Cameron Solar II
5992 Cameron Road, Cameron, SC 29030Plant Summary Information
Cameron Solar II is ranked #59 out of 125 solar farms in South Carolina in terms of total annual net electricity generation.
Cameron Solar II generated 1.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cameron Solar II |
|---|---|
| Utility Name | SunStrong Management |
| Location | Calhoun County, SC |
| Initial Operation Date | July 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 7.3 GWh |
| Annual Consumption | 26.4 k MMBtu |
| Ranked #7,272 out of 13,081 Power Plants Nationwide | |
| Ranked #2,780 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #108 out of 202 South Carolina Power Plants | |
| Ranked #59 out of 125 South Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Cameron Solar II, LLC (2016 to 2024) Pine Gate Renewables (2017 to 2017) SunStrong Management (2025 to 2025) |
Map of Cameron Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cameron Solar II.
Monthly Net Generation for Cameron Solar II
Monthly Plant Fuel Consumption for Cameron Solar II
Cameron Solar II Details
| Summary Information | |
|---|---|
| Plant Name | Cameron Solar II (61326) |
| Plant Address | 5992 Cameron Road, Cameron, SC 29030 |
| Utility | SunStrong Management (67509) |
| Latitude, Longitude | 33.567, -80.699 |
| Generation Dates on File | Jul 2017 to Dec 2025 |
| Initial Operation Date | July 2017 |
| Annual Generation | 7.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 16-402-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Dominion Energy South Carolina (SCEG) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Dominion Energy South Carolina (17539) SC |
| Grid Voltage | 8.32 kV |
| Energy Storage | No |
Generator PGRB2 Details Operating July 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.1 MW |
| Summer Capacity | 4.1 MW |
| Winter Capacity | 4.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 5.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cameron Solar II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2770 | SCS Harpswell 012903 Brunswick, LLC | Brunswick, ME | 7.3 GWh |
| #2771 | Hanover | Wrightstown, NJ | 7.3 GWh |
| #2772 | Standish | Standish, ME | 7.3 GWh |
| #2773 | Ironwood Solar LLC | Blythe, CA | 7.3 GWh |
| #2774 | Leggett Solar, LLC | Leggett, NC | 7.3 GWh |
| #2775 | Day Four Solar LLC | Wrightstown, NJ | 7.3 GWh |
| #2776 | TJA-NY-1454 CR 15 Oswegatchie, LLC | Oswegatchie, NY | 7.3 GWh |
| #2777 | Pendleton Solar 1 | Lockport, NY | 7.3 GWh |
| #2778 | Chuckawalla Solar | Blythe, CA | 7.3 GWh |
| #2779 | Settlers Solar | Lunenberg, MA | 7.3 GWh |
| #2781 | Dodge Holdco Solar CSG | Kasson, MN | 7.3 GWh |
| #2782 | North Eagle Village Solar | Manilus, NY | 7.3 GWh |
| #2783 | Bolton Farm | Warrenton, NC | 7.3 GWh |
| #2784 | Morgan Solar Center | Ontario, OR | 7.3 GWh |
| #2785 | Copperton Solar Plant No. 1 | Bingham Canyon, UT | 7.3 GWh |
| #2786 | Oswego | Oswego, NY | 7.3 GWh |
| #2787 | Kalish Farm Solar | Candor, NC | 7.3 GWh |
| #2788 | Farmington | Farmington, ME | 7.3 GWh |
| #2789 | North Run | Wrightstown, NJ | 7.3 GWh |
| #2790 | DG Haverhill CSG | Haverhill, MA | 7.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cameron Solar II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bloom Solar | Summerton, SC | 3.8 GWh | 21.1 mi |
| Bond Solar | Summerton, SC | 3.5 GWh | 19.6 mi |
| Bull Street Plant | Orangeburg, SC | 132.0 MWh | 11.2 mi |
| Cameron Solar | Cameron, SC | 37.3 GWh | 0.7 mi |
| Cope | Cope, SC | 1.6 TWh | 23.7 mi |
| Dorchester Biomass | Harleyville, SC | 150.0 GWh | 26.8 mi |
| Eastover Solar | Eastover, SC | 138.5 GWh | 24.5 mi |
| Gunsight Solar, LLC | Swansea, SC | 170.3 GWh | 25 mi |
| Huntley | Bowman, SC | 153.0 GWh | 16.4 mi |
| Jamison Solar Farm | Orangeburg, SC | 1.9 GWh | 8 mi |
| Lone Star Solar | Cameron, SC | 174.7 GWh | 6.6 mi |
| Midlands | St. Matthews, SC | 154.4 GWh | 15.1 mi |
| North Road Peak | Oangeburg, SC | 2.1 GWh | 12.3 mi |
| Palmetto Plains | Bowman, SC | 126.5 GWh | 15.7 mi |
| Rowesville Rd Plant | Orangeburg, SC | 928.0 MWh | 12.4 mi |
| St. Matthews Solar | Matthews, SC | 16.6 GWh | 9 mi |
| Substation 20 Plant | Orangeburg, SC | 168.0 MWh | 12 mi |
| Sylvamo Corporation Eastover Facility | Eastover, SC | 546.3 GWh | 22.4 mi |
| TWE Bowman Solar Project | Bowman, SC | 136.5 GWh | 17.4 mi |
| Wateree | Eastover, SC | 2.6 TWh | 18.5 mi |