Louise Solar
13850 680th Ave, Taopi, MN 55877Plant Summary Information
Louise Solar is ranked #5 out of 505 solar farms in Minnesota in terms of total annual net electricity generation.
Louise Solar generated 12.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Louise Solar |
|---|---|
| Utility Name | National Grid Renewables |
| Location | Mower County, MN |
| Initial Operation Date | December 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 92.7 GWh |
| Annual Consumption | 334.2 k MMBtu |
| Ranked #3,537 out of 12,637 Power Plants Nationwide | |
| Ranked #875 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #64 out of 759 Minnesota Power Plants | |
| Ranked #5 out of 505 Minnesota Solar Power Plants | |
| Fuel Types | Solar |
Map of Louise Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Louise Solar.
Monthly Net Generation for Louise Solar
Monthly Plant Fuel Consumption for Louise Solar
Louise Solar Details
| Summary Information | |
|---|---|
| Plant Name | Louise Solar (67167) |
| Plant Address | 13850 680th Ave, Taopi, MN 55877 |
| Utility | National Grid Renewables (62759) |
| Latitude, Longitude | 43.562, -92.683 |
| Generation Dates on File | Dec 2024 to Feb 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 92.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | ITC Midwest LLC (56161) |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
Generator LSSLR Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 67.2 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Louise Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #865 | Little Manatee River Solar | Ruskin, FL | 94.9 GWh |
| #866 | Lake Hancock Solar | Bartow, FL | 94.4 GWh |
| #867 | CM48 | Boulder City, NV | 94.3 GWh |
| #868 | Millington Solar Farm | Millington, TN | 94.3 GWh |
| #869 | Troy Solar | Troy, IN | 94.2 GWh |
| #870 | Warsaw Farm | Warsaw, NC | 93.9 GWh |
| #871 | Pearl Solar | Fort Stockton, TX | 93.7 GWh |
| #872 | Monroe Solar Facility | Monroe, NC | 93.4 GWh |
| #873 | Five Points Solar Park | Five Points, CA | 93.3 GWh |
| #874 | Sumrall I Solar Farm | Sumrall, MS | 93.0 GWh |
| #876 | Black Hollow Sun | Auit, CO | 92.1 GWh |
| #877 | Stoneridge Solar, LLC | Thorndale, TX | 92.0 GWh |
| #878 | Edwards Sanborn S4 | Mojave, CA | 89.8 GWh |
| #879 | Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh |
| #880 | Prineville Solar Energy LLC | Prineville, OR | 89.9 GWh |
| #881 | Innovative Solar 42 | Fayetteville, NC | 89.8 GWh |
| #882 | Big Bend II Solar | Apollo Beach, FL | 89.6 GWh |
| #883 | Stanly Solar, LLC | Albemarle, NC | 89.2 GWh |
| #884 | Coffeen Solar BESS | Coffeen, IL | 88.9 GWh |
| #885 | Highest Power Solar, LLC | Louisburg, NC | 88.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Louise Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Wind Farm | Adams, MN | 20.2 GWh | 2.1 mi |
| Barton Windpower LLC | Kensett, IA | 360.9 GWh | 23.6 mi |
| Buffalo Center Wind LLC | Little Cedar, IA | 4.8 GWh | 12.8 mi |
| Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh | 15.5 mi |
| Fillmore County Solar Project | Spring Valley, MN | 83.0 GWh | 16.3 mi |
| Freeborn Wind Farm | Glenville, MN | 761.6 GWh | 25.5 mi |
| Grand Meadow | Dexter, MN | 380.3 GWh | 10.9 mi |
| Hayfield Solar I LLC CSG | Hayfield, MN | 1.5 GWh | 24.7 mi |
| Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh | 26.2 mi |
| Maple City | Osage Township, IA | 3.1 GWh | 20.3 mi |
| Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh | 5.5 mi |
| Osage (IA) | Osage, IA | 5.6 GWh | 20.5 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 839.8 GWh | 6.4 mi |
| Pleasant Valley (MN) | Dexter, MN | 85.9 GWh | 16.4 mi |
| Pleasant Valley Wind Farm | Dexter, MN | 770.3 GWh | 17.3 mi |
| Prairie Star Wind Farm | Grand Meadow, MN | 298.2 GWh | 9 mi |
| Saratoga Wind Farm | Lime Springs, IA | 258.1 GWh | 21.6 mi |
| Spring Valley | Spring Valley, MN | 156.8 MWh | 17 mi |
| Turtle Creek Wind Farm LLC | St. Ansgar, IA | 699.3 GWh | 12.1 mi |
| Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh | 16.5 mi |