Polaris Wind Park
5290 E Pierce Rd, North Star Township, MI 48847Plant Summary Information
Polaris Wind Park is ranked #29 out of 252 power plants in Michigan in terms of total annual net electricity generation.
Polaris Wind Park generated 151.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Polaris Wind Park |
---|---|
Utility Name | DTE Electric Company |
Location | Gratiot County, MI |
Initial Operation Date | May 2020 |
Last Update | Mar 2025 |
Annual Generation | 443.3 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,421 out of 11,623 Power Plants Nationwide | |
Ranked #406 out of 1,344 Wind Power Plants Nationwide | |
Ranked #29 out of 252 Michigan Power Plants | |
Ranked #7 out of 35 Michigan Wind Power Plants | |
Fuel Types | Wind |
Map of Polaris Wind Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Polaris Wind Park.
Monthly Net Generation for Polaris Wind Park
Polaris Wind Park Details
Summary Information | |
---|---|
Plant Name | Polaris Wind Park (62290) |
Plant Address | 5290 E Pierce Rd, North Star Township, MI 48847 |
Utility | DTE Electric Company (5109) |
Latitude, Longitude | 43.26261, -84.49984 |
Generation Dates on File | May 2020 to Mar 2025 |
Initial Operation Date | May 2020 |
Annual Generation | 443.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Transmission (56068) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating May 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 168.6 MW |
Summer Capacity | 168.6 MW |
Winter Capacity | 168.6 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 68 |
Turbine Details | |
Number Of Turbines | 68 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-127 |
Design Wind Speed | 13.2 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 292 |
Polaris Wind Park Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#396 | Glen Ullin Energy Center | Glen Ullin, ND | 453.5 GWh |
#397 | La Chalupa, LLC | Rio Hondo, TX | 452.8 GWh |
#398 | Chevelon Butte Phase 2 | Winslow, AZ | 452.6 GWh |
#399 | Rio Bravo Windpower, LLC | Roma, TX | 451.4 GWh |
#400 | Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh |
#401 | Top of the World Windpower Project | Glenrock, WY | 449.2 GWh |
#402 | Cimarron Wind Energy LLC | Cimmaron, KS | 448.0 GWh |
#403 | White Creek Wind Farm | Roosevelt, WA | 446.8 GWh |
#404 | Heartland Divide Wind Project, LLC | Melville, IA | 444.5 GWh |
#405 | Judith Gap Wind Energy Center | Harlowton, MT | 444.2 GWh |
#407 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 443.2 GWh |
#408 | Wellsburg Wind Project | Wellsburg, IA | 441.8 GWh |
#409 | Day County Wind LLC | Conde, SD | 441.2 GWh |
#410 | Adams Wind | Lenox, IA | 440.1 GWh |
#411 | Los Vientos Windpower IV | Rio Grande City, TX | 439.5 GWh |
#412 | Smoky Hills Wind Project Phase II | Lincoln, KS | 437.7 GWh |
#413 | Oliver Wind III, LLC | Mandan, ND | 434.2 GWh |
#414 | Pioneer Trail Wind Farm, LLC | Paxton, IL | 433.8 GWh |
#415 | Dunlap | Medicine Bow, WY | 432.0 GWh |
#416 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 431.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Polaris Wind Park.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beebe 1A | Ithaca, MI | 182.9 GWh | 0.4 mi |
Beebe 1B | Ithaca, MI | 119.0 GWh | 0.4 mi |
Bingham Solar, LLC | St. Johns, MI | 38.4 GWh | 17.4 mi |
Central Michigan University | Mt. Pleasant, MI | 25.5 GWh | 26.6 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 22.5 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 3.9 GWh | 22.3 mi |
Gratiot County Wind LLC | Breckenridge, MI | 228.1 GWh | 10.2 mi |
Gratiot Farms Wind Project | Carson City, MI | 375.2 GWh | 19.5 mi |
Gratiot Wind Park | Breckenridge, MI | 227.0 GWh | 11.8 mi |
Heartland Farms | Middleton, MI | 484.6 GWh | 7.5 mi |
Lyons Road | Owosso, MI | 36.9 GWh | 27.3 mi |
Meridian Wind Park | Merrill, MI | 506.4 GWh | 15.9 mi |
Midcontinent Solar, LLC | Owosso, MI | 795.0 MWh | 26.5 mi |
Midland Cogeneration Venture | Midland, MI | 10.3 TWh | 26.3 mi |
Pine River Wind Park | Shepherd, MI | 354.1 GWh | 20.6 mi |
Renaissance Power Plant | Carson City, MI | 1.0 TWh | 18.1 mi |
St Louis | St. Louis, MI | 175.0 MWh | 10.9 mi |
Stoneheart Solar, LLC | Saginaw, MI | 4.0 GWh | 30.4 mi |
Vestaburg | Vestaburg, MI | 1.4 GWh | 22.9 mi |
Webber | Lyons, MI | 11.1 GWh | 29.5 mi |