MCRD Parris Island PV Hybrid
283 Blvd De France, Parris Island, SC 29905Plant Summary Information
MCRD Parris Island PV Hybrid is ranked #14 out of 26 natural gas power plants in South Carolina in terms of total annual net electricity generation.
MCRD Parris Island PV Hybrid generated 7.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | MCRD Parris Island PV Hybrid |
|---|---|
| Utility Name | Ameresco Federal Solutions |
| Location | Beaufort County, SC |
| Initial Operation Date | September 2018 |
| Last Update | Dec 2024 |
| Annual Generation | 32.2 GWh |
| Annual Consumption | 344.2 k MMBtu |
| Ranked #4,641 out of 12,539 Power Plants Nationwide | |
| Ranked #1,341 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #60 out of 196 South Carolina Power Plants | |
| Ranked #14 out of 26 South Carolina Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 69.0% Solar : 30.9% |
Map of MCRD Parris Island PV Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MCRD Parris Island PV Hybrid.
Monthly Net Generation for MCRD Parris Island PV Hybrid
MCRD Parris Island PV Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | MCRD Parris Island PV Hybrid (61956) |
| Plant Address | 283 Blvd De France, Parris Island, SC 29905 |
| Utility | Ameresco Federal Solutions (60146) |
| Latitude, Longitude | 32.3294, -80.69472 |
| Generation Dates on File | Sep 2018 to Dec 2024 |
| Initial Operation Date | September 2018 |
| Annual Generation | 32.2 GWh |
| Fuel Types | Natural Gas : 69.0% Solar : 30.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Dominion Energy South Carolina (SCEG) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Dominion Energy South Carolina (17539) SC |
| Grid Voltage | 12.47 kV |
| Energy Storage | Yes |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator CARPT Details Operating October 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.6 MW |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 7 |
| DC Net Capacity | 1.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator TBESS Details Operating December 2018
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 4 MW |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 8 |
|---|---|
| Maximum Charge Rate | 4 MW |
| Maximum Discharge Rate | 4 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 4 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Backup Power | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 61956 / 61956 |
| Direct Support Gen Id | GRDMT / CARPT |
| Support T D Asset | No |
Generator GRDMT Details Operating September 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 4.4 MW |
| Summer Capacity | 4.4 MW |
| Winter Capacity | 4.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 5.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BAKUP Details Operating June 2019
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BKST2 Details Operating June 2019
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator BLKST Details Operating June 2019
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CHPP Details Operating June 2019
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 3.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 3.5 MW |
| Winter Capacity | 3.5 MW |
| Minimum Load | 2.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
MCRD Parris Island PV Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator BAKUP | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator BKST2 | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator BLKST | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator CARPT | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator CHPP | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator GRDMT | 100.00% |
| MCRD Parris Island / U.S. Marine Corps | 283 Blvd De France, Parris Island, SC 29905 | Generator TBESS | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1331 | Caterpillar | Lafayette, IN | 23.3 GWh |
| #1332 | FirstEnergy Harrison Power Station | Haywood, WV | 10.1 TWh |
| #1333 | Herbert A Wagner | Baltimore, MD | 206.2 GWh |
| #1334 | Sherman Avenue | Vineland, NJ | 25.7 GWh |
| #1335 | Gaylord - Wolverine | Gaylord, MI | 23.1 GWh |
| #1336 | Yuba City Cogen Partners | Yuba City, CA | 22.9 GWh |
| #1337 | Village Creek Water Reclamation Facility | Arlington, TX | 22.9 GWh |
| #1338 | Hutchinson Energy Center | Hutchinson, KS | 29.1 GWh |
| #1339 | Ponca City | Ponca City, OK | 22.6 GWh |
| #1340 | EQX011 Duane Fuel Cell | Santa Clara, CA | 22.5 GWh |
| #1342 | Kings Plaza Total Energy Plant (TEP) | Brooklyn, NY | 22.4 GWh |
| #1343 | Stuart (OK) | McAlester, OK | 22.3 GWh |
| #1344 | Yankee Street | Centerville, OH | 23.2 GWh |
| #1345 | West Groton CHP | Groton, MA | 22.0 GWh |
| #1346 | Tesoro Mandan Cogeneration Plant | Mandan, ND | 55.6 GWh |
| #1347 | Potter Station 2 | Braintree, MA | 23.3 GWh |
| #1348 | Pleasant Hill | Pleasant Hill, IA | 21.9 GWh |
| #1349 | Riverview Energy Center | Antioch, CA | 21.9 GWh |
| #1350 | Brandon Station | Lubbock, TX | 21.7 GWh |
| #1351 | POET Biorefining - Jewell | Jewell, IA | 21.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MCRD Parris Island PV Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bobby C Smith Jr Energy Facility | Rincon, GA | 3.0 TWh | 34.6 mi |
| Colleton Solar Farm | Walterboro, SC | 3.4 GWh | 40.3 mi |
| Hilton Head | Hilton Head Island, SC | 700.0 MWh | 8.3 mi |
| IKEA Savannah 490 | Port Wentworth, GA | 1.8 GWh | 29.9 mi |
| Imperial Savannah LP | Port Wentworth, GA | 52.8 GWh | 29.3 mi |
| International Paper Savanna Mill | Savannah, GA | 633.3 GWh | 29.7 mi |
| Jasper | Hardeeville, SC | 3.4 TWh | 25.2 mi |
| McIntosh | Rincon, GA | 38.7 GWh | 27.7 mi |
| McIntosh Combined Cycle Facility | Rincon, GA | 8.1 TWh | 28.5 mi |
| McIntosh Solar | Rincon, GA | 9.5 GWh | 27.9 mi |
| Moffett Solar Project | Ridgeland, SC | 135.5 GWh | 26.7 mi |
| Port Wentworth Mill | Port Wentworth, GA | 421.0 GWh | 29.6 mi |
| Ridgeland Solar Project | Ridgeland, SC | 19.9 GWh | 18.1 mi |
| Rincon Solar I | Rincon, GA | 25.2 GWh | 34.5 mi |
| Savannah River Mill | Rincon, GA | 133.4 GWh | 29.6 mi |
| SCE&G Nimitz CSG | Ridgeland, SC | 13.8 GWh | 19.2 mi |
| Seabrook Solar | Seabrook, SC | 85.3 GWh | 16.5 mi |
| Superior Landfill Gas Recovery | Savannah, GA | 50.0 GWh | 39.6 mi |
| Trask East Solar | Beaufort, SC | 27.6 GWh | 10.2 mi |
| Yemassee Solar | Yemassee, SC | 19.7 GWh | 28.7 mi |