I 95 Landfill Phase II
9898B Furnace Raod, Lorton, VA 22079Plant Summary Information
I 95 Landfill Phase II is ranked #10 out of 17 landfill gas power plants in Virginia in terms of total annual net electricity generation.
I 95 Landfill Phase II is comprised of 4 generators and generated 4.4 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | I 95 Landfill Phase II |
|---|---|
| Utility Name | NextEra Renewable Fuels, LLC |
| Location | Fairfax County, VA |
| Initial Operation Date | March 1993 |
| Last Update | Dec 2024 |
| Annual Generation | 19.3 GWh |
| Annual Consumption | 277.8 k MMBtu |
| Ranked #5,288 out of 12,539 Power Plants Nationwide | |
| Ranked #145 out of 293 Landfill Gas Power Plants Nationwide | |
| Ranked #143 out of 233 Virginia Power Plants | |
| Ranked #10 out of 17 Virginia Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
| Previous Operators |
LES Project Holdings LLC (2013 to 2020) EPP Renewable Energy (2021 to 2023) NextEra Renewable Fuels, LLC (2024 to 2024) |
Map of I 95 Landfill Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for I 95 Landfill Phase II.
Monthly Net Generation for I 95 Landfill Phase II
I 95 Landfill Phase II Details
| Summary Information | |
|---|---|
| Plant Name | I 95 Landfill Phase II (54723) |
| Plant Address | 9898B Furnace Raod, Lorton, VA 22079 |
| Utility | NextEra Renewable Fuels, LLC (57249) |
| Latitude, Longitude | 38.6892, -77.2375 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | March 1993 |
| Annual Generation | 19.3 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 93-010-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
| Grid Voltage | 34.00 kV |
| Energy Storage | No |
Generator UNT1 Details Operating March 1993
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1993 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNT2 Details Operating March 1993
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1993 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNT3 Details Operating March 1993
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1993 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNT4 Details Operating March 1993
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1993 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
I 95 Landfill Phase II Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #135 | Short Mountain | Eugene, OR | 21.9 GWh |
| #136 | Settlers Hill Gas Recovery | Batavia, IL | 21.5 GWh |
| #137 | Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh |
| #138 | GRS C&C | Marshall, MI | 21.0 GWh |
| #139 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
| #140 | Energy Developments, Hancock | Findlay, OH | 20.6 GWh |
| #141 | Fighting Creek LFGTE Plant | Coeur d'Alene, ID | 19.9 GWh |
| #142 | Lycoming County | Montgomery, PA | 19.9 GWh |
| #143 | Ameresco Jefferson City | Jefferson City, MO | 19.9 GWh |
| #144 | Gaston County Renewable Energy Center | Dallas, NC | 19.8 GWh |
| #146 | Jay County LFGTE | Portland, IN | 19.3 GWh |
| #147 | New Bern | New Bern, NC | 20.2 GWh |
| #148 | Deercroft I & II LFGTE | Michigan City, IN | 19.2 GWh |
| #149 | Lee County Landfill | Bishopville, SC | 19.1 GWh |
| #150 | Ameresco Keller Canyon | Bay Point, CA | 19.1 GWh |
| #151 | Dry Creek LFG to Energy Project | Eagle Point, OR | 19.0 GWh |
| #152 | Union Renewable Energy Facility | Enoree, SC | 19.0 GWh |
| #153 | Timberline Trail Gas Recovery | Weyerhaeser, WI | 18.9 GWh |
| #154 | DADS Gas Recovery | Aurora, CO | 18.8 GWh |
| #155 | Green Valley LFGTE | Ashland, KY | 18.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding I 95 Landfill Phase II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Church Street Plant | Manassas, VA | 192.0 MWh | 12.9 mi |
| Covanta Alexandria/Arlington Energy | Alexandria, VA | 146.0 GWh | 9.7 mi |
| Covanta Fairfax Energy | Lorton, VA | 646.5 GWh | 0.4 mi |
| DC Water Solar | Washington, DC | 5.6 GWh | 14.8 mi |
| Dominion/Lo Mar | Manassas, VA | 418.0 MWh | 14.5 mi |
| Gateway Gen | Manassas, VA | 251.0 MWh | 14.9 mi |
| Godwin Drive Plant | Manassas, VA | 416.0 MWh | 15 mi |
| JBAB - Washington DC | Washington, DC | 8.2 GWh | 16.7 mi |
| MM Prince William Energy | Manassas, VA | 43.1 GWh | 10.2 mi |
| Oxon Run CREF | Washington, DC | 1.5 GWh | 15.6 mi |
| Possum Point | Dumfries, VA | 2.6 TWh | 10.8 mi |
| Ripley | La Plata, MD | 43.9 GWh | 13.1 mi |
| Ross Hall Central Utility Plant | Washington, DC | 11.0 MWh | 17.7 mi |
| Synergen Panorama, LLC CSG | Fort Washington, MD | 7.9 GWh | 15.3 mi |
| US GSA Heating and Transmission | Washington, DC | 37.4 GWh | 17.6 mi |
| VMEA 1 Credit Gen | Manassas, VA | 565.0 MWh | 15 mi |
| VMEA Peaking Gen | Manassas, VA | 329.0 MWh | 15 mi |
| Walt Bailey Bioenergy Facility | Washington, DC | 51.6 GWh | 14.9 mi |
| WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 1.9 GWh | 17.6 mi |
| WW-DC Solar 1, LLC | Washington, DC | 1.2 GWh | 15.8 mi |