Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| University of Illinois Cogen Facility | University of Illinois | Chicago, IL | PJM Interconnection, LLC (PJM) | 110.2 GWh | Mar 1993 | Aug 2026 | Natural Gas : 99.9% |
| Ingredion Incorporated | Ingredion Inc - Illinois | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 186.3 GWh | Apr 1991 | Dec 2025 | Natural Gas |
| Bayville Central Facility | Ocean County Utilities Auth - (NJ) | Bayville, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Aug 1988 | Aug 2026 | Other Biomass Gas : 63.5% Distillate Fuel Oil : 14.2% Solar : 13.1% Natural Gas : 9.2% |
| Delaware City Plant | Delaware City Refining Company LLC | Delaware City, DE | PJM Interconnection, LLC (PJM) | 994.3 GWh | Sep 1956 | Aug 2026 | Natural Gas : 84.7% Other Gas : 15.3% |
| Wheelabrator Falls | Wheelabrator Environmental Systems | Morrisville, PA | PJM Interconnection, LLC (PJM) | 300.2 GWh | Apr 1994 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Conemaugh Hydro Plant | Pennsylvania Renewable Resources | Saltsburg, PA | PJM Interconnection, LLC (PJM) | 43.3 GWh | Jan 1989 | Dec 2025 | Water |
| St Nicholas Cogen Project | Schuylkill Energy Resource Inc | Shenandoah, PA | PJM Interconnection, LLC (PJM) | 657.9 GWh | Aug 1990 | Aug 2026 | Waste/Other Coal : 99.6% |
| Johnsonburg Mill | Domtar LLC | Johnsonburg, PA | PJM Interconnection, LLC (PJM) | 145.0 GWh | Jan 1993 | Dec 2025 | Black Liquor : 52.9% Natural Gas : 47.1% |
| NAEA Lakewood LLC | Essential Power Operating Company, LLC | Lakewood, NJ | PJM Interconnection, LLC (PJM) | 239.4 GWh | Mar 1994 | Dec 2025 | Natural Gas : 94.4% Distillate Fuel Oil : 5.6% |
| Schoolfield Dam | Eagle Creek Renewable Energy, LLC | Danville, VA | PJM Interconnection, LLC (PJM) | 7.1 GWh | Sep 1990 | Aug 2026 | Water |
| Woodland Landfill Gas Recovery | WM Illinois Renewable Energy LLC | South Elgin, IL | PJM Interconnection, LLC (PJM) | 12.9 GWh | Apr 1992 | Dec 2025 | Landfill Gas |
| International Paper Franklin Mill | GFC - Franklin | Franklin, VA | PJM Interconnection, LLC (PJM) | 277.3 GWh | Oct 1977 | Aug 2026 | Black Liquor : 87.9% Natural Gas : 12.1% |
| West Point (PA) | Merck & Co Inc-West Point | West Point, PA | PJM Interconnection, LLC (PJM) | 265.3 GWh | Dec 1971 | Dec 2025 | Natural Gas |
| Elkton | Merck & Co Inc | Elkton, VA | PJM Interconnection, LLC (PJM) | 7.4 GWh | May 1982 | Dec 2025 | Natural Gas : 99.9% |
| I 95 Landfill Phase II | NextEra Renewable Fuels, LLC | Lorton, VA | PJM Interconnection, LLC (PJM) | 12.9 GWh | Feb 1993 | Dec 2025 | Landfill Gas |
| MRP Rocky Road LLC | Lincoln Operating Services, LLC | East Dundee, IL | PJM Interconnection, LLC (PJM) | 33.8 GWh | May 1999 | Dec 2025 | Natural Gas |
| Mon Valley Works | United States Steel-Mon Valley | Dravosburg, PA | PJM Interconnection, LLC (PJM) | 483.2 GWh | May 1943 | Dec 2025 | Blast Furnace Gas : 92.7% Other Gas : 7.3% |
| Bluegrass Generating Station | East Kentucky Power Coop, Inc | LaGrange, KY | PJM Interconnection, LLC (PJM) | 207.3 GWh | May 2002 | Dec 2025 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Galion Generating Station | American Mun Power-Ohio, Inc | Galion, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Napoleon Peaking Station | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | May 2000 | Dec 2025 | Natural Gas |
| Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | PJM Interconnection, LLC (PJM) | 145.5 GWh | Sep 1987 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Lancaster County Resource Recovery | Covanta Lancaster Inc | Brainbridge, PA | PJM Interconnection, LLC (PJM) | 172.9 GWh | Nov 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.8% Biogenic Municipal Solid Waste : 44.9% |
| Kendall County Generation Facility | Dynegy Kendall Energy LLC | Minooka, IL | PJM Interconnection, LLC (PJM) | 5.4 TWh | Feb 2002 | Aug 2026 | Natural Gas |
| Madison | Duke Energy Indiana, LLC | Trenton, OH | PJM Interconnection, LLC (PJM) | 681.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Bowling Green Generating Station | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | May 2000 | Dec 2025 | Natural Gas |
| Lakeview Gas Recovery | WM Renewable Energy LLC | Erie, PA | PJM Interconnection, LLC (PJM) | 32.6 GWh | Apr 1997 | Dec 2025 | Landfill Gas |
| Wheelabrator Gloucester LP | Wheelabrator Environmental Systems | Westville, NJ | PJM Interconnection, LLC (PJM) | 81.2 GWh | Dec 1989 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| MPEA Energy Center | Metropolitan Pier and Exposition Auth | Chicago, IL | PJM Interconnection, LLC (PJM) | 4.0 MWh | Dec 1996 | Dec 2025 | Distillate Fuel Oil |
| Northampton Generating Company LP | EIF Northampton GP, LLC | Northampton, PA | PJM Interconnection, LLC (PJM) | 349.9 GWh | Jul 1995 | Aug 2026 | Waste/Other Coal : 93.0% Tire-derived Fuels : 5.1% Waste/Other Oil : 1.5% |
| Allegheny No. 5 Hydro Station | Eagle Creek Renewable Energy, LLC | Schenley, PA | PJM Interconnection, LLC (PJM) | 35.4 GWh | Sep 1988 | Dec 2025 | Water |
| Allegheny No 6 Hydro Station | Eagle Creek Renewable Energy, LLC | Ford City, PA | PJM Interconnection, LLC (PJM) | 35.6 GWh | Oct 1988 | Dec 2025 | Water |
| Allegheny Hydro No 9 | Allegheny Hydro LP | Cowansville, PA | PJM Interconnection, LLC (PJM) | 86.4 GWh | Nov 1990 | Dec 2025 | Water |
| Allegheny Hydro No 8 | Allegheny Hydro LP | Adrian, PA | PJM Interconnection, LLC (PJM) | 79.6 GWh | Nov 1990 | Dec 2025 | Water |
| Crete Energy Venture LLC | Crete Energy Venture LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 59.8 GWh | Apr 2002 | Dec 2025 | Natural Gas |
| Hopewell Mill | RockTenn-Hopewell | Hopewell, VA | PJM Interconnection, LLC (PJM) | 287.5 GWh | Nov 1980 | Aug 2026 | Black Liquor : 47.9% Wood/Wood Waste Solids : 34.8% Natural Gas : 16.7% Bituminous Coal : 0.6% |
| Nelson Energy Center | Invenergy Services LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 3.0 TWh | Apr 2015 | Dec 2025 | Natural Gas |
| Cordova Energy | Cordova Energy Co LLC | Cordova, IL | PJM Interconnection, LLC (PJM) | 1.1 TWh | May 2001 | Dec 2025 | Natural Gas |
| Ontelaunee Energy Center | Ontelaunee Energy Center | Reading, PA | PJM Interconnection, LLC (PJM) | 3.7 TWh | Apr 2002 | Aug 2026 | Natural Gas |
| Handsome Lake Energy LLC | Handsome Lake Energy LLC | Kennerdell, PA | PJM Interconnection, LLC (PJM) | 163.6 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Panther Creek Energy Facility | Panther Creek Power Operating, LLC | Nesquehoning, PA | PJM Interconnection, LLC (PJM) | 384.0 GWh | Jun 1992 | Nov 2025 | Waste/Other Coal : 98.9% Distillate Fuel Oil : 1.0% |
