Bluegrass Generating Station
3095 Commerce Pkwy, LaGrange, KY 40031Plant Summary Information
Bluegrass Generating Station is ranked #26 out of 56 power plants in Kentucky in terms of total annual net electricity generation.
Bluegrass Generating Station is comprised of 3 generators and generated 24.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Bluegrass Generating Station |
---|---|
Utility Name | East Kentucky Power Coop, Inc |
Location | Oldham County, KY |
Initial Operation Date | June 2002 |
Last Update | Dec 2024 |
Annual Generation | 112.5 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #3,142 out of 12,299 Power Plants Nationwide | |
Ranked #880 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 56 Kentucky Power Plants | |
Ranked #11 out of 16 Kentucky Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.6% |
Previous Operator |
Bluegrass Generation Co LLC (2013 to 2014) East Kentucky Power Coop, Inc (2015 to 2024) |
Map of Bluegrass Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bluegrass Generating Station.
Monthly Net Generation for Bluegrass Generating Station
Bluegrass Generating Station Details
Summary Information | |
---|---|
Plant Name | Bluegrass Generating Station (55164) |
Plant Address | 3095 Commerce Pkwy, LaGrange, KY 40031 |
Utility | East Kentucky Power Coop, Inc (5580) |
Latitude, Longitude | 38.3902, -85.4133 |
Generation Dates on File | Mar 2002 to Dec 2024 |
Initial Operation Date | June 2002 |
Annual Generation | 112.5 GWh |
Fuel Types | Natural Gas : 99.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Oldham County Water District |
Ash Impoundment | No |
Transmission / Distribution Owner | Louisville Gas & Electric Co (11249) KY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TEXAS GAS TRANSMISSION LLC |
Natural Gas Storage | No |
Generator CT1 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 1369012640 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 79152101 |
Nameplate Capacity | 208 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 189 MW |
Minimum Load | 117 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 167 MW |
Net Winter Capacity With Natural Gas | 189 MW |
Net Summer Capacity With Oil | 158 MW |
Net Winter Capacity With Oil | 179 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT2 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 1369012641 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 79152102 |
Nameplate Capacity | 208 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 189 MW |
Minimum Load | 117 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 167 MW |
Net Winter Capacity With Natural Gas | 189 MW |
Net Summer Capacity With Oil | 158 MW |
Net Winter Capacity With Oil | 179 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator CT3 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 1439657846 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 79152103 |
Nameplate Capacity | 208 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 189 MW |
Minimum Load | 117 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 167 MW |
Net Winter Capacity With Natural Gas | 189 MW |
Net Summer Capacity With Oil | 158 MW |
Net Winter Capacity With Oil | 179 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Bluegrass Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#870 | Vernon Boulevard | Long Island City, NY | 117.2 GWh |
#871 | Lee Energy Facility | Dixon, IL | 116.8 GWh |
#872 | James River Power Station | Springfield, MO | 123.0 GWh |
#873 | Kansas Ethanol, LLC | Lyons, KS | 116.3 GWh |
#874 | BYU Central Heating Plant | Provo, UT | 115.6 GWh |
#875 | Peno Creek | Bowling Green, MO | 118.5 GWh |
#876 | Lange Generating Station | Rapid City, SD | 115.4 GWh |
#877 | Chamon Power LLC | Houston, TX | 114.9 GWh |
#878 | Empire Energy Center | Sarcoxie, MO | 133.9 GWh |
#879 | Ticonderoga Mill | Ticonderoga, NY | 195.7 GWh |
#881 | UCI Facilities Management Central Plant | Irvine, CA | 112.1 GWh |
#882 | CML&P Generating Facility No. 2 | Coffeyville, KS | 111.7 GWh |
#883 | McCartney | Strafford, MO | 111.7 GWh |
#884 | Energy Center Dover | Dover, DE | 111.9 GWh |
#885 | Bacliff | Bacliff, TX | 111.3 GWh |
#886 | Cargill Corn Milling Division | Eddyville, IA | 110.5 GWh |
#887 | Harlem River Yard | Bronx, NY | 109.7 GWh |
#888 | PPS Power Plant No 1 | Paducah, KY | 109.4 GWh |
#889 | Lawrence County Station | Mitchell, IN | 109.3 GWh |
#890 | Glenwood Landing | Glenwood Landing, NY | 129.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bluegrass Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bavarian LFGTE | Walton, KY | 28.7 GWh | 52.2 mi |
Cane Run | Louisville, KY | 4.9 TWh | 29.5 mi |
Clifty Creek | Madison, IN | 5.6 TWh | 24 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.0 GWh | 49.9 mi |
East Bend | Union, KY | 2.3 TWh | 46.7 mi |
Ghent | Ghent, KY | 11.4 TWh | 32.2 mi |
Green City Recovery, LLC | Georgetown, KY | 1.2 GWh | 46.9 mi |
Hardin County LFGTE | Elizabethtown, KY | 10.3 GWh | 49 mi |
Henryville Solar RES | Underwood, IN | 1.8 GWh | 24.3 mi |
Jackson Co. Solar RES | Columbus, IN | 1.4 GWh | 47.7 mi |
Lanesville Solar RES | Lanesville, IN | 907.0 MWh | 32.1 mi |
Markland | Florence, IN | 394.7 GWh | 36.2 mi |
Mill Creek (KY) | Louisville, KY | 6.3 TWh | 35.7 mi |
Mother Ann Lee | Harrodsburg, KY | 6.3 GWh | 53.9 mi |
Ohio Falls | Shippingport Island, KY | 235.5 GWh | 21.2 mi |
Paddys Run | Louisville, KY | 47.9 GWh | 25.9 mi |
Scottsburg Solar Park | Scottsburg, IN | 12.5 GWh | 27.5 mi |
Trimble County | Bedford, KY | 8.9 TWh | 13.4 mi |
Walton 1 Solar Facility | Walton, KY | 3.1 GWh | 54.5 mi |
Walton 2 Solar Facility | Walton, KY | 2.9 GWh | 54.5 mi |