910 1100E, Mount Sterling, IL 62353Plant Summary Information
Brown County Wind Turbine is ranked #59 out of 59 wind farms in Illinois in terms of total annual net electricity generation.
Brown County Wind Turbine generated 2.0 MWh during the 3-month period between November 2024 to February 2025.
| Plant Name | Brown County Wind Turbine |
|---|---|
| Utility Name | Adams Electric Cooperative |
| Location | Brown County, IL |
| Initial Operation Date | September 2011 |
| Last Update | Feb 2025 |
| Annual Generation | 3.0 MWh |
| Annual Consumption | 9 MMBtu |
| Ranked #13,058 out of 13,081 Power Plants Nationwide | |
| Ranked #1,365 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #481 out of 483 Illinois Power Plants | |
| Ranked #59 out of 59 Illinois Wind Power Plants | |
| Fuel Types | Wind |
Map of Brown County Wind Turbine
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brown County Wind Turbine.
Monthly Net Generation for Brown County Wind Turbine
Monthly Plant Fuel Consumption for Brown County Wind Turbine
Brown County Wind Turbine Details
| Summary Information | |
|---|---|
| Plant Name | Brown County Wind Turbine (57767) |
| Plant Address | 910 1100E, Mount Sterling, IL 62353 |
| Utility | Adams Electric Cooperative (57077) |
| Latitude, Longitude | 39.97333, -90.69917 |
| Generation Dates on File | Sep 2011 to Feb 2025 |
| Initial Operation Date | September 2011 |
| Annual Generation | 3.0 MWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Adams Electric Coop (97) IL |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details OA September 2011
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | NA |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NA |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | OA |
| First Operation Date | September 2011 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | VENSYS |
| Predominant Turbine Model Number | VENSYS77 |
| Design Wind Speed | 16.5 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 281 |
Brown County Wind Turbine Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1346 | WCROC Wind Farm | Morris, MN | 1.5 GWh |
| #1347 | ZCO | Tehachapi, CA | 1.4 GWh |
| #1348 | Charlestown Wind Turbine | Charlestown, MA | 1.3 GWh |
| #1349 | Marshall Wind 1 LLC | Marshall, MN | 1.2 GWh |
| #1350 | Vestas Towers America, Inc. | Pueblo, CO | 1.2 GWh |
| #1351 | Euclid Farm, Stamco N-54 | Euclid, OH | 1.1 GWh |
| #1352 | Snake River | Nome, AK | 31.9 GWh |
| #1353 | Deer Island Treatment Plant | Winthrop, MA | 33.2 GWh |
| #1354 | Foundation Superior Farms | Dixon, CA | 875.0 MWh |
| #1355 | Moorhead Wind Turbine | Moorhead, MN | 809.0 MWh |
| #1356 | Madison Windpower LLC | Madison, NY | 543.0 MWh |
| #1357 | Minwind | Luverne, MN | 516.0 MWh |
| #1358 | Foundation IE | Rancho Cucamonga, CA | 404.0 MWh |
| #1359 | Iowa Lakes Community College Wind Farm | Estherville, IA | 374.0 MWh |
| #1360 | Pike County Wind Power | Pittsfield, IL | 334.0 MWh |
| #1361 | Harbec Energy | Ontario, NY | 365.0 MWh |
| #1362 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 294.0 MWh |
| #1363 | PaTu Wind Farm LLC | Wasco, OR | 108.0 MWh |
| #1364 | Noble Ridge LLC | Wilmont, MN | 61.0 MWh |
| #1366 | Jiminy Peak Wind QF | Hancock, MA | 2.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brown County Wind Turbine.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alsey | Alsey, IL | 34.7 GWh | 31.2 mi |
| Bushnell | Bushnell, IL | 78.0 MWh | 40.9 mi |
| Cardinal Point Wind | Sciota, IL | 521.4 GWh | 42.6 mi |
| Cass County Renewable Energy Center | Beardstown, IL | 305.9 GWh | 12.1 mi |
| JM Huber at Quincy | Quincy, IL | 2.1 GWh | 38 mi |
| Lincoln Land Wind | TBD, IL | 1.0 TWh | 40.8 mi |
| Macomb 2A | Macomb, IL | 4.2 GWh | 33.2 mi |
| McDonough Solar 1, LLC CSG | Blandinsville, IL | 3.9 GWh | 41 mi |
| Moraine Sands Wind Power | Mason City, IL | 562.0 GWh | 44.6 mi |
| Morgan Solar 1 CSG | Meredosia, IL | 4.0 GWh | 12.9 mi |
| Morgan Solar 1b CSG | Meredosia, IL | 3.5 GWh | 13 mi |
| Morgan Solar 2, LLC CSG | Murrayville, IL | 4.1 GWh | 35.6 mi |
| Morgan Solar 4, LLC CSG | Murrayville, IL | 4.0 GWh | 35.5 mi |
| Panther Creek Wind Project | Pittsfield, IL | 149.8 GWh | 26.1 mi |
| Pearl Station | Pearl, IL | 64.0 MWh | 36.5 mi |
| Pike County Wind Power | Pittsfield, IL | 334.0 MWh | 25.7 mi |
| Pleasantville Solar Park | Ipava, IL | 178.8 GWh | 32.2 mi |
| Prairie Creek Solar | Jacksonville, IL | 57.8 GWh | 27.7 mi |
| Sullivan B Community Solar LLC | Macomb, IL | 3.9 GWh | 34.4 mi |
| Wolf Run Solar | Chapin, IL | 305.3 GWh | 21.9 mi |