Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.8 GWh | Jan 2023 | Dec 2024 | Solar |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2021 | Dec 2024 | Other Biomass Gas : 91.7% Natural Gas : 8.3% |
| OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 1.0 GWh | Mar 2024 | Dec 2024 | Solar |
| San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2020 | Dec 2024 | Natural Gas |
| County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2015 | Dec 2023 | Natural Gas |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2016 | Dec 2024 | Natural Gas |
| Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 29.4 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2021 | Dec 2024 | Solar |
| Border Hybrid Energy Center | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 14.8 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 5.5 GWh | May 2005 | Feb 2026 | Natural Gas |
| Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 1.4 TWh | Sep 2009 | Feb 2026 | Natural Gas |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 65.9 GWh | Oct 2016 | Dec 2024 | Natural Gas |
| San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 55.6 GWh | Aug 2002 | Feb 2026 | Natural Gas : 97.2% Solar : 2.8% |
| Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
| Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 30.1 GWh | May 1985 | Feb 2026 | Other Biomass Gas |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.6 GWh | Mar 2000 | Feb 2026 | Natural Gas : 99.9% |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 2003 | Jan 2026 | Natural Gas |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 74.5 GWh | Sep 1983 | Feb 2026 | Natural Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 46.1 GWh | Jun 1997 | Dec 2024 | Landfill Gas : 91.9% Other Biomass Gas : 8.1% |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 23.6 GWh | Jun 2005 | Feb 2026 | Natural Gas |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| ISH Solar Hospital SDMC | SunEdison LLC | San Diego, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2024 | Solar |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2001 | Feb 2026 | Natural Gas |
| Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 4.8 GWh | Feb 1986 | Jun 2024 | Water |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Route 66 Energy Center, LLC | Route 66 Energy Center, LLC | San Fidel, NM | Public Service Company of New Mexico (PNM) | 131.6 GWh | Apr 2022 | Feb 2026 | Solar |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 66.2 GWh | Dec 1995 | Feb 2026 | Natural Gas |
| SF Southeast Cogen Plant | City & County of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2002 | Dec 2024 | Other Biomass Gas |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2022 | Dec 2024 | Solar |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.2 GWh | Jun 2021 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Caprock Solar 1 LLC | Duke Energy Renewables Services | San Jon, NM | Southwest Power Pool (SWPP) | 57.0 GWh | Nov 2016 | Feb 2026 | Solar |
| Caprock Wind Farm | Leeward Asset Management, LLC | San Jon, NM | Southwest Power Pool (SWPP) | 279.0 GWh | Nov 2004 | Sep 2024 | Wind |
| SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 82.8 GWh | Jan 1953 | Feb 2026 | Natural Gas : 52.9% Other Biomass Gas : 47.0% |
| Metcalf Energy Center | Calpine Corp - Metcalf Energy Center | San Jose, CA | California Independent System Operator (CISO) | 2.1 TWh | May 2005 | Feb 2026 | Natural Gas |
| Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 152.2 GWh | Jan 2003 | Feb 2026 | Natural Gas |
| San Jose Cogeneration | San Jose State University Fclts Dev &Ops | San Jose, CA | California Independent System Operator (CISO) | 34.8 GWh | Nov 1984 | Feb 2026 | Natural Gas |
| Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 1990 | Dec 2024 | Natural Gas |
| CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.6 GWh | Apr 2019 | Jun 2024 | Natural Gas |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2019 | Mar 2024 | Natural Gas |
| SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2024 | Natural Gas |
| Beckton Dickenson - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2016 | Jul 2024 | Natural Gas |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2013 | Dec 2024 | Natural Gas |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Jul 2014 | Dec 2024 | Natural Gas |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Jan 2012 | Dec 2024 | Natural Gas |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.3 GWh | May 2016 | Dec 2024 | Natural Gas |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| HEB00038 | Texas Microgrid, LLC | San Juan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 244.0 MWh | Mar 2018 | Dec 2024 | Natural Gas |
| KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 15.7 GWh | Mar 2018 | Dec 2024 | Natural Gas |
| Preferred Freezer San Leandro | Powerflex | San Leandro, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2017 | Dec 2023 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2021 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| Hays Energy Project | Hays Energy, LLC | San Marcos, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 5.4 TWh | Mar 2002 | Feb 2026 | Natural Gas |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Tupelo Solar | FRP Tupelo Solar, LLC | San Mateo, FL | Florida Power & Light Co. (FPL) | 192.0 GWh | Oct 2024 | Feb 2026 | Solar |
| Alta Sea | Signal Street Operating, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Westmont 300A | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Feb 2017 | Dec 2024 | Solar |
| Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 GWh | Sep 2015 | Dec 2024 | Solar |
| Westmont 300B | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Magic Valley Wind Farm I LLC | Big Sky Wind, LLC | San Perlita, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 483.7 GWh | Aug 2012 | Feb 2026 | Wind |
| El Sauz Ranch Wind, LLC | El Sauz Ranch Wind, LLC | San Perlita, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 829.7 GWh | - | Feb 2026 | Wind |
| Dunns Bridge II Solar | Dunns Bridge II Solar and Storage Generation LLC | San Pierre, IN | Midcontinent Independent System Operator, Inc. (MISO) | 811.1 GWh | - | Feb 2026 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |