Woodruff County Solar
13481 Hwy 33 N, Augusta, AR 72006Plant Summary Information
Woodruff County Solar is ranked #37 out of 98 power plants in Arkansas in terms of total annual net electricity generation.
Woodruff County Solar generated 62.4 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Woodruff County Solar |
---|---|
Utility Name | Arkansas Electric Coop Corp |
Location | Woodruff County, AR |
Initial Operation Date | October 2024 |
Last Update | Jun 2025 |
Annual Generation | 155.9 GWh |
Annual Consumption | 532.1 k MMBtu |
Ranked #2,738 out of 12,327 Power Plants Nationwide | |
Ranked #475 out of 6,200 Solar Power Plants Nationwide | |
Ranked #37 out of 98 Arkansas Power Plants | |
Ranked #11 out of 52 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Woodruff County Solar (2022 to 2022) Arkansas Electric Coop Corp (2023 to 2024) |
Map of Woodruff County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodruff County Solar.
Monthly Net Generation for Woodruff County Solar
Woodruff County Solar Details
Summary Information | |
---|---|
Plant Name | Woodruff County Solar (66282) |
Plant Address | 13481 Hwy 33 N, Augusta, AR 72006 |
Utility | Arkansas Electric Coop Corp (807) |
Latitude, Longitude | 35.25626, -91.34019 |
Generation Dates on File | Oct 2024 to Jun 2025 |
Initial Operation Date | October 2024 |
Annual Generation | 155.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arkansas Electric Coop Corp (807) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator PV1 Details Operating October 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Minimum Load | 4.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
East West Fixed Tilt | Yes |
Bifacial | Yes |
Tilt Angle | 52 |
DC Net Capacity | 148.94 MW |
Other Materials | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Woodruff County Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#465 | Peacock Energy Project | Taft, TX | 158.6 GWh |
#466 | Altavista Solar | Lynch Station, VA | 158.6 GWh |
#467 | Misenheimer Solar LLC | Gold Hill, NC | 158.6 GWh |
#468 | Wever Solar (150MW) | Wever, IA | 157.8 GWh |
#469 | Huntley | Bowman, SC | 157.5 GWh |
#470 | SR Cedar Springs, LLC | Blakely, GA | 157.4 GWh |
#471 | Silver Palm | TBD, FL | 156.7 GWh |
#472 | Willow Solar Energy Center | Myakka City, FL | 156.5 GWh |
#473 | Bluegrass Solar | Church Hill, MD | 156.1 GWh |
#474 | Walnut Bend Solar Station PV | Moro, AR | 156.0 GWh |
#476 | Gutenberg Solar | Garysburg, NC | 155.9 GWh |
#477 | Cove Mountain Solar | Beryl, UT | 155.7 GWh |
#478 | High Springs Solar Power Plant | High Springs, FL | 155.6 GWh |
#479 | Sandrini Solar 100 | Mettler, CA | 155.4 GWh |
#480 | Caloosahatchee | Clewiston, FL | 155.2 GWh |
#481 | Paris Solar | Union Grove, WI | 154.7 GWh |
#482 | Powells Creek Solar - Hybrid | Alton, VA | 154.7 GWh |
#483 | SR Perry | Perry, GA | 154.3 GWh |
#484 | Carvers Creek Solar | Gloucester, VA | 154.2 GWh |
#485 | Stuttgart Solar | Stuttgart, AR | 154.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodruff County Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Crossover Wind | Wynne, AR | 12.9 GWh | 33.5 mi |
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 26.5 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 33.7 mi |
Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 35.7 mi |
Greers Ferry Lake | Heber Springs, AR | 163.4 GWh | 41.2 mi |
Happy Solar 1 | Searcy, AR | 215.1 GWh | 19.1 mi |
Independence Steam Electric Station | Newark, AR | 5.3 TWh | 29.4 mi |
Jonesboro City Water & Light Plant | Jonesboro, AR | 78.0 GWh | 53.6 mi |
Jonesboro CWL Solar Park | Jonesboro, AR | 22.1 GWh | 57.6 mi |
Newport Solar Project | Newport, AR | 344.0 GWh | 29.8 mi |
Quartz Solar, LLC | Wynne, AR | 112.3 GWh | 31.2 mi |
Searcy Solar Hybrid | Searcy, AR | 204.3 GWh | 19.8 mi |
Stuttgart Solar | Stuttgart, AR | 154.1 GWh | 56.7 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh | 54.7 mi |
Walnut Bend Solar Station PV | Moro, AR | 156.0 GWh | 31 mi |
West Memphis Solar Station | Crawfordsville, AR | 196.8 GWh | 58.5 mi |
White River Lock and Dam 1 | Batesville, AR | 12.4 GWh | 38.4 mi |
White River Lock and Dam 2 | Locust Grove, AR | 12.7 GWh | 41.3 mi |
White River Lock and Dam 3 | Marcella, AR | 24.7 GWh | 49.7 mi |
Woodruff Electric Cooperative | Forrest City, AR | 2.2 GWh | 32.7 mi |