130 Schenley Marina Drive, Schenley, PA 15682Plant Summary Information
Allegheny No. 5 Hydro Station is ranked #12 out of 17 hydroelectric power plants in Pennsylvania in terms of total annual net electricity generation.
Allegheny No. 5 Hydro Station is comprised of 2 generators and generated 11.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Allegheny No. 5 Hydro Station |
---|---|
Utility Name | Eagle Creek Renewable Energy, LLC |
Location | Armstrong County, PA |
Initial Operation Date | October 1988 |
Last Update | Dec 2022 |
Annual Generation | 41.0 GWh |
Annual Consumption | 160.4 k MMBtu |
Ranked #4,083 out of 11,455 Power Plants Nationwide | |
Ranked #552 out of 1,374 Water Power Plants Nationwide | |
Ranked #117 out of 236 Pennsylvania Power Plants | |
Ranked #12 out of 17 Pennsylvania Water Power Plants | |
Fuel Types | Water |
Previous Operators |
Allegheny Energy Supply Co LLC (2013 to 2014) All Dams Generation, LLC (2015 to 2020) Eagle Creek Renewable Energy, LLC (2021 to 2022) |
Map of Allegheny No. 5 Hydro Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Allegheny No. 5 Hydro Station.
Monthly Net Generation for Allegheny No. 5 Hydro Station
Allegheny No. 5 Hydro Station Details
Summary Information | |
---|---|
Plant Name | Allegheny No. 5 Hydro Station (50893) |
Plant Address | 130 Schenley Marina Drive Schenley, PA 15682 |
Utility | Eagle Creek Renewable Energy, LLC (57280) |
Latitude, Longitude | 40.68288, -79.6653 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | October 1988 |
Annual Generation | 41.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 85-73-002 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG14-7 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Allegheny River |
Ash Impoundment | No |
Transmission / Distribution Owner | West Penn Power Company (20387) PA |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating October 1988
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 4.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1988 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator GEN2 Details Operating October 1988
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 4.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 3 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1988 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Allegheny No. 5 Hydro Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
All Dams Generation, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator GEN1 | 100.00% |
All Dams Generation, LLC | 7315 Wisconsin Ave, Bethesda, MD 20814 | Generator GEN2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#542 | Green Island Hydroelectric Station | Green Island, NY | 43.0 GWh |
#543 | Dells | Eau Claire, WI | 42.9 GWh |
#544 | Du Bay | Eau Pleine, WI | 42.5 GWh |
#545 | Solomon Gulch | Valdez, AK | 42.0 GWh |
#546 | McClure Dam | Marquette, MI | 41.9 GWh |
#547 | Horseshoe Bend Hydroelectric Co | Horseshoe Bend, ID | 41.9 GWh |
#548 | Mystic | Fishtail, MT | 41.6 GWh |
#549 | Falls Village | Falls Village, CT | 41.5 GWh |
#550 | Hiram | Hiram, ME | 41.5 GWh |
#551 | Falls River Hydro | Ashton, ID | 41.1 GWh |
#553 | El Dorado | Pollock Pines, CA | 40.9 GWh |
#554 | City Power Plant | Idaho Falls, ID | 40.8 GWh |
#555 | Broadwater Power Project | Toston, MT | 40.8 GWh |
#556 | Flint River | Albany, GA | 40.7 GWh |
#557 | Higley | Colton, NY | 40.5 GWh |
#558 | Soft Maple | Croghan, NY | 40.5 GWh |
#559 | Buzzard Roost | Chappells, SC | 40.1 GWh |
#560 | PHP 2 | Sandy, OR | 39.9 GWh |
#561 | Gay Robinson | Kaumakani, HI | 39.8 GWh |
#562 | Morgan Falls | Dunwoody, GA | 39.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Allegheny No. 5 Hydro Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.9 TWh | 10.9 mi |
Allegheny Hydro No 8 | Adrian, PA | 78.4 GWh | 17.7 mi |
Allegheny Hydro No 9 | Cowansville, PA | 96.0 GWh | 19.8 mi |
Allegheny No 6 Hydro Station | Ford City, PA | 39.6 GWh | 5.2 mi |
Armstrong | Shelocta, PA | 1.2 TWh | 16.7 mi |
Brunot Island | Pittsburg, PA | 50.5 GWh | 24.9 mi |
Cheswick Power Plant | Cheswick, PA | 1.6 TWh | 12 mi |
Clairton Works | Clairton, PA | 142.0 GWh | 28.2 mi |
Conemaugh Hydro Plant | Saltsburg, PA | 61.3 GWh | 21.8 mi |
ECP Uptown Campus | Pittsburgh, PA | 30.5 GWh | 24 mi |
Homer City Generating Station | Homer City, PA | 670.0 GWh | 27.3 mi |
Hunker Solar River, LLC | Ruffs Dale, PA | 3.7 GWh | 32.2 mi |
Indiana University of Pennsylvania | Indiana, PA | 23.7 GWh | 26.9 mi |
Keystone | Shelocta, PA | 3.8 TWh | 17.1 mi |
Mahoning Creek Hydroelectric Project | New Bethlehem, PA | 19.3 GWh | 26 mi |
Mon Valley Works | Dravosburg, PA | 458.3 GWh | 22.4 mi |
PG Solar 1 | Findlay Township, PA | 4.9 GWh | 33.8 mi |
Pittsburgh Airport Gas Plant | Coraopolis, PA | 125.2 GWh | 32.5 mi |
Springdale 1 & 2 | Springdale, PA | 154.9 GWh | 10.9 mi |
Townsend Hydro | New Brighton, PA | 19.8 GWh | 34.2 mi |