Anhinga Solar Energy Center
1021 Leno Road, Green Cove Springs, FL 32043Plant Summary Information
Anhinga Solar Energy Center is ranked #132 out of 220 solar farms in Florida in terms of total annual net electricity generation.
Anhinga Solar Energy Center generated 28.7 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Anhinga Solar Energy Center |
|---|---|
| Utility Name | Florida Power & Light Co |
| Location | Clay County, FL |
| Initial Operation Date | January 2023 |
| Last Update | Mar 2026 |
| Annual Generation | 129.5 GWh |
| Annual Consumption | 484.8 k MMBtu |
| Ranked #3,138 out of 12,332 Power Plants Nationwide | |
| Ranked #739 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #202 out of 325 Florida Power Plants | |
| Ranked #132 out of 220 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Anhinga Solar Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Anhinga Solar Energy Center.
Monthly Net Generation for Anhinga Solar Energy Center
Monthly Plant Fuel Consumption for Anhinga Solar Energy Center
Anhinga Solar Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Anhinga Solar Energy Center (65431) |
| Plant Address | 1021 Leno Road, Green Cove Springs, FL 32043 |
| Utility | Florida Power & Light Co (6452) |
| Latitude, Longitude | 29.88213, -81.67618 |
| Generation Dates on File | Jan 2023 to Mar 2026 |
| Initial Operation Date | January 2023 |
| Annual Generation | 129.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Florida Power & Light Company (FPL) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating January 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 83.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Anhinga Solar Energy Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #729 | Rutherford Farm | Forest City, NC | 132.8 GWh |
| #730 | Wheatridge Hybrid | Morrow, OR | 654.8 GWh |
| #731 | Interstate Solar Energy Center | Ft. Pierce, FL | 132.4 GWh |
| #732 | North Star Solar | Mendota, CA | 132.4 GWh |
| #733 | First City Solar Energy Center | McDavid, FL | 131.5 GWh |
| #734 | Azalea Springs Solar Park | Lufkin, TX | 131.3 GWh |
| #735 | Jicarilla Solar 2 | Dulce, NM | 131.2 GWh |
| #736 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 131.2 GWh |
| #737 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 129.9 GWh |
| #738 | Desper Solar | Louisa, VA | 129.6 GWh |
| #740 | Granite Mountain Solar West, LLC | Cedar City, UT | 129.4 GWh |
| #741 | Crawfish River | Jefferson, WI | 129.1 GWh |
| #742 | Foxglove Solar | Middletown, VA | 129.1 GWh |
| #743 | Sweetbay Solar Center | North of Indiantown, FL | 129.0 GWh |
| #744 | Blevins Solar & Storage | TX | 124.0 GWh |
| #745 | Hecate Energy Beacon Solar 1 | Cantil, CA | 128.9 GWh |
| #746 | Twin Lakes | Interlachen, FL | 128.9 GWh |
| #747 | Egret Solar Center | Glen St. Mary, FL | 128.7 GWh |
| #748 | Magnolia Springs Solar Center | Green Cove Springs, FL | 128.5 GWh |
| #749 | Innovative Solar 46 | Hope Mills, NC | 128.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Anhinga Solar Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Baptist Medical Center | Jacksonville, FL | 18.9 GWh | 29.9 mi |
| Brandy Branch | Baldwin, FL | 5.0 TWh | 34.4 mi |
| Coral Farms Solar Energy Center | Florahome, FL | 125.4 GWh | 15.8 mi |
| FPL Etonia Creek | Palatka, FL | 166.1 GWh | 10 mi |
| Georges Lake | TBD, FL | 185.0 GWh | 10 mi |
| Georgia-Pacific Palatka Operations | Palatka, FL | 356.7 GWh | 13.9 mi |
| Greenland Energy Center | Jacksonville, FL | 770.9 GWh | 21.3 mi |
| Hecate Energy Blair Road LLC | Jacksonville, FL | 5.8 GWh | 29.5 mi |
| Horizon Solar Energy Center | Hawthorne, FL | 139.3 GWh | 27.4 mi |
| IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.3 GWh | 26 mi |
| J D Kennedy | Jacksonville, FL | 179.8 GWh | 33.5 mi |
| Magnolia Springs Solar Center | Green Cove Springs, FL | 128.5 GWh | 1.5 mi |
| Old Plank Road Solar Farm, LLC | Jacksonville, FL | 5.5 GWh | 32.7 mi |
| Rice Creek | Putnam, FL | 175.6 GWh | 9.8 mi |
| Seminole (FL) | Palatka, FL | 10.1 TWh | 10.6 mi |
| Terrill Creek | Green Cove Springs, FL | 163.1 GWh | 5.2 mi |
| Trail Ridge Landfill Gas Recovery | Baldwin, FL | 26.4 GWh | 32.4 mi |
| Trailside Solar Center | Elkton, FL | 135.7 GWh | 16.6 mi |
| Tupelo Solar | San Mateo, FL | 190.8 GWh | 21.2 mi |
| Twin Lakes | Interlachen, FL | 128.9 GWh | 21.2 mi |