I 95 Landfill Phase II
9898B Furnace Raod, Lorton, VA 22079Plant Summary Information
I 95 Landfill Phase II is ranked #11 out of 17 landfill gas power plants in Virginia in terms of total annual net electricity generation.
I 95 Landfill Phase II is comprised of 4 generators and generated 4.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | I 95 Landfill Phase II |
---|---|
Utility Name | NextEra Renewable Fuels, LLC |
Location | Fairfax County, VA |
Initial Operation Date | March 1993 |
Last Update | Dec 2024 |
Annual Generation | 19.3 GWh |
Annual Consumption | 277.8 k MMBtu |
Ranked #5,206 out of 12,288 Power Plants Nationwide | |
Ranked #146 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #143 out of 227 Virginia Power Plants | |
Ranked #11 out of 17 Virginia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
LES Project Holdings LLC (2013 to 2020) EPP Renewable Energy (2021 to 2023) NextEra Renewable Fuels, LLC (2024 to 2024) |
Map of I 95 Landfill Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for I 95 Landfill Phase II.
Monthly Net Generation for I 95 Landfill Phase II
I 95 Landfill Phase II Details
Summary Information | |
---|---|
Plant Name | I 95 Landfill Phase II (54723) |
Plant Address | 9898B Furnace Raod, Lorton, VA 22079 |
Utility | NextEra Renewable Fuels, LLC (57249) |
Latitude, Longitude | 38.6892, -77.2375 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | March 1993 |
Annual Generation | 19.3 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 93-010-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator UNT1 Details Operating March 1993
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1993 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT2 Details Operating March 1993
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1993 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT3 Details Operating March 1993
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1993 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT4 Details Operating March 1993
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1993 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
I 95 Landfill Phase II Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#136 | Short Mountain | Eugene, OR | 21.9 GWh |
#137 | Settlers Hill Gas Recovery | Batavia, IL | 21.5 GWh |
#138 | Cumberland County Solid Waste Complex | Millville, NJ | 21.4 GWh |
#139 | GRS C&C | Marshall, MI | 21.0 GWh |
#140 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
#141 | Energy Developments, Hancock | Findlay, OH | 20.6 GWh |
#142 | Fighting Creek LFGTE Plant | Coeur d'Alene, ID | 19.9 GWh |
#143 | Lycoming County | Montgomery, PA | 19.9 GWh |
#144 | Ameresco Jefferson City | Jefferson City, MO | 19.9 GWh |
#145 | Gaston County Renewable Energy Center | Dallas, NC | 19.8 GWh |
#147 | Jay County LFGTE | Portland, IN | 19.3 GWh |
#148 | New Bern | New Bern, NC | 20.2 GWh |
#149 | Deercroft I & II LFGTE | Michigan City, IN | 19.2 GWh |
#150 | Lee County Landfill | Bishopville, SC | 19.1 GWh |
#151 | Ameresco Keller Canyon | Bay Point, CA | 19.1 GWh |
#152 | Dry Creek LFG to Energy Project | Eagle Point, OR | 19.0 GWh |
#153 | Union Renewable Energy Facility | Enoree, SC | 19.0 GWh |
#154 | Timberline Trail Gas Recovery | Weyerhaeser, WI | 18.9 GWh |
#155 | DADS Gas Recovery | Aurora, CO | 18.8 GWh |
#156 | Green Valley LFGTE | Ashland, KY | 18.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding I 95 Landfill Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Church Street Plant | Manassas, VA | 192.0 MWh | 12.9 mi |
Covanta Alexandria/Arlington Energy | Alexandria, VA | 143.7 GWh | 9.7 mi |
Covanta Fairfax Energy | Lorton, VA | 627.6 GWh | 0.4 mi |
DC Water Solar | Washington, DC | 5.6 GWh | 14.8 mi |
Dominion/Lo Mar | Manassas, VA | 418.0 MWh | 14.5 mi |
Gateway Gen | Manassas, VA | 251.0 MWh | 14.9 mi |
Godwin Drive Plant | Manassas, VA | 416.0 MWh | 15 mi |
JBAB - Washington DC | Washington, DC | 8.2 GWh | 16.7 mi |
MM Prince William Energy | Manassas, VA | 43.1 GWh | 10.2 mi |
Oxon Run CREF | Washington, DC | 1.5 GWh | 15.6 mi |
Possum Point | Dumfries, VA | 2.4 TWh | 10.8 mi |
Ripley | La Plata, MD | 50.8 GWh | 13.1 mi |
Ross Hall Central Utility Plant | Washington, DC | 11.0 MWh | 17.7 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 7.9 GWh | 15.3 mi |
US GSA Heating and Transmission | Washington, DC | 43.1 GWh | 17.6 mi |
VMEA 1 Credit Gen | Manassas, VA | 565.0 MWh | 15 mi |
VMEA Peaking Gen | Manassas, VA | 329.0 MWh | 15 mi |
Walt Bailey Bioenergy Facility | Washington, DC | 53.7 GWh | 14.9 mi |
WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 1.9 GWh | 17.6 mi |
WW-DC Solar 1, LLC | Washington, DC | 1.2 GWh | 15.8 mi |