| Springdale 1 & 2 | Springdale Energy LLC | Springdale, PA | PJM Interconnection, LLC (PJM) | 147.3 GWh | Nov 1999 | Dec 2025 | Natural Gas |
| University Park South | University Park Energy LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 151.4 GWh | May 2001 | Dec 2025 | Natural Gas |
| Riverside Generating LLC | Riverside Generating Co LLC | Catlettsburg, KY | PJM Interconnection, LLC (PJM) | 769.6 GWh | Jun 2001 | Aug 2026 | Natural Gas |
| Elwood Energy LLC | Elwood Energy, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 539.0 GWh | Jun 1999 | Aug 2026 | Natural Gas |
| Morris Cogeneration LLC | Morris Cogeneration LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 613.1 GWh | Oct 1998 | Aug 2026 | Natural Gas |
| Lincoln Generating Facility | Lincoln Generating Facility LLC | Manhattan, IL | PJM Interconnection, LLC (PJM) | 8.2 GWh | May 2000 | Oct 2025 | Natural Gas |
| Greenville Electric Generating Station | Buckeye Power, Inc | Greenville, OH | PJM Interconnection, LLC (PJM) | 82.2 GWh | May 2000 | Dec 2025 | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
| Liberty Electric Power Plant | Liberty Electric Power LLC | Eddystone, PA | PJM Interconnection, LLC (PJM) | 4.1 TWh | Apr 2002 | Aug 2026 | Natural Gas |
| Big Sandy Peaker Plant | Middle River Power II, LLC | Kenona, WV | PJM Interconnection, LLC (PJM) | 329.8 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Covington Facility | WestRock Corp | Covington, VA | PJM Interconnection, LLC (PJM) | 780.6 GWh | Dec 1950 | Aug 2026 | Black Liquor : 45.0% Natural Gas : 22.7% Wood/Wood Waste Solids : 20.5% Bituminous Coal : 11.0% Residual Fuel Oil : 0.6% |
| Montgomery County Resource Recovery | Covanta Montgomery, Inc. | Dickerson, MD | PJM Interconnection, LLC (PJM) | 234.7 GWh | Apr 1995 | Aug 2026 | Non-biogenic Municipal Solid Waste : 53.7% Biogenic Municipal Solid Waste : 44.0% Natural Gas : 2.3% |
| Ocean County Landfill | NextEra Renewable Fuels, LLC | Manchester, NJ | PJM Interconnection, LLC (PJM) | 64.3 GWh | Jan 1997 | Dec 2024 | Landfill Gas |
| Red Oak Power LLC | Red Oak Operating Services LLC | Sayreville, NJ | PJM Interconnection, LLC (PJM) | 2.9 TWh | Feb 2002 | Aug 2026 | Natural Gas |
| Ceredo Generating Station | Appalachian Power Co | Huntington, WV | PJM Interconnection, LLC (PJM) | 892.1 GWh | May 2001 | Aug 2026 | Natural Gas |
| Sauder Power Plant | Sauder Woodworking Co | Archbold, OH | PJM Interconnection, LLC (PJM) | 7.4 GWh | Sep 1993 | Apr 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| Dixon Hydroelectric Dam | Eagle Creek Renewable Energy, LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 12.5 GWh | May 1925 | Dec 2025 | Water |
| Aurora | Aurora Generation LLC | Aurora, IL | PJM Interconnection, LLC (PJM) | 404.0 GWh | Apr 2001 | Aug 2026 | Natural Gas |
| Scrubgrass Reclamation CO. LP. | Scrubgrass Reclamation CO. LP. | Kennerdell, PA | PJM Interconnection, LLC (PJM) | 438.9 GWh | May 1993 | Dec 2025 | Waste/Other Coal : 99.7% |
