Silver Lake Solar Farm
410 Silver Lake Avenue, Edison, NJ 8817Plant Summary Information
Silver Lake Solar Farm is ranked #184 out of 327 solar farms in New Jersey in terms of total annual net electricity generation.
Silver Lake Solar Farm generated 429.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Silver Lake Solar Farm |
|---|---|
| Utility Name | Public Service Elec & Gas Co |
| Location | Middlesex County, NJ |
| Initial Operation Date | October 2010 |
| Last Update | Dec 2025 |
| Annual Generation | 2.5 GWh |
| Annual Consumption | 8.9 k MMBtu |
| Ranked #10,310 out of 13,081 Power Plants Nationwide | |
| Ranked #5,245 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #243 out of 390 New Jersey Power Plants | |
| Ranked #184 out of 327 New Jersey Solar Power Plants | |
| Fuel Types | Solar |
Map of Silver Lake Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Silver Lake Solar Farm.
Monthly Net Generation for Silver Lake Solar Farm
Monthly Plant Fuel Consumption for Silver Lake Solar Farm
Silver Lake Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | Silver Lake Solar Farm (57341) |
| Plant Address | 410 Silver Lake Avenue, Edison, NJ 8817 |
| Utility | Public Service Elec & Gas Co (15477) |
| Latitude, Longitude | 40.4948, -74.39951 |
| Generation Dates on File | Oct 2010 to Dec 2025 |
| Initial Operation Date | October 2010 |
| Annual Generation | 2.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
| Grid Voltage | 13.00 kV |
| Energy Storage | No |
Generator SILV Details Operating October 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 106856867 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 106856867 |
| Nameplate Capacity | 1.7 MW |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2010 |
|---|---|
| Planned Retirement | December 2030 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Silver Lake Solar Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5235 | North Carolina Solar Bethea I | Laurinburg, NC | 2.5 GWh |
| #5236 | Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh |
| #5237 | Stow PV | Stow, MA | 2.5 GWh |
| #5238 | TX Fort Worth 5200 Gold Spike Drive | Fort Worth, TX | 2.5 GWh |
| #5239 | Ludlow Site 72 - Conti | Ludlow, MA | 2.5 GWh |
| #5240 | Tejon Castac Water District Solar | Arvin, CA | 2.5 GWh |
| #5241 | Waihonu South Solar | Mililani, HI | 2.5 GWh |
| #5242 | SEPV 1 | Palmdale, CA | 2.5 GWh |
| #5243 | Monroeville Solar | Monroeville, OH | 2.5 GWh |
| #5244 | Timonium Fairgrounds | Timonium, MD | 2.5 GWh |
| #5246 | Onondaga County- Clearwater | Oswego, NY | 2.5 GWh |
| #5247 | Chambers 3 - Lewis County | Lowville, NY | 2.5 GWh |
| #5248 | Kettleman Solar Project | Lodi, CA | 2.5 GWh |
| #5249 | ISU Customer Hosted 1MW Solar Project | Ames, IA | 2.5 GWh |
| #5250 | 46 Meadowlands Parkway | Secaucus, NJ | 2.5 GWh |
| #5251 | Kings Park Solar II | Kings Park, NY | 2.5 GWh |
| #5252 | DG Florham Park Solar LLC | Florham Park, NJ | 2.5 GWh |
| #5253 | East Amwell | East Amwell Twp, NJ | 2.5 GWh |
| #5254 | Barnhill Road Solar, LLC | Elizabeth City, NC | 2.5 GWh |
| #5255 | Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Silver Lake Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 145 Talmadge Solar | Edison, NJ | 4.6 GWh | 2.9 mi |
| 180 Raritan Solar | Edison, NJ | 2.2 GWh | 3.5 mi |
| Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 55.9 GWh | 2.8 mi |
| DG Iron Mountain | Edison, NJ | 6.1 GWh | 3.3 mi |
| Edison 0203 Community Solar - SLNNJ203 | Edison, NJ | 469.0 MWh | 2.2 mi |
| Edison 0308 Solar | Edison, NJ | 4.6 GWh | 2.5 mi |
| Edison 7205 Solar | Edison, NJ | 1.6 GWh | 2.4 mi |
| FedEx Woodbridge | Keasbey, NJ | 2.1 GWh | 4.1 mi |
| Heller 400M | Edison Township, NJ | 1.4 GWh | 0.7 mi |
| Highland Park Borough Solar | Highland Park, NJ | 550.0 MWh | 1 mi |
| ILR Landfill | Edison, NJ | 9.1 GWh | 1.9 mi |
| Jordache Enterprises Solar | South Plainfield, NJ | 1.4 GWh | 4.2 mi |
| Livingston Solar Canopies | Piscataway, NJ | 1.8 GWh | 3 mi |
| Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 2.5 GWh | 3 mi |
| Red Oak Power LLC | Sayreville, NJ | 3.3 TWh | 4.2 mi |
| Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Piscataway, NJ | 2.2 GWh | 4.1 mi |
| Rutgers Cook Douglass Lot 97 & 98a | New Brunswick, NJ | 2.1 GWh | 2.2 mi |
| Sayreville | Sayreville, NJ | 525.0 MWh | 2.8 mi |
| Summit Associates | Edison, NJ | 1.7 GWh | 2.4 mi |
| Wakefern Food Corp | Keasbey, NJ | 2.6 GWh | 3.9 mi |