Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Louise Solar | Geronimo Power | Taopi, MN | Midcontinent Independent System Operator, Inc. (MISO) | 91.3 GWh | Nov 2024 | Aug 2026 | Solar |
| SV CSG Bishop 1 LLC | SunVest Solar LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 106.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Creston School Customer Hosted Solar | Interstate Power and Light Co | Creston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Jul 2025 | Dec 2025 | Solar |
| Pleasant Creek Unit 2 | Interstate Power and Light Co | Palo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 268.8 GWh | Nov 2024 | Aug 2026 | Solar |
| White Tail Solar | White Tail Solar, LLC | Milan, MI | Midcontinent Independent System Operator, Inc. (MISO) | 188.3 GWh | Oct 2025 | Aug 2026 | Solar |
| Heartwood Solar | Heartwood Solar, LLC | Allen, MI | Midcontinent Independent System Operator, Inc. (MISO) | 26.2 GWh | - | Jun 2026 | Solar |
| Towanda | Dimension Energy LLC | Shirley, IL | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Skyline | SunStrong Management, LLC | Taylorville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Liberty County Solar Project | Liberty County Solar Project, LLC | Dayton, TX | Midcontinent Independent System Operator, Inc. (MISO) | 248.4 GWh | Aug 2024 | Aug 2026 | Solar |
| Creston Solar (50 MW) | Interstate Power and Light Co | Creston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 94.1 GWh | Sep 2024 | Aug 2026 | Solar |
| Tully 1 | Greenbacker Renewable Energy Corporation | Morris, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2025 | Dec 2025 | Solar |
| Ledgeview | Greenbacker Renewable Energy Corporation | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Jul 2024 | Dec 2025 | Solar |
| Cherry Valley PV I | Cherry Valley PV I, LLC | Cherry Valley, AR | Midcontinent Independent System Operator, Inc. (MISO) | 165.5 GWh | - | Aug 2026 | Solar |
| Wolf River (Chipewa 1) | Greenbacker Renewable Energy Corporation | Stanley, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Jan 2024 | Dec 2025 | Solar |
| Crossett Solar | Cubico USA, LLC | Crossett, AR | Midcontinent Independent System Operator, Inc. (MISO) | 196.4 GWh | Aug 2024 | Aug 2026 | Solar |
| Crooked Creek PV I | Crooked Creek PV I, LLC | Salem, IL | Midcontinent Independent System Operator, Inc. (MISO) | 117.2 GWh | - | Aug 2026 | Solar |
| Surbrook Solar, LLC | Surbrook Solar, LLC | Rives Junction, MI | Midcontinent Independent System Operator, Inc. (MISO) | 19.6 GWh | Aug 2024 | Dec 2025 | Solar |
| USS Slayton Solar LLC (CSG) | United States Solar Corporation | Slayton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Lobelia 1 | Greenbacker Renewable Energy Corporation | Harvard, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Cooks Mill PV I | Cooks Mill PV I, LLC | Matoon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 115.9 GWh | - | Aug 2026 | Solar |
| Sherco Solar I | Northern States Power Co - Minnesota | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 444.6 GWh | Sep 2024 | Aug 2026 | Solar |
| USS Rosewood Solar LLC (CSG) | United States Solar Corporation | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Strix Solar | Madison Gas & Electric Co | Fitchburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.3 GWh | Dec 2024 | Dec 2025 | Solar |
| Sunlight Road Solar | Sunlight Road Solar, LLC | Franklinton, LA | Midcontinent Independent System Operator, Inc. (MISO) | 115.2 GWh | Oct 2024 | Aug 2026 | Solar |
| Dunns Bridge II Solar | Dunns Bridge II Solar and Storage Generation LLC | San Pierre, IN | Midcontinent Independent System Operator, Inc. (MISO) | 664.2 GWh | Dec 2024 | Aug 2026 | Solar |
| Heirloom Solar | Heirloom Solar (Ratts 1 Phase 2 Solar, LLC) | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 105.6 GWh | Sep 2025 | Aug 2026 | Solar |
| Forgeview Solar | Forgeview Solar, LLC | Blytheville, AR | Midcontinent Independent System Operator, Inc. (MISO) | 371.2 GWh | Nov 2025 | Aug 2026 | Solar |
| Harley-Davison Powertrain Operations | Wisconsin Electric Power Co | Menomonee Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Sep 2020 | Dec 2025 | Solar |
| Quartz Solar, LLC | RWE Clean Energy | Wynne, AR | Midcontinent Independent System Operator, Inc. (MISO) | 293.7 GWh | Feb 2025 | Aug 2026 | Solar |
| Eldorado Solar I | Sol Systems | Eldorado, IL | Midcontinent Independent System Operator, Inc. (MISO) | 312.7 GWh | Dec 2024 | Aug 2026 | Solar |
| Clinton Schools | Interstate Power and Light Co | Clinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Nov 2025 | Dec 2025 | Solar |