| Presence Saint Mary of Nazareth Hospital | Presence Health | Chicago, IL | PJM Interconnection, LLC (PJM) | 980.0 kWh | Jul 1993 | Dec 2025 | Natural Gas |
| Wolf Hills Energy | Middle River Power II, LLC | Bristol, VA | PJM Interconnection, LLC (PJM) | 287.0 GWh | Apr 2001 | Dec 2025 | Natural Gas |
| Gordonsville Energy LP | Virginia Electric & Power Co | Gordonsville, VA | PJM Interconnection, LLC (PJM) | 1.4 TWh | Feb 1994 | Dec 2025 | Natural Gas : 99.9% |
| Doswell Energy Center | Doswell Ltd Partnership | Ashland, VA | PJM Interconnection, LLC (PJM) | 5.1 TWh | Oct 1991 | Aug 2026 | Natural Gas : 98.4% Distillate Fuel Oil : 1.6% |
| Cox Waste to Energy | Cox Companies, LLC | Campbellsville, KY | PJM Interconnection, LLC (PJM) | 9.6 GWh | Dec 1994 | Dec 2025 | Wood/Wood Waste Solids |
| Yough Hydro Power | D/R Hydro Co | Confluence, PA | PJM Interconnection, LLC (PJM) | 38.2 GWh | Nov 1989 | Dec 2025 | Water |
| Darby Power, LLC | Darby Power, LLC | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 543.9 GWh | Apr 2001 | Dec 2025 | Natural Gas : 98.7% Distillate Fuel Oil : 1.3% |
| Livingston Generating Facility | Hoosier Energy R E C, Inc | Pontiac, IL | PJM Interconnection, LLC (PJM) | 50.1 GWh | Nov 1999 | Dec 2025 | Landfill Gas |
| Greene Valley Gas Recovery | WM Illinois Renewable Energy LLC | Naperville, IL | PJM Interconnection, LLC (PJM) | 22.4 GWh | Apr 1996 | Dec 2025 | Landfill Gas |
| NRG Rockford I | Rockford Generation LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 106.5 GWh | May 2000 | Dec 2025 | Natural Gas |
| Toledo Ref Power Recovery Train | Toledo Refining Company | Oregon, OH | PJM Interconnection, LLC (PJM) | 89.2 MWh | May 1986 | Jun 2026 | Petroleum Coke |
| Clairton Works | United States Steel- Clairton | Clairton, PA | PJM Interconnection, LLC (PJM) | 124.1 GWh | Dec 1954 | Dec 2025 | Other Gas : 84.6% Natural Gas : 15.4% |
| Union County Resource Recovery | Reworld Union (NJ), LLC | Rahway, NJ | PJM Interconnection, LLC (PJM) | 290.5 GWh | Jan 1994 | Aug 2026 | Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0% |
| Lee Energy Facility | Lee County Generating Station - (IL) | Dixon, IL | PJM Interconnection, LLC (PJM) | 65.2 GWh | Apr 2001 | Dec 2025 | Natural Gas |
| Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | PJM Interconnection, LLC (PJM) | 653.3 GWh | Feb 1990 | Aug 2026 | Non-biogenic Municipal Solid Waste : 54.1% Biogenic Municipal Solid Waste : 44.3% Natural Gas : 1.7% |
| Waste Management Arden LFGTE | WM Renewable Energy LLC | Washington, PA | PJM Interconnection, LLC (PJM) | 36.4 GWh | Jan 2009 | Dec 2025 | Landfill Gas |
| Minonk Wind Farm | Algonquin Power Co | Minonk, IL | PJM Interconnection, LLC (PJM) | 622.9 GWh | Oct 2012 | Dec 2025 | Wind |
| Roth Rock North Wind Farm, LLC | Roth Rock Wind Farm LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 25.7 GWh | Jul 2011 | Aug 2026 | Wind |
| RMQ 1 and 2 | RMQ Ventures LLC | Rocky Mount, NC | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2008 | Dec 2025 | Solar |
| West Deptford Energy Station | West Deptford Energy LLC | West Deptford, NJ | PJM Interconnection, LLC (PJM) | 1.4 TWh | Sep 2014 | Aug 2026 | Natural Gas |
| CPV St Charles Energy Center | CPV Maryland LLC | Waldorf, MD | PJM Interconnection, LLC (PJM) | 3.9 TWh | Jan 2017 | Aug 2026 | Natural Gas |
