Brown County Wind Turbine

910 1100E, Mount Sterling, IL 62353

Plant Summary Information

Brown County Wind Turbine is ranked #59 out of 59 wind farms in Illinois in terms of total annual net electricity generation.

Brown County Wind Turbine generated 2.0 MWh during the 3-month period between November 2024 to February 2025.

Plant NameBrown County Wind Turbine
Utility NameAdams Electric Cooperative
LocationBrown County, IL
Initial Operation DateSeptember 2011
Last Update Feb 2025
Annual Generation 3.0 MWh
Annual Consumption 9 MMBtu
Ranked #13,259 out of 13,285 Power Plants Nationwide
Ranked #1,373 out of 1,374 Wind Power Plants Nationwide
Ranked #539 out of 542 Illinois Power Plants
Ranked #59 out of 59 Illinois Wind Power Plants
Fuel Types Wind

Map of Brown County Wind Turbine

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brown County Wind Turbine.

Create Your Account Today

Monthly Net Generation for Brown County Wind Turbine

Monthly Plant Fuel Consumption for Brown County Wind Turbine

Brown County Wind Turbine Details

Summary Information
Plant NameBrown County Wind Turbine (57767)
Plant Address910 1100E, Mount Sterling, IL 62353
UtilityAdams Electric Cooperative (57077)
Latitude, Longitude39.97333, -90.69917
Generation Dates on FileSep 2011 to Feb 2025
Initial Operation DateSeptember 2011
Annual Generation 3.0 MWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerAdams Electric Coop (97) IL
Grid Voltage 12.47 kV
Energy StorageNo

Generator 1 Details OA September 2011

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
RTO ISO LMP Node DesignationNA
RTO ISO Location Designation For Reporting Wholesale Sales DataNA
Nameplate Capacity1.5 MW
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Uprate/Derate Completed No
StatusOA
First Operation DateSeptember 2011
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWind
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Turbines/Hydrokinetic Buoys1
Time From Cold Shutdown To Full Load10M
Other Planned ModificationsNo
Multiple FuelsNo
Cofire FuelsNo
Turbine Details
Number Of Turbines1
Predominant Turbine ManufacturerVENSYS
Predominant Turbine Model NumberVENSYS77
Design Wind Speed16.5 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet281

Brown County Wind Turbine Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#1354Snake RiverNome, AK31.9 GWh
#1355Deer Island Treatment PlantWinthrop, MA31.9 GWh
#1356Hilltop PowerEdgerton, MN857.0 MWh
#1357Moorhead Wind TurbineMoorhead, MN809.0 MWh
#1358Foundation Superior FarmsDixon, CA766.0 MWh
#1359Madison Windpower LLCMadison, NY543.0 MWh
#1360Foundation IERancho Cucamonga, CA404.0 MWh
#1361Iowa Lakes Community College Wind FarmEstherville, IA374.0 MWh
#1362Pike County Wind PowerPittsfield, IL334.0 MWh
#1363TG Windfarm LLCPipestone, MN288.0 MWh
#1364Bisson Windfarm LLCPipestone, MN288.0 MWh
#1365Tofteland Windfarm LLCPipestone, MN288.0 MWh
#1366Westridge Windfarm LLCWoodstock, MN288.0 MWh
#1367MinwindLuverne, MN276.0 MWh
#1368Harbec EnergyOntario, NY365.0 MWh
#1369CG Windfarm LLCWoodstock, MN144.0 MWh
#1370TAC-Distributed Energy Resource HybridChampaign, IL294.0 MWh
#1371PaTu Wind Farm LLCWasco, OR108.0 MWh
#1372Noble Ridge LLCWilmont, MN61.0 MWh
#1374Jiminy Peak Wind QFHancock, MA2.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Brown County Wind Turbine.

Plant NamePlant LocationAnnual GenerationDistance
AlseyAlsey, IL34.7 GWh31.2 mi
BushnellBushnell, IL78.0 MWh40.9 mi
Cardinal Point WindSciota, IL525.2 GWh42.6 mi
Cass County Renewable Energy CenterBeardstown, IL307.9 GWh12.1 mi
JM Huber at QuincyQuincy, IL2.1 GWh38 mi
Lincoln Land WindTBD, IL1.0 TWh40.8 mi
Macomb 2AMacomb, IL4.2 GWh33.2 mi
McDonough Solar 1, LLC CSGBlandinsville, IL3.9 GWh41 mi
Morgan Solar 1 CSGMeredosia, IL4.0 GWh12.9 mi
Morgan Solar 1b CSGMeredosia, IL3.5 GWh13 mi
Morgan Solar 2, LLC CSGMurrayville, IL4.1 GWh35.6 mi
Morgan Solar 4, LLC CSGMurrayville, IL4.0 GWh35.5 mi
Panther Creek Wind ProjectPittsfield, IL151.1 GWh26.1 mi
Pearl StationPearl, IL64.0 MWh36.5 mi
Pike County Wind PowerPittsfield, IL334.0 MWh25.7 mi
Pleasantville Solar ParkIpava, IL258.8 GWh32.2 mi
Prairie Creek SolarJacksonville, IL58.8 GWh27.7 mi
Sullivan B Community Solar LLCMacomb, IL3.9 GWh34.4 mi
USS Clear Creek SolarVirginia, IL232.0 MWh25.5 mi
Wolf Run SolarChapin, IL308.8 GWh21.9 mi