| SolarClub 03 | Nautilus Solar Solutions | Starbuck, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2023 | Dec 2025 | Solar |
| SolarClub 30 (CSG) | Nautilus Solar Solutions | Eden Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2025 | Solar |
| DSI Don Solar | DSI Don Solar LLC | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Crossover Wind | Crossover Wind, LLC | Wynne, AR | Midcontinent Independent System Operator, Inc. (MISO) | 428.5 GWh | May 2025 | Aug 2026 | Wind |
| DSI Julie Solar | DSI Julie Solar LLC | Cold Spring, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2024 | Dec 2025 | Solar |
| SV CSG AFTON I | SV CSG Afton I, LLC | Afton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jun 2024 | Dec 2025 | Solar |
| RATTS 1 | Ratts 1 Solar LLC | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 279.2 GWh | Sep 2025 | Aug 2026 | Solar |
| Sherburne Solar Holdings, LLC | REA Investments, LLC | Princeton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Feb 2021 | Dec 2025 | Solar |
| Sauk Solar Park | DTE Electric Company | Union City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 218.2 GWh | Dec 2024 | Aug 2026 | Solar |
| Pine River Solar Park | DTE Electric Company | Alma, MI | Midcontinent Independent System Operator, Inc. (MISO) | 124.6 GWh | May 2025 | Aug 2026 | Solar |
| Cedarville (IL) | Generate Capital | Freeport, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Crossroads Solar (IN) | Crossroads Solar, LLC - (IN) | Van Buren Township, IN | Midcontinent Independent System Operator, Inc. (MISO) | 285.2 GWh | Nov 2025 | Aug 2026 | Solar |
| Trimbelle (Pierce Pepin) | Greenbacker Renewable Energy Corporation | Hager City, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Ogema | Greenbacker Renewable Energy Corporation | Ogema, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Feb 2024 | Dec 2025 | Solar |
| Round Grove 2 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Oct 2021 | Dec 2025 | Solar |
| Hy-Vee Customer Hosted 2.25MW Solar | Interstate Power and Light Co | Chariton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jun 2024 | Dec 2025 | Solar |
| City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Jan 2021 | Dec 2025 | Solar |
| Perry Customer Hosted 1MW Solar Project | Interstate Power and Light Co | Perry, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Byrne Solar, LLC | Byrne Solar, LLC | Lowell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 10.3 GWh | Sep 2023 | Dec 2025 | Solar |
| Lightfoot Solar, LLC | Lightfoot Solar, LLC | Luzerne, MI | Midcontinent Independent System Operator, Inc. (MISO) | 18.1 GWh | Sep 2023 | Dec 2025 | Solar |
| Shipsterns Solar, LLC | Shipsterns Solar, LLC | Albion, MI | Midcontinent Independent System Operator, Inc. (MISO) | 40.8 GWh | Sep 2023 | Dec 2025 | Solar |
| Illinois PV Knox 1A | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Aug 2024 | Dec 2025 | Solar |
| Fond du Lac Community Solar | SoCore Energy LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2021 | Dec 2025 | Solar |
| ISU Customer Hosted 1MW Solar Project | Interstate Power and Light Co | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Apr 2024 | Dec 2025 | Solar |
| Round Grove 1 | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Oct 2021 | Dec 2025 | Solar |
| Rockford Plant | SoCore Energy LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Willford Solar, LLC | Willford Solar, LLC | Gladwin, MI | Midcontinent Independent System Operator, Inc. (MISO) | 41.1 GWh | Sep 2023 | Dec 2025 | Solar |
| Macomb 2A | SoCore Energy LLC | Macomb, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2024 | Dec 2025 | Solar |
| Illinois PV Knox 1B | SoCore Energy LLC | Yates City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2024 | Dec 2025 | Solar |
| GRE Cambridge Solar | SoCore Energy LLC | Cambridge, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Bayou Galion Solar Project | Bayou Galion Solar Project, LLC | Mer Rouge, LA | Midcontinent Independent System Operator, Inc. (MISO) | 209.1 GWh | Oct 2024 | Aug 2026 | Solar |
| DPC Madison | SoCore Energy LLC | Ridgeway, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jan 2019 | Dec 2025 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Dec 2023 | Dec 2025 | Solar |
| ATI | Wisconsin Electric Power Co | Cudahy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Oct 2020 | Dec 2025 | Solar |
| CREE | Wisconsin Electric Power Co | Racine, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2021 | Dec 2025 | Solar |
| Jones Dairy | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jun 2021 | Dec 2025 | Solar |
| Regal Ware | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Mar 2021 | May 2025 | Solar |
| Flat Fork Solar | Flat Fork Solar, LLC | Wheatley, AR | Midcontinent Independent System Operator, Inc. (MISO) | 444.6 GWh | Jul 2025 | Aug 2026 | Solar |
| Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 347.8 GWh | Feb 2024 | Aug 2026 | Solar |
| USS Golden Spike Solar LLC CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 379.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Marshall Solar Plus LLC | Western Minnesota Mun Pwr Agny | Marshall, MN | Midcontinent Independent System Operator, Inc. (MISO) | 17.2 GWh | Nov 2024 | Dec 2025 | Solar |
| Washington County | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Dec 2019 | Dec 2025 | Solar |
| UW Parkside | Wisconsin Electric Power Co | Kenosha, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Oct 2020 | Dec 2025 | Solar |
| Amite Solar, LLC | Amite Solar, LLC | Roseland, LA | Midcontinent Independent System Operator, Inc. (MISO) | 209.1 GWh | Feb 2025 | Aug 2026 | Solar |
| Cedar Rapids Community Solar | Interstate Power and Light Co | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jan 2024 | Dec 2025 | Solar |
| Fareway Customer Hosted 1 MW Solar | Interstate Power and Light Co | Boone, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2024 | Dec 2025 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 2023 | Dec 2025 | Solar |
| Driver Solar | Entergy Arkansas LLC | Osceola, AR | Midcontinent Independent System Operator, Inc. (MISO) | 431.1 GWh | Oct 2024 | Aug 2026 | Solar |
| Montgomery County Community Solar Center | Union Electric Co - (MO) | New Florence, MO | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Feb 2022 | Dec 2025 | Solar |
| Great Pathfinder Wind | Great Pathfinder Wind | Stratford, IA | Midcontinent Independent System Operator, Inc. (MISO) | 724.2 GWh | Jan 2023 | Aug 2026 | Wind |
| Northern Wind | Northern States Power Co - Minnesota | Lake Wilson, MN | Midcontinent Independent System Operator, Inc. (MISO) | 343.2 GWh | Dec 2022 | Aug 2026 | Wind |
| Deerfield Wind Energy 2 | Deerfield Wind Energy 2, LLC | Port Hope, MI | Midcontinent Independent System Operator, Inc. (MISO) | 278.8 GWh | Feb 2023 | Aug 2026 | Wind |
| Rock Aetna Power Partners | Northern States Power Co - Minnesota | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 84.2 GWh | Nov 2022 | Dec 2025 | Wind |
| Kossuth County Wind | Kossuth County Wind, LLC | Lu Verne, IA | Midcontinent Independent System Operator, Inc. (MISO) | 276.1 GWh | Nov 2022 | Aug 2026 | Wind |
| MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Oct 2022 | Dec 2025 | Solar |
| Elba Solar LLC | Elba Solar LLC | Williamsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2023 | Dec 2025 | Solar |
| Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 366.4 GWh | May 2023 | Aug 2026 | Solar |
| Buffalo Ridge Wind | Buffalo Ridge Wind, LLC | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 432.5 GWh | Nov 2022 | Aug 2026 | Wind |
| Rockford CS 1 | Rockford CS 1, LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Mar 2021 | Dec 2025 | Solar |
| Rockford CS 2 | Rockford CS 2, LLC | Rockford, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Mar 2021 | Dec 2025 | Solar |
| Walleye Wind | Walleye Wind, LLC | Beaver Creek, MN | Midcontinent Independent System Operator, Inc. (MISO) | 459.1 GWh | Nov 2022 | Aug 2026 | Wind |
| Kohler Solar | Wisconsin Power & Light Co | Kohler, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | May 2022 | Dec 2025 | Solar |
| Alden Road Harvard Solar 1 | Alden Road Harvard Solar 1, LLC | Harvard, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Cattail (CSG) | Cattail Solar, LLC | Fulton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | May 2022 | Dec 2025 | Solar |
| ENGIE 2020 ProjectCo-WI1 LLC | ENGIE 2020 ProjectCo-WI1 LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Kankakee 2 | Kankakee Solar 2 LLC | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2022 | Dec 2025 | Solar |
| USS Peach Solar LLC | United States Solar Corporation | Mankato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2022 | Dec 2025 | Solar |
| USS Wolf Solar LLC | United States Solar Corporation | Wood Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2023 | Dec 2025 | Solar |
| USS Dressen Family Solar LLC | United States Solar Corporation | Mayer, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2023 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |