Belfast Road, Stoney Creek, NC 27530Plant Summary Information
Highwater Solar I is ranked #232 out of 739 solar farms in North Carolina in terms of total annual net electricity generation.
Highwater Solar I generated 2.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Highwater Solar I |
---|---|
Utility Name | Cypress Creek Renewables |
Location | Wayne County, NC |
Initial Operation Date | December 2015 |
Last Update | Dec 2022 |
Annual Generation | 9.8 GWh |
Annual Consumption | 36.2 k MMBtu |
Ranked #5,988 out of 11,455 Power Plants Nationwide | |
Ranked #1,515 out of 5,173 Solar Power Plants Nationwide | |
Ranked #309 out of 860 North Carolina Power Plants | |
Ranked #232 out of 739 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Highwater Solar I (2014 to 2015) Cypress Creek Renewables (2016 to 2022) |
Map of Highwater Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Highwater Solar I.
Monthly Net Generation for Highwater Solar I
Highwater Solar I Details
Summary Information | |
---|---|
Plant Name | Highwater Solar I (59487) |
Plant Address | Belfast Road Stoney Creek, NC 27530 |
Utility | Cypress Creek Renewables (61060) |
Latitude, Longitude | 35.43389, -77.99 |
Generation Dates on File | Jan 2016 to Dec 2022 |
Initial Operation Date | December 2015 |
Annual Generation | 9.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-525 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator HIGHW Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.9 MW |
Summer Capacity | 4.9 MW |
Winter Capacity | 4.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Highwater Solar I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1505 | Millikan Farm | Randleman, NC | 9.9 GWh |
#1506 | SoINCPower5, LLC | Battleboro, NC | 9.9 GWh |
#1507 | Aulander Hwy 42 Solar, LLC | Aulander, NC | 9.9 GWh |
#1508 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.0 GWh |
#1509 | Langley PV1 | Elm City, NC | 9.9 GWh |
#1510 | Vasquez V CSG | Platteville, CO | 9.9 GWh |
#1511 | Outback Solar At Christmas Valley | Christmas Valley, OR | 9.9 GWh |
#1512 | Mt Olive Farm 2 | Mt Olive, NC | 9.9 GWh |
#1513 | Jacobson 5 MW Solar | Kingman, AZ | 9.8 GWh |
#1514 | Bearford Solar II | Burgaw, NC | 9.8 GWh |
#1516 | AVS Lancaster 1 | Lancaster, CA | 9.8 GWh |
#1517 | Winton Solar | Winton, NC | 9.8 GWh |
#1518 | Jersey Holdings | Lumberton, NC | 9.8 GWh |
#1519 | St. Pauls Solar 2 | St. Pauls, NC | 9.8 GWh |
#1520 | TPE Hopkins Solar Holdings1, LLC | West Greenwhich, RI | 9.8 GWh |
#1521 | Hemlock Solar | Garysburg, NC | 9.8 GWh |
#1522 | Hopkins Hill CSG | West Greenwich, RI | 9.8 GWh |
#1523 | Tiburon Holdings | Advance, NC | 9.8 GWh |
#1524 | Carter PV1 | Fayetteville, NC | 9.8 GWh |
#1525 | Gates Solar LLC | Eure, NC | 9.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Highwater Solar I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AM Best Farm | Goldsboro, NC | 9.6 GWh | 1.1 mi |
Cookstown | Goldsboro, NC | 10.7 GWh | 0.9 mi |
East Wayne Solar LLC | Goldsboro, NC | 3.9 GWh | 7.9 mi |
Fremont Farm LLC | Fremont, NC | 9.8 GWh | 6.9 mi |
Jester Solar | Goldsboro, NC | 10.5 GWh | 7.7 mi |
Lane II Solar, LLC | Goldsboro, NC | 11.4 GWh | 4.3 mi |
Lane Solar | Goldsboro, NC | 10.4 GWh | 4.4 mi |
Lee Combined Cycle Plant | Goldsboro, NC | 6.9 TWh | 7 mi |
Millers Chapel Solar | La Grange, NC | 9.3 GWh | 7.3 mi |
Oakwood Solar | Mebane, NC | 10.8 GWh | 10.5 mi |
Overman Solar | Goldsboro, NC | 11.4 GWh | 10.5 mi |
Pikeville Farm | Pikeville, NC | 10.8 GWh | 3.1 mi |
Rosewood Solar | Goldsboro, NC | 4.2 GWh | 6.6 mi |
Sonne One | Goldsboro, NC | 9.7 GWh | 8.8 mi |
Suncaster, LLC | Pikeville, NC | 4.9 GWh | 5 mi |
Terreva Wayne County RNG, LLC | Dudley, NC | 9.9 GWh | 11 mi |
Wayne County | Goldsboro, NC | 574.3 GWh | 7.3 mi |
Wayne Solar II LLC | Goldsboro, NC | 8.7 GWh | 9.6 mi |
Wayne Solar III LLC | Goldsboro, NC | 8.2 GWh | 10.1 mi |
Wedge | Goldsboro, NC | 11.2 GWh | 4.2 mi |