Madison
5657 Kennel Rd, Trenton, OH 45067Plant Summary Information
Madison is ranked #23 out of 206 power plants in Ohio in terms of total annual net electricity generation.
Madison is comprised of 8 generators and generated 205.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Madison |
|---|---|
| Utility Name | Duke Energy Indiana, LLC |
| Location | Butler County, OH |
| Initial Operation Date | June 2000 |
| Last Update | Dec 2024 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 14.4 M MMBtu |
| Ranked #728 out of 13,081 Power Plants Nationwide | |
| Ranked #431 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #23 out of 206 Ohio Power Plants | |
| Ranked #16 out of 54 Ohio Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Duke Energy Indiana Inc (2013 to 2014) Duke Energy Indiana, LLC (2015 to 2025) |
Map of Madison
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Madison.
Monthly Net Generation for Madison
Monthly Plant Fuel Consumption for Madison
Madison Details
| Summary Information | |
|---|---|
| Plant Name | Madison (55110) |
| Plant Address | 5657 Kennel Rd, Trenton, OH 45067 |
| Utility | Duke Energy Indiana, LLC (15470) |
| Latitude, Longitude | 39.4522, -84.4647 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | June 2000 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator CT1 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 71 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT2 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 71 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT3 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 69 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT4 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 70 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT5 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 70 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT6 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 72 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT7 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 73 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator CT8 Details Operating June 2000
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CP/Comm Pricing |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CP/Comm Pricing |
| Nameplate Capacity | 86.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 70 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2000 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Madison Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #421 | Big Sandy | Louisa, KY | 1.1 TWh |
| #422 | Bayonne Energy Center | Bayonne, NJ | 1.1 TWh |
| #423 | Cordova Energy | Cordova, IL | 1.1 TWh |
| #424 | Grays Ferry Cogeneration | Philadelphia, PA | 1.1 TWh |
| #425 | Hog Bayou Energy Center | Mobile, AL | 1.1 TWh |
| #426 | E F Barrett | Island Park, NY | 1.1 TWh |
| #427 | Cope | Cope, SC | 1.6 TWh |
| #428 | Southcentral Power Project | Anchorage, AK | 1.1 TWh |
| #429 | Michigan Power LP | Ludington, MI | 1.1 TWh |
| #430 | Chevron Oil | Pascagoula, MS | 1.1 TWh |
| #432 | Sim Gideon | Bastrop, TX | 1.0 TWh |
| #433 | J K Smith | Winchester, KY | 1.0 TWh |
| #434 | Ocean State Power | Harrisville, RI | 1.0 TWh |
| #435 | Bennett Mountain | Mountain Home, ID | 999.1 GWh |
| #436 | Belle River | China Twp, MI | 4.7 TWh |
| #437 | Millennium Power | Charlton, MA | 995.2 GWh |
| #438 | Hardee Power Station | Bowling Green, FL | 984.0 GWh |
| #439 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 985.8 GWh |
| #440 | Holland Energy Park | Holland, MI | 973.5 GWh |
| #441 | Little Gypsy | La Place, LA | 964.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Madison.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aero Solar Facility | Burlington, KY | 2.8 GWh | 30.9 mi |
| Central Utility Plant Cincinnati | Cincinnati, OH | 223.0 GWh | 22.1 mi |
| CZ Solar Warren, LLC | Lebanon, OH | 32.2 GWh | 8.2 mi |
| Dick's Creek | Monroe, OH | 15.0 GWh | 4.7 mi |
| East Campus Utility Plant | Cincinnati, OH | 526.3 MWh | 21.8 mi |
| Hamilton (OH) | Hamilton, OH | 1.2 GWh | 5.6 mi |
| Hamilton Hydro | HAMILTON, OH | 8.8 GWh | 5.6 mi |
| Hamilton Peaking | Hamilton, OH | 1.5 GWh | 7.4 mi |
| Miami Fort | North Bend, OH | 6.5 TWh | 29.6 mi |
| Middletown Coke Company, LLC | Middletown, OH | 360.0 GWh | 3.6 mi |
| Middletown Energy Center | Middletown, OH | 3.5 TWh | 6.3 mi |
| Monument | Dayton, OH | 114.0 MWh | 26.7 mi |
| O H Hutchings | Miamisburg, OH | 397.0 MWh | 14.2 mi |
| Parking Lot Array | Cincinnati, OH | 1.4 GWh | 21.6 mi |
| RA Jones Roof Mounted Solar System | Covington, KY | 2.0 GWh | 28.9 mi |
| Richmond Solar Site 2 | Richmond, IN | 12.9 GWh | 32.3 mi |
| Solvita | Kettering, OH | 67.0 MWh | 26.4 mi |
| Tait Electric Generating Station | Moraine, OH | 957.6 GWh | 23.3 mi |
| Woodsdale | Trenton, OH | 463.4 GWh | 0.3 mi |
| Yankee Street | Centerville, OH | 29.0 GWh | 17.3 mi |