Deer Park Energy Center
5665 Highway 225, Deer Park, TX 77536Plant Summary Information
Deer Park Energy Center is ranked #46 out of 2,284 natural gas power plants nationwide in terms of total annual net electricity generation.
Deer Park Energy Center is comprised of 6 generators and generated 2.5 TWh during the 3-month period between November 2023 to February 2024.
Plant Name | Deer Park Energy Center |
---|---|
Utility Name | Deer Park Energy Center |
Location | Harris County, TX |
Initial Operation Date | June 2003 |
Last Update | Feb 2024 |
Annual Generation | 7.6 TWh |
Annual Consumption | 79.2 M MMBtu |
Ranked #127 out of 11,455 Power Plants Nationwide | |
Ranked #46 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #14 out of 726 Texas Power Plants | |
Ranked #8 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Deer Park Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Deer Park Energy Center.
Monthly Net Generation for Deer Park Energy Center
Deer Park Energy Center Details
Summary Information | |
---|---|
Plant Name | Deer Park Energy Center (55464) |
Plant Address | 5665 Highway 225 Deer Park, TX 77536 |
Utility | Deer Park Energy Center (4994) |
Latitude, Longitude | 29.71341, -95.13451 |
Generation Dates on File | Aug 2003 to Feb 2024 |
Initial Operation Date | June 2003 |
Annual Generation | 7.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Municipality-CIWA |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
ENTERPRISE TEXAS PIPELINE KINDER MORGAN TEXAS PIPELINE LLC ENERGY TRANSFER FUEL LP |
Pipeline Notes | 4TH LINE NEEDED FOR "TEJAS GAS" |
Natural Gas Storage | No |
Generator CTG1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DDPEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC_CC1 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 186.8 MW |
Winter Capacity | 201.2 MW |
Minimum Load | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DDPEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC_CC1 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 186.8 MW |
Winter Capacity | 201.2 MW |
Minimum Load | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DDPEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC_CC1 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 186.8 MW |
Winter Capacity | 201.2 MW |
Minimum Load | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2004 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG4 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DDPEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC_CC1 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 186.8 MW |
Winter Capacity | 201.2 MW |
Minimum Load | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2004 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating June 2004
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | DDPEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC_CC1 |
Nameplate Capacity | 276 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 282 MW |
Winter Capacity | 282 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2004 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG6 Details Operating June 2014
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | DDPEC CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DDPEC CC1 |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 186.8 MW |
Winter Capacity | 201.2 MW |
Minimum Load | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2014 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Deer Park Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#36 | Indeck Niles Energy Center | Niles, MI | 7.9 TWh |
#37 | CPV Fairview Energy Center | Johnstown, PA | 7.9 TWh |
#38 | Jackson Generation, LLC | Elwood, IL | 7.8 TWh |
#39 | Riviera | Riviera Beach, FL | 7.8 TWh |
#40 | Panda Temple Power Station | Temple, TX | 7.8 TWh |
#41 | Wolf Hollow II | Granbury, TX | 7.6 TWh |
#42 | Odessa-Ector Power Plant | Odessa, TX | 7.6 TWh |
#43 | Guadalupe Generating Station | Marion, TX | 7.6 TWh |
#44 | Cape Canaveral | Cocoa, FL | 7.6 TWh |
#45 | Chouteau | Pryor, OK | 7.6 TWh |
#47 | Chuck Lenzie Generating Station | Apex, NV | 7.5 TWh |
#48 | Paradise | Drakesboro, KY | 7.4 TWh |
#49 | Brunswick County Power Station | Freeman, VA | 7.3 TWh |
#50 | Tenaska Westmoreland Generating Station | Smithton, PA | 7.2 TWh |
#51 | Manatee | Parrish, FL | 7.2 TWh |
#52 | Seminole (FL) | Palatka, FL | 10.8 TWh |
#53 | Oregon Clean Energy Center | Oregon, OH | 7.1 TWh |
#54 | Hamilton Patriot Generation Plant | Montgomery, PA | 7.0 TWh |
#55 | Turkey Point | Homestead, FL | 21.7 TWh |
#56 | Lake Side Power Plant | Vineyard, UT | 7.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Deer Park Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayou Cogen Plant | Pasadena, TX | 2.5 TWh | 8.2 mi |
Channel Energy Center LLC | Pasadena, TX | 4.5 TWh | 5.9 mi |
Channelview Cogeneration Plant | Channelview, TX | 5.5 TWh | 8.6 mi |
Exelon LaPorte Generating Station | LaPorte, TX | 188.8 GWh | 3.8 mi |
ExxonMobil Baytown Refinery | Baytown, TX | 1.3 TWh | 8.7 mi |
ExxonMobil Baytown Turbine | Baytown, TX | 2.8 TWh | 8.1 mi |
Greens Bayou | Houston, TX | 212.7 GWh | 9.1 mi |
Houston Chemical Complex Battleground | Houston, TX | 1.9 TWh | 3.3 mi |
Houston Plant | Houston, TX | 65.7 GWh | 8.2 mi |
Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.9 TWh | 7.3 mi |
Pasadena Cogeneration | Pasadena, TX | 5.1 TWh | 2.6 mi |
Rentech Nitrogen Pasadena Cogeneration | Pasadena, TX | 88.4 GWh | 4 mi |
San Jacinto Steam Electric Station | La Porte, TX | 795.7 GWh | 5.8 mi |
Shell Deer Park | Deer Park, TX | 1.6 TWh | 0.8 mi |
Texas Petrochemicals | Houston, TX | 238.2 GWh | 7.3 mi |
WAL2724 | Pasadena, TX | 274.7 MWh | 4.8 mi |
WAL3425 | Houston, TX | 290.0 MWh | 8.4 mi |
WAL3500 | Houston, TX | 276.2 MWh | 6.7 mi |
WAL5116 | Deer Park, TX | 374.4 MWh | 4 mi |
WAL752 | Pasadena, TX | 226.7 MWh | 4.9 mi |