Decatur Energy Center
2024 Highway Hwy 20, Decatur, AL 35601Plant Summary Information
Decatur Energy Center is ranked #8 out of 74 power plants in Alabama in terms of total annual net electricity generation.
Decatur Energy Center is comprised of 4 generators and generated 997.8 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Decatur Energy Center |
|---|---|
| Utility Name | Decatur Energy Center LLC |
| Location | Morgan County, AL |
| Initial Operation Date | June 2002 |
| Last Update | Aug 2025 |
| Annual Generation | 4.0 TWh |
| Annual Consumption | 33.9 M MMBtu |
| Ranked #292 out of 12,539 Power Plants Nationwide | |
| Ranked #151 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #8 out of 74 Alabama Power Plants | |
| Ranked #5 out of 36 Alabama Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Decatur Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Decatur Energy Center.
Monthly Net Generation for Decatur Energy Center
Decatur Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Decatur Energy Center (55292) |
| Plant Address | 2024 Highway Hwy 20, Decatur, AL 35601 |
| Utility | Decatur Energy Center LLC (2929) |
| Latitude, Longitude | 34.6292, -87.0214 |
| Generation Dates on File | Jun 2002 to Aug 2025 |
| Initial Operation Date | June 2002 |
| Annual Generation | 4.0 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Tennessee River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) AL |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | AMERICAN MIDSTREAM BAMAGAS LLC |
| Natural Gas Storage | No |
Generator CTG1 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 210.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 180 MW |
| Winter Capacity | 210 MW |
| Minimum Load | 66 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 210.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 180 MW |
| Winter Capacity | 210 MW |
| Minimum Load | 66 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating June 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 270 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 260 MW |
| Winter Capacity | 265 MW |
| Minimum Load | 30 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2002 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating June 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 210.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 180 MW |
| Winter Capacity | 210 MW |
| Minimum Load | 66 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Decatur Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #141 | Mesquite Generating Station Block 2 | Arlington, AZ | 4.1 TWh |
| #142 | Indeck Niles Energy Center | Niles, MI | 4.1 TWh |
| #143 | Fremont Energy Center | Fremont, OH | 4.1 TWh |
| #144 | Ontelaunee Energy Center | Reading, PA | 4.1 TWh |
| #145 | Cricket Valley Energy | Dover, NY | 4.1 TWh |
| #146 | Tracy | Sparks, NV | 4.0 TWh |
| #147 | Baytown Energy Center | Baytown, TX | 4.0 TWh |
| #148 | Liberty Electric Power Plant | Eddystone, PA | 4.0 TWh |
| #149 | Cane Island | Intercession City, FL | 4.0 TWh |
| #150 | Astoria Energy | New York, NY | 4.1 TWh |
| #152 | Lowman Energy Center | Leroy, AL | 4.0 TWh |
| #153 | Dell Power Station | Dell, AR | 3.9 TWh |
| #154 | Cosumnes | Herald, CA | 3.9 TWh |
| #155 | Long Ridge Energy Generation | Hannibal, OH | 3.9 TWh |
| #156 | Pastoria Energy Facility, LLC | Lebec, CA | 3.9 TWh |
| #157 | Green Country Energy LLC | Jenks, OK | 3.8 TWh |
| #158 | Asheville | Arden, NC | 3.8 TWh |
| #159 | Fort St Vrain | Platteville, CO | 3.8 TWh |
| #160 | Lansing Smith | Southport, FL | 3.8 TWh |
| #161 | Green Power 2 | Texas City, TX | 3.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Decatur Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABC Coke | Tarrant, AL | 9.0 MWh | 73.6 mi |
| Browns Ferry | Decatur, AL | 29.3 TWh | 7.6 mi |
| Colbert | Tuscumbia, AL | 320.6 GWh | 47.7 mi |
| Cumblerland Land Holdings, LLC | Elkmont, AL | 27.2 GWh | 23.8 mi |
| Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 9.6 GWh | 4.5 mi |
| Elora Solar | Elora, TN | 318.4 GWh | 48.8 mi |
| Guntersville | Guntersville, AL | 454.8 GWh | 38.5 mi |
| James H Miller Jr | Quinton, AL | 18.9 TWh | 68.9 mi |
| Lewis Smith Dam | Jasper, AL | 219.0 GWh | 47.8 mi |
| Morgan Energy Center | Decatur, AL | 4.8 TWh | 2.5 mi |
| Muscle Shoals | Cherokee, AL | 431.2 GWh | 51.1 mi |
| Pickwick Landing Dam | Pickwick Dam, TN | 1.3 TWh | 76 mi |
| Redstone Arsenal Hybrid | Huntsville, AL | 16.9 GWh | 23.3 mi |
| River Bend Solar, LLC (AL) | Florence, AL | 151.5 GWh | 48.7 mi |
| Sand Valley Power Station | Collinsville, AL | 27.2 GWh | 68.7 mi |
| SR Bell Buckle | Shelbyville, TN | 69.9 GWh | 72.3 mi |
| TAI Huntsville Solar Hybrid | Huntsville, AL | 62.9 GWh | 26.2 mi |
| Tims Ford | Winchester, TN | 37.3 GWh | 57.5 mi |
| Wheeler Dam | Town Creek, AL | 1.2 TWh | 23.9 mi |
| Wilson Dam | Muscle Shoals, AL | 2.6 TWh | 36.2 mi |