Luther College Wind Project
2555 U.S. Highway 52, Decorah, IA 52101Plant Summary Information
Luther College Wind Project is ranked #121 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Luther College Wind Project generated 868.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Luther College Wind Project |
|---|---|
| Utility Name | Luther College Wind Energy Project LLC |
| Location | Winneshiek County, IA |
| Initial Operation Date | October 2011 |
| Last Update | Dec 2024 |
| Annual Generation | 2.7 GWh |
| Annual Consumption | 9.1 k MMBtu |
| Ranked #9,791 out of 12,539 Power Plants Nationwide | |
| Ranked #1,303 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #180 out of 279 Iowa Power Plants | |
| Ranked #121 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
Map of Luther College Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Luther College Wind Project.
Monthly Net Generation for Luther College Wind Project
Luther College Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Luther College Wind Project (58407) |
| Plant Address | 2555 U.S. Highway 52, Decorah, IA 52101 |
| Utility | Luther College Wind Energy Project LLC (58389) |
| Latitude, Longitude | 43.32694, -91.81083 |
| Generation Dates on File | Jan 2013 to Dec 2024 |
| Initial Operation Date | October 2011 |
| Annual Generation | 2.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF11-509-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Interstate Power and Light Co (9417) IA |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
Generator WTG01 Details Operating October 2011
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2011 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.6 XLE |
| Design Wind Speed | 16 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Luther College Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1293 | Foundation Cemex BMQ | Apple Valley, CA | 3.3 GWh |
| #1294 | Windwalkers LLC | Kensett, IA | 3.2 GWh |
| #1295 | Foundation Cemex River Plant | Victorville, CA | 3.1 GWh |
| #1296 | Harpster Wind | Harpster, OH | 3.1 GWh |
| #1297 | Marshall Wind 6 LLC | Marshall, MN | 3.0 GWh |
| #1298 | Kotzebue Hybrid | Kotzebue, AK | 19.4 GWh |
| #1299 | Town of Otis Wind Energy Project | Otis, MA | 2.8 GWh |
| #1300 | WED Coventry 5 | Coventry, RI | 2.8 GWh |
| #1301 | Seneca Nation Cattaraugus Wind Turbine | Irving, NY | 2.8 GWh |
| #1302 | Phoenix Wind Power LLC | North Palm Springs, CA | 2.8 GWh |
| #1304 | St. Olaf Wind Turbine | Northfield, MN | 2.6 GWh |
| #1305 | Eolos Wind Energy Research Field Station | Rosemount, MN | 2.6 GWh |
| #1306 | Marshall Wind 1 LLC | Marshall, MN | 2.5 GWh |
| #1307 | Blue Breezes LLC | Blue Earth, MN | 2.4 GWh |
| #1308 | Blue Breezes II LLC | Blue Earth, MN | 2.4 GWh |
| #1309 | Mountain Lake | Mountain Lake, MN | 2.5 GWh |
| #1310 | Stahl Wind Energy | Pipestone, MN | 2.4 GWh |
| #1311 | WED Coventry 1 | Coventry, RI | 2.4 GWh |
| #1312 | WED NK Green | North Kingstown, RI | 2.4 GWh |
| #1313 | Swauk Wind LLC | Thorp, WA | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Luther College Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant SBD 9201 Norplex | Postville, IA | 40.2 MWh | 20.8 mi |
| Alliant SBD 9206 Donaldson | Cresco, IA | 5.9 MWh | 16.5 mi |
| Bluff Prairie (Vernon) | De Soto, WI | 2.7 GWh | 35.1 mi |
| Chickasaw Wind Farm | New Hampton, IA | 660.3 GWh | 28.9 mi |
| Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh | 33.7 mi |
| DPC Madison | Ridgeway, IA | 3.1 GWh | 7.4 mi |
| Fillmore County Solar Project | Spring Valley, MN | 75.6 GWh | 31.5 mi |
| Fountain | Fountain, MN | 6.3 GWh | 33.1 mi |
| Hawkeye Wind Farm | Sumner, IA | 173.3 GWh | 29 mi |
| Hazel | Lanesboro, MN | 6.1 GWh | 32.2 mi |
| Lanesboro | Lanesboro, MN | 184.0 MWh | 28.4 mi |
| McGregor | McGregor, IA | 7.0 MWh | 38.3 mi |
| New Hampton | New Hampton, IA | 676.0 MWh | 31.2 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 864.6 GWh | 41.7 mi |
| Preston (MN) | Preston, MN | 163.0 MWh | 27.1 mi |
| Rushford Village | Rushford Village, MN | 1.8 GWh | 33.2 mi |
| Saratoga Wind Farm | Lime Springs, IA | 272.3 GWh | 25.1 mi |
| Spring Valley | Spring Valley, MN | 156.8 MWh | 38.2 mi |
| Sumner | Sumner, IA | 175.0 MWh | 36.2 mi |
| Winona Community Solar One LLC | La Crescent, MN | 1.8 GWh | 44.1 mi |