stanton PV | Orlando, FL | 9.2 GWh | 22.2 mi |
Cape Canaveral | Cocoa, FL | 6.5 TWh | 6.6 mi |
Curtis H Stanton Energy Center | Orlando, FL | 3.8 TWh | 21.6 mi |
Discovery Solar Center | Merrit Island, FL | 135.1 GWh | 13.1 mi |
Harmony Florida Solar II | Kissimmee, FL | 52.3 GWh | 22 mi |
Harmony Solar | St. Cloud, FL | 172.4 GWh | 23.6 mi |
Indian River Plant | Titusville, FL | 5.7 GWh | 7.5 mi |
JED Solid Waste Mgmt Renewable Energy | St. Cloud, FL | 40.6 GWh | 28 mi |
Lockheed Martin Solar | Orlando, FL | 3.2 GWh | 25.6 mi |
Oleander Power Project LP | Cocoa, FL | 488.9 GWh | 2.8 mi |
Orlando Cogen LP | Orlando, FL | 704.8 GWh | 35.6 mi |
Osceola Generating Station (FL) | St. Cloud, FL | 623.0 MWh | 24.5 mi |
Osceola Solar Facility | Kenansville, FL | 4.1 GWh | 34.2 mi |
RP-Orlando, LLC | Orlando, FL | 8.2 GWh | 22.5 mi |
Seminole Energy | Geneva, FL | 13.0 GWh | 31.7 mi |
Space Coast Next Gen Solar Energy | Merritt Island, FL | 8.6 GWh | 10.1 mi |
Stanton Energy Center | Orlando, FL | 4.1 TWh | 21.5 mi |
Storey Bend Solar | Saint Cloud, FL | 52.8 GWh | 17.2 mi |
Taylor Creek Solar | Orlando, FL | 167.7 GWh | 15.4 mi |