Ceredo Generating Station
1662 Walker Branch Road, Huntington, WV 25704Plant Summary Information
Ceredo Generating Station is ranked #9 out of 39 power plants in West Virginia in terms of total annual net electricity generation.
Ceredo Generating Station is comprised of 6 generators and generated 239.5 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Ceredo Generating Station |
|---|---|
| Utility Name | Appalachian Power Co |
| Location | Wayne County, WV |
| Initial Operation Date | June 2001 |
| Last Update | Feb 2026 |
| Annual Generation | 775.8 GWh |
| Annual Consumption | 10.0 M MMBtu |
| Ranked #916 out of 12,637 Power Plants Nationwide | |
| Ranked #482 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #9 out of 39 West Virginia Power Plants | |
| Ranked #2 out of 8 West Virginia Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Ceredo Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ceredo Generating Station.
Monthly Net Generation for Ceredo Generating Station
Monthly Plant Fuel Consumption for Ceredo Generating Station
Ceredo Generating Station Details
| Summary Information | |
|---|---|
| Plant Name | Ceredo Generating Station (55276) |
| Plant Address | 1662 Walker Branch Road, Huntington, WV 25704 |
| Utility | Appalachian Power Co (733) |
| Latitude, Longitude | 38.3681, -82.5339 |
| Generation Dates on File | Jul 2001 to Feb 2026 |
| Initial Operation Date | June 2001 |
| Annual Generation | 775.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | City of Kenova |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Appalachian Power Co (733) WV |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | COLUMBIA GAS TRANSMISSION CORP |
| Natural Gas Storage | No |
Generator 01 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 02 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 03 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 04 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 05 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 06 Details Operating June 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 86 MW |
| Minimum Load | 64 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Ceredo Generating Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #472 | Riverside Generating LLC | Catlettsburg, KY | 837.0 GWh |
| #473 | Power Island | Alvin, TX | 833.4 GWh |
| #474 | Freeport Energy Center | Freeport, TX | 833.0 GWh |
| #475 | Washington County Cogeneration Facility | McIntosh, AL | 825.9 GWh |
| #476 | Plant X | Earth, TX | 815.7 GWh |
| #477 | R W Miller | Palo Pinto, TX | 808.5 GWh |
| #478 | John R Kelly | Gainesville, FL | 807.2 GWh |
| #479 | Southwestern | Anadarko, OK | 779.4 GWh |
| #480 | Donald Von Raesfeld Power Plant | Santa Clara, CA | 776.8 GWh |
| #481 | Hardee Power Station | Bowling Green, FL | 778.9 GWh |
| #483 | Dean | East China, MI | 770.1 GWh |
| #484 | Greenland Energy Center | Jacksonville, FL | 770.9 GWh |
| #485 | T H Wharton | Houston, TX | 743.6 GWh |
| #486 | Alliant Energy Neenah | Neenah, WI | 739.9 GWh |
| #487 | Vermillion Energy Facility | Cayuga, IN | 727.9 GWh |
| #488 | Gregory Power Plant | Gregory, TX | 721.8 GWh |
| #489 | EG178 Facility | Snyder, TX | 713.1 GWh |
| #490 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 712.0 GWh |
| #491 | Orlando Cogen LP | Orlando, FL | 704.8 GWh |
| #492 | Clark (NVE) | Las Vegas, NV | 702.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ceredo Generating Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BHER Ravenswood Solar 1 | WV | 1.6 GWh | 53.7 mi |
| Big Sandy | Louisa, KY | 1.1 TWh | 14.4 mi |
| Big Sandy Peaker Plant | Kenona, WV | 285.3 GWh | 3.6 mi |
| Gavin Power, LLC | Cheshire, OH | 13.2 TWh | 45.2 mi |
| Great Bend Solar Project | Portland, OH | 12.7 GWh | 60.2 mi |
| Green Valley LFGTE | Ashland, KY | 18.8 GWh | 15 mi |
| Greenup Hydro | Franklin Furnace, OH | 261.5 GWh | 26.1 mi |
| Hanging Rock Energy Facility | Ironton, OH | 10.3 TWh | 19.6 mi |
| Haverhill North Cogeneration Facility | Franklin Furnace, OH | 325.4 GWh | 22.4 mi |
| John E Amos | St Albans, WV | 8.3 TWh | 39.1 mi |
| Kyger Creek | Cheshire, OH | 5.3 TWh | 43.6 mi |
| London | Handley, WV | 72.9 GWh | 64.2 mi |
| Marmet | Marmet, WV | 67.4 GWh | 52.9 mi |
| Martin County Solar Project, LLC | Pilgrim, KY | 211.5 GWh | 41.8 mi |
| Morehead Generating Facility | Morehead, KY | 6.3 GWh | 56.1 mi |
| Mountaineer | New Haven, WV | 6.8 TWh | 53.2 mi |
| Racine | Racine, OH | 174.8 GWh | 50.7 mi |
| Riverside Generating LLC | Catlettsburg, KY | 837.0 GWh | 12.8 mi |
| Rolling Hills Generating | Wilkesville, OH | 2.2 TWh | 50.6 mi |
| Winfield | Winfield, WV | 84.4 GWh | 35.3 mi |