Tri-County Water Hydropower Project
31297 Highway 550, Ridgway, CO 81432Plant Summary Information
Tri-County Water Hydropower Project is ranked #17 out of 45 hydroelectric power plants in Colorado in terms of total annual net electricity generation.
Tri-County Water Hydropower Project is comprised of 2 generators and generated 5.3 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Tri-County Water Hydropower Project |
---|---|
Utility Name | Tri-County Water Conservancy District |
Location | Ouray County, CO |
Initial Operation Date | April 2014 |
Last Update | May 2025 |
Annual Generation | 17.6 GWh |
Annual Consumption | 67.0 k MMBtu |
Ranked #5,362 out of 12,312 Power Plants Nationwide | |
Ranked #780 out of 1,323 Water Power Plants Nationwide | |
Ranked #104 out of 283 Colorado Power Plants | |
Ranked #17 out of 45 Colorado Water Power Plants | |
Fuel Types | Water |
Map of Tri-County Water Hydropower Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tri-County Water Hydropower Project.
Monthly Net Generation for Tri-County Water Hydropower Project
Tri-County Water Hydropower Project Details
Summary Information | |
---|---|
Plant Name | Tri-County Water Hydropower Project (58901) |
Plant Address | 31297 Highway 550, Ridgway, CO 81432 |
Utility | Tri-County Water Conservancy District (58771) |
Latitude, Longitude | 38.23917, -107.75806 |
Generation Dates on File | Apr 2014 to May 2025 |
Initial Operation Date | April 2014 |
Annual Generation | 17.6 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Ridgway Reservoir |
Ash Impoundment | No |
Transmission / Distribution Owner | Tri-State G & T Assn, Inc (30151) |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator TCWG1 Details Operating April 2014
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 7.2 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 2.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator TCWG2 Details Operating April 2014
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Tri-County Water Hydropower Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#770 | Wailuku River Hydroelectric | Hilo, HI | 18.5 GWh |
#771 | Cove Hydroelectric | Burney, CA | 18.4 GWh |
#772 | Pioneer | Ogden, UT | 18.3 GWh |
#773 | Nacimiento Hydro Project | Bradley, CA | 18.2 GWh |
#774 | Guernsey | Guernsey, WY | 18.0 GWh |
#775 | Island Park | Island Park, ID | 17.9 GWh |
#776 | PEC Headworks | Moses Lake, WA | 17.8 GWh |
#777 | International Paper Riley Hydro | Jay, ME | 17.7 GWh |
#778 | Shoshone (WY) | Cody, WY | 17.6 GWh |
#779 | Haypress | Sierra City, CA | 17.6 GWh |
#781 | Spaulding 1 | Emigrant Gap, CA | 17.6 GWh |
#782 | Moline | Moline, IL | 18.6 GWh |
#783 | Oakdale | Monticello, IN | 17.4 GWh |
#784 | International Paper Livermore Hydro | Livermore Falls, ME | 17.3 GWh |
#785 | Spirit Mountain | Cody, WY | 17.3 GWh |
#786 | Rolfe Canal Hydro | Penacook, NH | 17.3 GWh |
#787 | Rapide Croche | Kaukana, WI | 17.2 GWh |
#788 | Calligan Creek Hydroelectric Project | Snoqualmie, WA | 17.2 GWh |
#789 | Buchanan Dam (TX) | Buchanan Dam, TX | 17.1 GWh |
#790 | Deep Creek | Oakland, MD | 17.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tri-County Water Hydropower Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ames Hydro | Ophir, CO | 6.6 GWh | 26.7 mi |
Ash Mesa Solar, LLC | Olathe, CO | 19.3 GWh | 32 mi |
Blue Mesa | Gunnison, CO | 246.8 GWh | 27.2 mi |
Crystal | Montrose, CO | 144.3 GWh | 20.1 mi |
Drop 5 | Montrose, CO | 9.3 GWh | 11.8 mi |
Lower Molina | Molina, CO | 12.1 GWh | 67.7 mi |
McPhee | Cortez, CO | 6.1 GWh | 63.9 mi |
Mesa CSG 2 Massicotte | Palisade, CO | 3.3 GWh | 66.1 mi |
Morrow Point | Montrose, CO | 309.8 GWh | 18.9 mi |
Oak Leaf Solar XXXI LLC (CSG) | Debeque, CO | 3.4 GWh | 69.5 mi |
Shavano Falls Hydro | Montrose, CO | 12.0 GWh | 21.9 mi |
Shavano Falls Hydro Drop 4 | Montrose, CO | 23.0 GWh | 14.6 mi |
SMPA Solar 1 Community Solar | Bedrock, CO | 1.8 GWh | 55.8 mi |
South Canal Hydro-1 | Montrose, CO | 18.9 GWh | 16.9 mi |
South Canal Hydro-3 | Montrose, CO | 14.2 GWh | 16 mi |
Tacoma | Durango, CO | 957.0 MWh | 49.5 mi |
Upper Molina | Molina, CO | 23.8 GWh | 63.9 mi |
USS Fruita Solar LLC CSG | Fruita, CO | 7.4 GWh | 69 mi |
Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 60.3 mi |
Vinelands Power Plant | Palisade, CO | 15.6 GWh | 67.5 mi |