Tully 1
5239 W Duppount Rd, Morris, IL 60450Plant Summary Information
Tully 1 is ranked #237 out of 309 solar farms in Illinois in terms of total annual net electricity generation.
Tully 1 generated 767.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Tully 1 |
|---|---|
| Utility Name | Greenbacker Renewable Energy Corporation |
| Location | Grundy County, IL |
| Initial Operation Date | July 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 2.2 GWh |
| Annual Consumption | 7.6 k MMBtu |
| Ranked #10,561 out of 13,081 Power Plants Nationwide | |
| Ranked #5,465 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #376 out of 483 Illinois Power Plants | |
| Ranked #237 out of 309 Illinois Solar Power Plants | |
| Fuel Types | Solar |
Map of Tully 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tully 1.
Monthly Net Generation for Tully 1
Monthly Plant Fuel Consumption for Tully 1
Tully 1 Details
| Summary Information | |
|---|---|
| Plant Name | Tully 1 (67255) |
| Plant Address | 5239 W Duppount Rd, Morris, IL 60450 |
| Utility | Greenbacker Renewable Energy Corporation (60025) |
| Latitude, Longitude | 41.30302, -88.50709 |
| Generation Dates on File | Jul 2025 to Dec 2025 |
| Initial Operation Date | July 2025 |
| Annual Generation | 2.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | pending |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator 814 Details Operating July 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 3.07 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3 MW |
| Virtual Net Metering Agreement | No |
Tully 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5455 | Andresen Solar | Clara City, MN | 2.2 GWh |
| #5456 | USS Riley Solar LLC (CSG) | Montevideo, MN | 2.2 GWh |
| #5457 | Studebaker | Fredonia, KS | 2.2 GWh |
| #5458 | 601 Doremus CDG | Newark, NJ | 2.2 GWh |
| #5459 | Dodge Renewables 1 | Dodge Center, MN | 2.2 GWh |
| #5460 | Maxton Solar, LLC | Maxton, NC | 2.2 GWh |
| #5461 | Harrah's Atlantic City - POI 2 (Self Par | Atlantic City, NJ | 2.2 GWh |
| #5462 | CREE | Racine, WI | 2.2 GWh |
| #5463 | Lakeland Electric Co. (FL) - Airport II | Lakeland, FL | 2.2 GWh |
| #5464 | Marshall Solar | Hartsville, SC | 2.2 GWh |
| #5466 | Fairhaven C CSG | Fairhaven, MA | 2.2 GWh |
| #5467 | Wolverine Solar | Maynard, MN | 2.2 GWh |
| #5468 | USS Slayton Solar LLC (CSG) | Slayton, MN | 2.2 GWh |
| #5469 | Curry Solar | Reidsville, GA | 2.2 GWh |
| #5470 | USS Rosebud Solar LLC | Morgan, MN | 2.2 GWh |
| #5471 | SolarClub 35 LLC | Mankato, MN | 2.2 GWh |
| #5472 | Dynamic Energy NJ - Ferrero | Somerset, NJ | 2.2 GWh |
| #5473 | MD JESSUP 7950 OCEANO AVE | Jessup, MD | 2.2 GWh |
| #5474 | Petit Jean | Clinton, AR | 2.2 GWh |
| #5475 | Chesapeake College | Wye Mills, MD | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tully 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ahern Community Solar I, LLC | Morris, IL | 3.1 GWh | 16.5 mi |
| Beckham Solar LLC | Odell, IL | 302.0 MWh | 18.9 mi |
| Blackstone Wind Farm II LLC | Dwight, IL | 481.5 GWh | 11.3 mi |
| Blackstone Wind Farm LLC | Ransom, IL | 237.7 GWh | 12.1 mi |
| Braidwood Generation Station | Braceville, IL | 19.6 TWh | 15 mi |
| CPV Three Rivers Energy Center | Morris, IL | 6.5 TWh | 12.5 mi |
| Dayton Hydro | Ottawa, IL | 9.9 GWh | 15.8 mi |
| Dresden Generating Station | Morris, IL | 15.1 TWh | 13.7 mi |
| ExxonMobil Oil Joliet Refinery | Channahon, IL | 188.2 GWh | 18.5 mi |
| Grand Ridge Solar Farm | Marseilles, IL | 31.0 GWh | 17.1 mi |
| Grand Ridge Wind Energy Center | Marseilles, IL | 447.2 GWh | 10.6 mi |
| Keeversville Solar CSG | Braidwood, IL | 3.6 GWh | 15.3 mi |
| Kendall County Generation Facility | Minooka, IL | 5.5 TWh | 17.8 mi |
| LaSalle Generating Station | Marseilles, IL | 18.5 TWh | 9.3 mi |
| LaSalle Solar 1 | Ransom, IL | 1.9 GWh | 11.5 mi |
| LaSalle Solar 6 | Ottawa, IL | 582.0 MWh | 18.9 mi |
| Morris Cogeneration LLC | Morris, IL | 621.2 GWh | 11.8 mi |
| Streator Cayuga Ridge South | Odell, IL | 660.2 GWh | 21.2 mi |
| SV Gardner 1 (Lutz) CSG | Gardner, IL | 4.2 GWh | 13 mi |
| Water Lily Solar LLC | Minooka, IL | 388.0 MWh | 17.6 mi |