ENGIE 2020 ProjectCo-WI1 LLC
N5306 Hickory Road, Fond Du Lac, WI 54937Plant Summary Information
ENGIE 2020 ProjectCo-WI1 LLC is ranked #72 out of 91 solar farms in Wisconsin in terms of total annual net electricity generation.
ENGIE 2020 ProjectCo-WI1 LLC generated 324.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | ENGIE 2020 ProjectCo-WI1 LLC |
|---|---|
| Utility Name | ENGIE 2020 ProjectCo-WI1 LLC |
| Location | Fond du Lac County, WI |
| Initial Operation Date | December 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 2.1 GWh |
| Annual Consumption | 7.3 k MMBtu |
| Ranked #10,372 out of 12,539 Power Plants Nationwide | |
| Ranked #5,161 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #203 out of 239 Wisconsin Power Plants | |
| Ranked #72 out of 91 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of ENGIE 2020 ProjectCo-WI1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ENGIE 2020 ProjectCo-WI1 LLC.
Monthly Net Generation for ENGIE 2020 ProjectCo-WI1 LLC
ENGIE 2020 ProjectCo-WI1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | ENGIE 2020 ProjectCo-WI1 LLC (65659) |
| Plant Address | N5306 Hickory Road, Fond Du Lac, WI 54937 |
| Utility | ENGIE 2020 ProjectCo-WI1 LLC (64930) |
| Latitude, Longitude | 43.73503, -88.47378 |
| Generation Dates on File | Jan 2022 to Dec 2024 |
| Initial Operation Date | December 2021 |
| Annual Generation | 2.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF21-1038 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Wisconsin Power & Light Co (20856) WI |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Tilt Angle | 30 |
| DC Net Capacity | 1.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
ENGIE 2020 ProjectCo-WI1 LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Project Comapny FinCo Phase V LLC | 1360 Post Oak Blvd, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5151 | FELPS 6- Floresville West | Floresville, TX | 2.1 GWh |
| #5152 | FELPS 7- Floresville West | Floresville, TX | 2.1 GWh |
| #5153 | Broadalbin-Perth Solar | Amsterdam, NY | 2.1 GWh |
| #5154 | Iris Solar, LLC (MN) | Nicollet, MN | 2.1 GWh |
| #5155 | Spruce - WCMD - Creek | Hagerstown, MD | 2.1 GWh |
| #5156 | Novel Denzer Solar LLC CSG | Minnesota City, MN | 2.1 GWh |
| #5157 | Westport Community Solar, LLC | Lake Lillian, MN | 2.1 GWh |
| #5158 | USS All In Solar LLC CSG | Hartland, MN | 2.1 GWh |
| #5159 | Plato CSG1, LLC | Glencoe, MN | 2.1 GWh |
| #5160 | Novel Huneke Solar LLC CSG | Zumbrota, MN | 2.1 GWh |
| #5162 | Mt. Hope DPC Solar | Mt. Hope, WI | 2.1 GWh |
| #5163 | CSU Sacramento I | Sacramento, CA | 2.1 GWh |
| #5164 | Ogema | Ogema, WI | 2.1 GWh |
| #5165 | Fond du Lac Community Solar | Fond Du Lac, WI | 2.1 GWh |
| #5166 | Sand Lake DPC Solar | Centuria, WI | 2.1 GWh |
| #5167 | Winona Solar | Altura, MN | 2.1 GWh |
| #5168 | Sacramento Point West Medical Offices | Sacramento, CA | 2.1 GWh |
| #5169 | Agawam Solar | Agawam, MA | 2.1 GWh |
| #5170 | Woburn | Woburn, MA | 2.1 GWh |
| #5171 | Huneke CSG 2, LLC | Zumbrota, MN | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ENGIE 2020 ProjectCo-WI1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant Energy Neenah | Neenah, WI | 739.9 GWh | 31.7 mi |
| Auburn Solar WI, LLC | Campbellsport, WI | 80.0 MWh | 15 mi |
| Beaver Dam Solar | Dodge, WI | 100.5 GWh | 22.8 mi |
| Berlin Landfill Gas | Berlin, WI | 13.6 GWh | 27 mi |
| Blue Sky Green Field Wind Project | Fond du Lac, WI | 340.8 GWh | 14.2 mi |
| Butler Ridge | Mayville, WI | 140.2 GWh | 23.1 mi |
| Cedar Ridge | Eden, WI | 174.6 GWh | 7.8 mi |
| Fond du Lac Community Solar | Fond Du Lac, WI | 2.1 GWh | 0.1 mi |
| Forward Wind Energy Center | Brownsville, WI | 145.7 GWh | 8.3 mi |
| Glacier Hills | Cambria, WI | 374.6 GWh | 35.7 mi |
| Jackson Solar WI, LLC | Cedarburg, WI | 3.7 GWh | 35.1 mi |
| Kohler Solar | Kohler, WI | 2.6 GWh | 35.4 mi |
| Ledgeview | Fond du Lac, WI | 2.2 GWh | 7.1 mi |
| Onion River | Sheboygan Cedar Grove, WI | 252.6 GWh | 30.3 mi |
| Regal Ware | West Bend, WI | 2.8 GWh | 25.5 mi |
| Sheboygan Falls | Sheboygan, WI | 642.5 GWh | 29.8 mi |
| South Fond Du Lac | Fond du Lac, WI | 5.4 GWh | 1.1 mi |
| Springfield Solar (WI) | Lomira, WI | 202.6 GWh | 9.2 mi |
| Washington County | West Bend, WI | 3.8 GWh | 26.1 mi |
| Winnebago County Landfill Gas | Oshkosh, WI | 8.8 GWh | 24.3 mi |