| WEA Texas Bayonne | Public Service Elec & Gas Co | Bayonne, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2010 | Dec 2025 | Solar |
| Roth Rock Wind Farm LLC | Roth Rock Wind Farm LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 102.8 GWh | Jul 2011 | Aug 2026 | Wind |
| Crayola Solar Project | UGI Energy Services, LLC | Easton, PA | PJM Interconnection, LLC (PJM) | 996.0 MWh | Apr 2010 | Aug 2026 | Solar |
| Haverhill North Cogeneration Facility | SunCoke Energy, Inc. | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 320.2 GWh | Nov 2008 | Dec 2025 | Other Gas : 85.7% Natural Gas : 14.3% |
| Lanchester Generating Station | Energy Developments, Inc d/b/a EDL | Narvon, PA | PJM Interconnection, LLC (PJM) | 13.4 GWh | Nov 2006 | Dec 2025 | Landfill Gas |
| Yardville Solar Farm | Public Service Elec & Gas Co | Hamilton, NJ | PJM Interconnection, LLC (PJM) | 5.3 GWh | Nov 2010 | Dec 2025 | Solar |
| Linden Solar Farm | Public Service Elec & Gas Co | Linden, NJ | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2010 | Dec 2025 | Solar |
| Trenton Solar Farm | Public Service Elec & Gas Co | Trenton, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2010 | Dec 2025 | Solar |
| Pioneer Crossing Energy, LLC | Pioneer Crossing Energy LLC | Birdsboro, PA | PJM Interconnection, LLC (PJM) | 38.0 GWh | Sep 2008 | Dec 2025 | Landfill Gas |
| Grand Ridge Wind Energy Center | Invenergy Services LLC | Marseilles, IL | PJM Interconnection, LLC (PJM) | 447.2 GWh | Sep 2008 | Dec 2025 | Wind |
| Stony Creek Wind Farm LLC | RWE Clean Energy | Berlin, PA | PJM Interconnection, LLC (PJM) | 144.2 GWh | Oct 2009 | Dec 2025 | Wind |
| Criterion | Criterion Power Partners LLC | Oakland, MD | PJM Interconnection, LLC (PJM) | 272.3 GWh | Nov 2010 | Aug 2026 | Wind |
| FPL Energy Illinois Wind LLC Hybrid | FPL Energy Illinois Wind LLC | Shabbona, IL | PJM Interconnection, LLC (PJM) | 615.3 GWh | Nov 2009 | Aug 2026 | Wind |
| Kent County Wastewater Treatment Solar | Kent County Levy Court Dept of Pub Work | Milford, DE | PJM Interconnection, LLC (PJM) | 841.0 MWh | Feb 2011 | Dec 2025 | Solar |
| Dover Sun Park | White Oak Solar Energy LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 13.3 GWh | Jun 2011 | Aug 2026 | Solar |
| Silver Lake Solar Farm | Public Service Elec & Gas Co | Edison, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | Sep 2010 | Dec 2025 | Solar |
| Chestnut Flats Wind Farm | UPC Power Solutions | Altoona, PA | PJM Interconnection, LLC (PJM) | 90.3 GWh | Nov 2011 | Dec 2025 | Wind |
| MF Mesa Lane LLC | MF Mesa Lane LLC | Morrisville, PA | PJM Interconnection, LLC (PJM) | 3.4 GWh | Oct 2008 | Dec 2025 | Solar |
| Garrison Energy Center LLC | Garrison Energy Center LLC | Dover, DE | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 2015 | Aug 2026 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| PA Solar Park | RWE Clean Energy | Nesquehoning, PA | PJM Interconnection, LLC (PJM) | 8.7 GWh | Sep 2012 | Aug 2026 | Solar |
| Willow Island Hydroelectric Plant | American Mun Power-Ohio, Inc | Willow Island, WV | PJM Interconnection, LLC (PJM) | 198.3 GWh | Dec 2015 | Dec 2025 | Water |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |